Access to freshwater is one of the most critical challenges in drought-prone regions of India due to climate change and population growth. However, societal costs due to people displacement are often ignored while evaluating interlinking of rivers (ILR) projects though people displacement is one of the most significant impacts of ILR projects in densely populated countries. Therefore, the authors expand the scope of Integrated Water Resources Management (IWRM) by incorporating land use and land cover as key criteria in the Multi-Criteria Decision-Making (MCDM) method. The project alternatives for the proposed Almatti-Pennar (A-P) ILR project developed in this study were evaluated by applying geospatial techniques and the MCDM method before consulting expert stakeholders to finalize the optimal configuration of this project. The optimal A-P ILR configuration will utilize the existing reservoirs and canal systems and reduce the length of the proposed 587 km long link canal by 200 km. This will expedite the ILR project by reducing project-related deforestation, people displacement, and cost. This integrated approach using geospatial techniques and the MCDM method can be applied to ILR projects to achieve Sustainable Development Goal (SDG) 2 (zero hunger) and SDG target 6.1 (safe and affordable drinking water) by reducing water stress.
Similar content being viewed by others
Introduction
The 2030 Agenda for Sustainable Development includes 17 Sustainable Development Goals or SDGs (United Nations, 2015). Of the 17 SDGs, Goal 6 (SDG 6) is to “ensure availability and sustainable management of water and sanitation for all.” Water scarcity has become a severe problem worldwide due to population growth and increasing water demand and can be quantified using various indices based on human and ecological water needs (Best, 2019; Brown & Matlock, 2011; Purvis & Dinar, 2020). Recognizing the seriousness of this issue, water security has been emphasized as a priority in Sustainable Development Goal 6 (UNEP, 2021). However, water resources are unevenly distributed across time and space, causing floods and drought (Gupta & van der Zaag, 2008). For example, in India, devastating floods impact one part of the nation almost every year, while at the same time, drought strikes another part of the country, impacting agriculture and the economy (Khanna et al., 2007; Lakshmi et al., 2014). Interlinking of Rivers (ILR) is often used to alleviate water shortages since they also minimize the flood and drought risks as the water moves from surplus to deficit basins through engineered structures (Amarasinghe and Sharma, 2008; Davies et al., 1992).
The preamble to the SDGs states that they are integrated and indivisible since the action in one area will affect outcomes in others (United Nations, 2015). However, their implementation in the real world has focused almost entirely on single goals (Alcamo et al., 2020). Considering the interconnected nature of economic, social, and environmental dimensions of sustainable development, the only way to achieve SDG 6 is through an integrated approach (Glass & Newig, 2019; Kroll et al., 2019; Oliveira et al., 2019; Pradhan et al., 2017). Alcamo et al. (2020) assert that as developing countries recover from the impact of the COVID-19 pandemic, "an integrative approach to the SDGs has the potential to be a cost-effective way for countries to advance many SDGs simultaneously.”
Integrated Water Resources Management (IWRM) is a process that supports the “integrated development and management of water, land, and related resources to maximize economic and social welfare equitably without threatening ecosystem sustainability by bringing stakeholders from various sectors and regions” (UNDP, 2019; UNEP, 2022). An integrated approach will enable the community and/or country to realize the synergies between various SDGs and minimize the trade-offs between the SDGs. The need for an integrated approach to realize the SDGs is often evident in ILR projects that are delayed due to conflicts of interest related to ecological damages, displacement of people, forest land, and poor governance (Das, 2006). Several ILR projects have also been criticized for having irreversible environmental consequences such as alteration of the river morphology in the downstream areas (Howe & Easter, 2013; McCully, 1996). On the other hand, sustainability is often equated with environmental protection or long-term strategies while the social impacts of major projects on the local communities are not given due importance (Newig et al., 2007).
Recognizing India’s severe water security issues, the Ministry of Jal Shakti, Government of India (GoI) has conducted water balance studies for the optimum utilization of water resources and has delineated 16 feasible ILR links under the Peninsular component (NWDA, 2005). However, on 21 May 2022, GoI cancelled the Damanganga-Par-Tapi-Narmada link project at the request of the Chief Minister of the State of Gujarat after continuous protest from tribals against this ILR project fearing displacement with all its attendant consequences (Vaktania, 2022). Therefore, it is critical to give due importance to aspects related to people displacement and Rehabilitation & Resettlement (R & R) during the design of ILR projects. Geospatial techniques can be used for this purpose along with suitable ground-truthing and must therefore be used more widely during the preparation of feasibility reports for ILR projects.
