Introduction

The accelerating structures in the BEPCII Linac are powered by 20 klystrons [1]. The output window of the klystron is the key part of isolating the vacuum environment between inside and outside of a klystron, which will seriously affect the life of the klystron if broken. Therefore, effectively protecting the klystron output window from being broken has been a key subject in the last years.

The conventional methods for protection include reflection-based [2] and vacuum protection [3]. The former is based on the measurement of the reflected RF power picked by a waveguide directional coupler and transmitted to the peak power meter [4]. If the measured reflected power value exceeds the protection threshold of 2 MW, the output level of the peak power meter will change, and the trigger of the klystron modulator will be turned off by the interlock box. Meanwhile, vacuum protection is based on the measured value of the vacuum meter or the vacuum pump current. Similar to the reflection-based protection, the trigger will be turned off if the value exceeds the protection threshold. However, both methods have their natural weak points.

Reflection-based protection relies on the accurate measurement of the reflected power and the fast response. The response time of the reflection-based protection can now reach several microseconds due to the application of the digital technology [2]. However, the accurate measurement of the power level is an important issue because the reflected power waveform is always uneven, with a few considerably high points. Therefore, balancing the number of the sampling points and the algorithm is difficult when the reflected power is being measured. Excessive sampling points may slow down the calculation and miss the instantaneous reflection surge. On the contrary, very few points may miss the reflection power peak. The operation becomes unstable if the interlock works too often just because of several points above the threshold (assuming now that the average reflected power is far below the threshold within the pulse width). For the newly installed klystron and waveguide, the output power of the klystron lower than 2 MW is also the gassing out point. The output window may be damaged, but the 2 MW protection threshold cannot be reached even if the total power is reflected. The secondary electron multiplication effect in the low power range is also a great threat to the output window, which cannot be protected by the reflection-based protection.

Vacuum protection is relatively more accurate. However, from gassing to interlock protection, which undergoes value changing of the vacuum gauge or pump current, and data transmission takes a long process. Consequently, the output window may be damaged because of the delayed response.

When arcing happens, the vacuum deterioration and reflection increase, and the light signal generation always simultaneously occurs, among which the light signal is the fastest for detection, transmission, and processing. Therefore, the arcing-based protection system is introduced into the BEPCII Linac according to experiences of other laboratories [5] and our colleagues in the RF group.

System design and off-line test

Figure 1 illustrates the arcing-based protection system. The E-bend waveguide observation window is connected to the klystron output waveguide. The observation window is facing to the klystron output window with a hole on the wide wall of the E-bend waveguide. The vacuum is sealed by using a special type of glass with a ConFlat flange.

Fig. 1
figure 1

Schematic of the arcing-based protection system

An optical fiber is connected to the observation window by a structure designed for totally blocking outside light. The optical fiber has a strong light-concentrating structure at the end, enabling it to detect light higher than 2 lx. The arcing detection module will give an output signal within 7 μs according to the brightness. Considering the whole process of light detection, transmission, and processing, the estimated total time from the arcing light generation to trigger tuning off should be less than 50 μs. The highest pulse repetition rate of the BEPCII Linac is 50 Hz (20 ms); hence, the arcing-based protection system can turn off the trigger before the arrival of the next pulse, thereby protecting the klystron output window from being broken. The light signal is a direct physical quantity; thus, compared with the reflection-based and vacuum protection, the arcing-based protection system has the advantages of direct and accurate measurement and fast response time.

The system design and the off-line test mainly consist of the design and test of the E-bend waveguide observation window, selection of the arcing detection module, and off-line joint test.

Design and test of the E-bend waveguide observation window

The traditional E-bend waveguide for BEPCII is a 90° bend with a sectional dimension of 144 * 144 mm (shown in the middle of Fig. 2). The female flange is the input port, while the male flange is the output. The arcing phenomenon on the output window can be observed by adding an observation window, which is vertical to the female flange. The E-bend waveguide observation window is shown on the top of Fig. 2.