The Almatti-Pennar Interlinking of Rivers (A-P ILR) Project is one of the 16 Peninsular links proposed by the National Water Development Agency (NWDA). This link is intended to bring surplus Krishna (i.e., in partial exchange of Godavari water) to the drought-stricken command area in the Ballari and Raichur districts in Karnataka and the Ananthapuramu district in Andhra Pradesh (AP) through a 587-km gravity canal (NWDA, 2005). However, the A-P ILR Project must be reassessed since the Government of Andhra Pradesh (GoAP) has constructed Phase-2 of the Handri Niva Sujala Sravanthi (HNSS) project which overlaps the proposed A-P ILR project between Reduced Distance (RD) 386 km and RD 587 km as shown in Fig. 1.
Further, large engineering projects like ILR projects are only acceptable by society at large if they are scientifically investigated and satisfy the following criteria (Gupta & van der Zaag, 2008).
-
The donor basin must have a surplus, while the recipient basin must have a deficit.
-
The project must be built sustainably, considering economic, social, and environmental factors.
-
When implementing such interstate projects, a good governance process should be adopted between all stakeholder states.
-
The project should respect existing rights, and appropriate compensating mechanisms should be agreed upon as needed.
-
Displacement of people must be avoided.
Most pre-feasibility assessments of ILR projects in India were conducted using data gathered from time-consuming and expensive ground surveys. Therefore, conventional techniques used to study ILR projects are tedious and time-consuming due to a lack of current data on the physical and hydrological characteristics of the watershed (Kumar and Reshmidevi, 2013; Lakshmi et al., 2014). The Multi-Criteria-Decision-Making (MCDM) method is the most effective technique for tackling problems with multi-objective criteria. Several MCDM procedures have been developed to aid decision-makers, including the analytical hierarchy process (AHP), multi-attribute utility theory (MAUT), and simple additive weighting (SAW) (Gebre et al., 2021).
The MCDM method combined with geospatial techniques (to extract the latest data related to all relevant parameters) is highly suitable for interdisciplinary research on ILR projects which must necessarily address multiple design criteria (hydrology, land, ecology, forest, safety, and economics) as well as several stakeholders including local communities, project-affected-persons, and civil society. However, studies using the MCDM method along with remote sensing and GIS techniques to analyze ILR projects are hardly published in India. This is the vital research gap that the present study tries to bridge.
The first key objective of the present study is to demonstrate the integration of remote sensing and GIS techniques with the Analytical Hierarchy Process (AHP)-based MCDM method to evaluate alternative alignments for ILR projects based on multiple criteria, by using the proposed A-P ILR Project as a case study. These criteria include societal concerns related to people displacement and environmental issues linked to deforestation along with geomorphological, slope and soil parameters. The second key objective of this study is to finalize the optimal configuration for the A-P ILR Project by conducting expert stakeholder consultations based on the alternative alignments developed for this ILR project by integrating remote sensing and GIS techniques with the MCDM method. The demonstration of the mixed method using both quantitative and qualitative techniques to evaluate alternative alignments for an ILR Project in this study is expected to bridge the research gap in the assessment of ILR projects based on the key criteria proposed by Gupta and van der Zaag (2008). Following this introduction, the study area is described in “Study Area” Section. “Data and methods” Section summarizes data and methods used to develop alternative configurations of the A-P ILR Project using an integrated approach to development and environment. “Results and Discussion” Section presents the results and discussions, while the conclusions of this study are summarized in “Summary and Conclusions” Section
Study Area
The study area discussed in this paper is in the Ananthapuramu district in the state of Andhra Pradesh (AP) and forms a part of the command area of the proposed A-P ILR Project as well as the existing HNSS Project as shown in Fig. 1. It is situated in the south-western part of AP between 14° 47′ 31.05″ N–14° 34′ 33.95″ N and 77° 14′ 16.19″ E–77° 21′ 50.93″ E. The study area falls under a scarce rainfall agroclimatic zone as per the India Meteorological Department’s classification. Ananthapuramu district receives the second-lowest amount of rainfall in India, only next to Jaisalmer district in Rajasthan putting considerable strain on the socioeconomic conditions of the people living in this district (Anantha et al., 2021; GoAP, 2020; IMD, 2019; MoF, 2021; Reddy et al., 2008). The Long-Period-Average (LPA) rainfall recorded in the Ananthapuramu district is 536 mm. The district experienced rainfall deficits in 19 of the last 120 years compared to the LPA of 536 mm (IWRIS, 2021).
The sparse rainfall in the Ananthapuramu district is also exacerbated by inadequate water flow in the Pennar river due to the paucity of rainfall in the Upper Pennar basin (GoAP, 1994a, 2019; IMD, 2019; IWRIS, 2021). The Tungabhadra high-level canal (TBHLC) system, on the other hand, is unable to provide the planned volume of water to the Ananthapuramu district due to the siltation and breaches upstream of the TBHLC resulting in reductions in the release of water from the Tungabhadra reservoir (GoAP, 2020). Consequently, only 7.31% of the total area (19,139 km2) of the Ananthapuramu district is irrigated while the sown area is 56.60% of the total area (GoAP, 2021b). As a result, the per capita income of this district is only 65% of that of the state of Andhra Pradesh (GoAP, 2022). As of 2019–2020, GoAP (2022) had declared 57 villages (out of a total of 534 with a total population of 167,421 persons as ‘drinking water problematic villages,’ while a perusal of the JJM dashboard indicates that only 76% of the rural households in Ananthapuramu district have a tap connection at present (JJM, 2022). However, GOI is implementing the Jal Jeevan Mission (JJM) to provide functional household tap connections to supply water @55 L per capita per day (lpcd) to every rural family by 2024. This will require a significant increase in surface water supplies in the coming years since the groundwater levels are already stressed in the Ananthapuramu district (CGWB, 2013).
The feasibility report prepared by NWDA (2005) for the A-P ILR project envisages the diversion of 1980 Mm3 of water from the Almatti dam on the river Krishna through a 587-km long canal in exchange for the excess Godavari water transferred to the Krishna basin after the completion of the ongoing Polavaram project. The Polavaram project to transfer 2265 Mm3 (80 TMC) of water from the Godavari River to the Krishna River is currently under construction and is expected to be completed in 2–3 years. On August 4, 1978, the states of A.P and Karnataka agreed that this surplus water diverted from the Godavari basin to the Krishna basin through the Polavaram project will be shared in the proportion of Maharashtra-396 Mm3: Karnataka-595 Mm3: A.P-1274 Mm3. This agreement has also been recognized by the Godavari Waters Dispute Tribunal (GWDT, 1980). Based on this agreement, NWDA (2005) has designed the A-P ILR Project to supply 372 Mm3 of water to the state of Karnataka (primarily, the drought-affected Ballari and Raichur districts) and 1342 Mm3 of water to the Ananthapuramu district (NWDA, 2005). This is in addition to the provision of 56 Mm3 of water for domestic and industrial uses besides making an allowance of 210 Mm3 of water for transmission losses in both States.
The A-P ILR Project scheme appears to be the solution to the water stress in the drought-affected Ballari and Raichur districts in Karnataka and the Ananthapuramu district in A.P. since it will supply 372 Mm3 of water to the state of Karnataka and 1342 Mm3 of water to the A.P. after accounting for transmission losses (NWDA, 2005). NWDA (2005) has proposed a balancing reservoir with a gross storage capacity of 83 Mm3 at Kalvapalli (@ RD 386 km) on the river Pennar (NWDA, 2005). However, the A-P link canal proposed by the NWDA (2005) may not be feasible between the Kalvapalli balancing reservoir in Ananthapuramu district (at 386 km) and the tail end of the canal (at 587 km) since GoAP has already constructed a canal from Jeedipalli to Marala (and beyond) in Phase-2 of the HNSS scheme (GoAP, 2021a). Various geospatial and ground truth points have been superimposed onto a GIS map in this research to understand the overlap between HNSS phase 2 alignment and NWDA-proposed A-P ILR alignment as shown in Fig. 1. Subsequently, a field survey was undertaken between RD 386 km and RD 587 km of the proposed A-P ILR link canal alignments along with NWDA officials to verify the overlap between the existing HNSS Phase-2 canal and the proposed NWDA alignment. This ground-truthing exercise validated the findings of the remote sensing and GIS studies.
Further, the construction of the Kalvapalli reservoir (Figure A1 in the Supplementary Information) proposed by NWDA (2005) will result in the submergence of 1323 Ha of land containing 249 houses in two villages and will displace 1333 project-affected-persons (PAPs). Since the construction of the Kalvapalli reservoir proposed by NWDA (2005) is not possible under these circumstances, alternative configurations must be developed for the A-P ILR Project that will meet the criteria listed in “Introduction” Section of this paper. These two challenges—(1) the overlap between the existing HNSS Phase-2 and the proposed A-P ILR link canal downstream of RD 386, and (2) the people displacement associated with the Kalvapalli reservoir, provided the impetus for the use of geospatial techniques in conjunction with the MCDM method to optimize the configuration of the A-P ILR link canal in Ananthapuramu district based on the criteria mentioned in Section “Introduction” of this paper.