Fig. 2
figure 2

Prototype (top) and simulation model (bottom) of the E-bend waveguide observation window, brief drawing of the traditional E-bend waveguide (middle)

The E-bend waveguide observation window was simulated by using the FEA (finite element analysis) software CST (computer simulation technology) [6]. The input voltage standing wave ratio (VSWR), insertion loss (IL), leaked field at the observation window, and the maximal electric field inside the structure were considered. The simulation model is shown at the bottom of Fig. 2. We defined port 1 as the input port, port 2 as the output port, and port 3 as the observation window.

The frequency response of S11 (VSWR) and S31 (i.e., the leaked filed, also known as the isolation) is presented at the top inset of Fig. 3, whereas the electric field distribution is depicted at the bottom. The simulation results at the central frequency of 2856 MHz are as follows: S11 was − 35.25 dB (VSWR: 1.035), IL (S21) was − 0.076 dB, and isolation (S31) was − 211.2 dB. The electric field distribution also showed that much of the electric field transmitted inside the waveguide (red), while a few leaked from port 3 (dark blue) because of the microwave cutoff effect.

Fig. 3
figure 3

Frequency response of S11 and S31 (top) and electric field distribution (bottom) of the E-bend waveguide observation window

The isolation of − 211.2 dB means that the leaked field from port 3 was only in femtowatt (10−15 W) for a 50 MW input power, which can be neglected.

The structure was also chamfered at the connection between the window and the waveguide wall to reduce the maximum electric field value inside and avoid breakdown. The quantitative simulation showed that with a maximum input power of 50 MW, the maximum electric field in the waveguide was 15.5 MV/m, which is much smaller than the breakdown field of 45.8 MV/m of the S-band high vacuum RF structure. This result indicates that no risk of breakdown exists.

The measurement and simulation results at 2856 MHz are as follows: S11: − 28.09/− 35.25 dB (corresponding to the VSWR of 1.082/1.035) and IL: − 0.15/− 0.076 dB. The measurement results were slightly worse than the simulation. However, they met the requirements, and the prototype worked stably online after installation.

Selection of the arcing detection module and the off-line joint test

The ARC4 type of German AFT Company was adopted as the arcing detection module, composed of a cabinet, an arcing detection board, and an optical fiber.

The off-line joint test was conducted after the fabrication and the measurement of the E-bend waveguide observation window. The arcing detection module can output a high- or low-level signal from the BNC port; the signal amplitude is proportional to the brightness of the captured light, which can be used as the input signal of the interlock box to protect the klystron output window.

System assembling and online operation

In the summer of 2018, the arcing-based protection system was assembled at the K6 position of the BEPCII Linac with a new klystron. The structure on the observation window could fix the fiber connector and block the light from outside. Simultaneously, the arcing detection module was installed in the cabinet of K6. Figure 4 shows the installed arcing detection module (top) and the E-bend waveguide observation window with an optical fiber (bottom).

Fig. 4
figure 4

Installed arcing detection module (top) and E-bend waveguide observation window with optical fiber (bottom)

The system worked stably during the following annual operation year. The light signal was successfully captured, and the interlock worked well. Figure 5 shows an arcing-based protection in December of 2018, in which the red (highest) curve denotes the count of the arcing numbers, and the blue (second highest) curve represents the vacuum value. The arcing-based protection system very clearly worked (i.e., the counted number of arcing increased by one in the curve) when the vacuum worsened (i.e., two peaks in the curve). Figure 5 also illustrates that the arcing-based protection is faster than the vacuum protection. However, the second vacuum protection (second peak in blue curve) had no detected arcing (no step in red curve), which means that the reflection-based and vacuum protection are still needed in spite of the advantages of the arcing-based protection system. Because if no arcing happens when the vacuum deteriorates, the reflection-based and vacuum protection are necessary for preventing the klystron output window being broken.

Fig. 5
figure 5

Captured arcing light signal and vacuum change in December 2018

Conclusions

In this study, the arcing-based protection system assembled online was found to work well. Moreover, the light signal was successfully captured, and the interlock function worked fine. The system is expected to be applied to other klystron locations in the future.