Data and methods
The secondary data used in this study have been extracted from NWDA's Feasibility report (FR), district statistical reports, detailed project reports (DPR) of the Jeedipalli and Penna Ahobilam Balancing Reservoir (PABR), Survey of India (SOI) toposheets, and maps/drawings of the A-P ILR and HNSS projects (GoAP, 2021a; NWDA, 2005; SOI, 2021). Further, geospatial datasets were collected from the National Remote Sensing Centre (NRSC), ISRO, and other relevant agencies. The sources and details of the secondary data used in this study are summarized in Table A1 in the Supplementary Information.
Geospatial modelling coupled with the MCDM method using appropriate hydrological inputs and ground data is an effective tool for the study of various ILR projects (Chigbu & Onukaogu, 2013; Chowdary et al., 2012; Sheffield et al., 2018; Vemu & Udayabhaskar, 2010). The MCDM method is useful to arrive at the optimal decision in various applications such as environment, water resources management, and engineering services since it uses several criteria to manage complex problems (Gebre et al., 2021; Kulimushi et al., 2021; Mardani et al., 2015; Muluneh et al., 2022).
An MCDM-based site suitability model was constructed during this study to optimize the alignment of the segment of the proposed A-P ILR link canal falling within the Ananthapuramu district. While various methods based on MCDM are utilized to address complex problems, the fuzzy AHP method is the most efficient of all fuzzy techniques because it compares all criteria (pairwise) and alternatives and evaluates their weights (Mardani et al., 2015; Triantaphyllou & Mann, 1995). During the structuring of the criteria in AHP, we can understand the challenges and goals of the decision-makers as well as the available alternatives. The overall methodology can be broken down into sequential steps as shown in Figs. 2, 3.
Preparation of Thematic Layers
Several thematic layers (geomorphology, land use and landcover (LULC), slope, and soil) were generated using satellite and ground survey data. Other layers like the catchment area, drainage density, streams, flow accumulation, and flow direction, were created using the Shuttle Radar Topography Mission-Digital Elevation Model (SRTM-DEM) which was pre-processed before performing the analysis (SRTM, 2021). These thematic layers generated were calibrated and validated with data extracted from SOI toposheets and the offices of NWDA and the GoAP irrigation department. Geomorphological layers, LULC, and settlement layers were generated from LISS III and LISS-IV satellite data and validated with data extracted from SOI toposheets, Bhuvan thematic services, and field visits. The soil map of the study area was prepared from data obtained from the National Bureau of Soil Survey and Land Use Planning (NBSS-LUP). After preparing all the thematic layers, multi-scale integration using a standard majority rule-based aggregation technique was applied to optimize the resolution of each thematic layer. The AHP method was used to establish relative weights to create a land suitability map for the canal alignment as discussed in “Analytical Hierarchy Process” Section of this paper.
Analytical Hierarchy Process
The MCDM method refers to decision-making under multiple, usually conflicting criteria. The MCDM method can be categorized into two categories: multiple attribute decision-making (MADM) and multiple objective decision-making (MODM). The development of a land suitability map using a GIS-based model incorporates the MCDM method and utilizes a hierarchical structure including, land suitability classification, weight evaluation, and the development of a land suitability map (Muralitharan & Palanivel, 2015). The analytical hierarchy process (AHP) developed by Saaty (1977) is one of the most widely used MADM analytical techniques for complex decision-making issues since it can deal with both objective and subjective attributes (or criteria) of decision makers (Rao, 2007). Additionally, it provides a way to measure the consistency of preferences (Triantaphyllou, 2000). The AHP algorithm is used to determine the relative weights of available alternatives using a pairwise decision matrix. In this study, slope, LULC, geomorphology, and soil were considered the main governing factors, and suitable weights were assigned to each factor. The pairwise decision matrix was standardized to derive the relative weights for each factor using the AHP method shown in Fig. 3.
The Saaty scale used in this study has values ranging from 1 to 9 where the values 3, 5, 7, and 9 correspond to the judgements ‘moderate importance’, ‘strong importance’, ‘very strong importance’, and ‘absolute importance’. The scale used for pair-wise comparison is given in Table 1.
Identification of Site Suitability Factors for the Proposed A-P ILR Project
Physical land characteristics such as slope, land use, geomorphology, and soil are the key relevant factors considered in this study. Topographic factors such as elevation and slope of the study region were analyzed to select the optimal canal alignment route. The site suitability factors (shown in Fig. 4) and their importance in developing a site suitability map are discussed below.
Slope
Slope is defined as the highest rate of change in value from one cell to its neighbors along a fall line (Cadell, 2002). The slope of a gravity canal is one of its major features since it also determines the canal's maximum discharge. The slope map is generated using the SRTM-DEM. The slope varies from 1 to 9 degrees in the study area. Since the proposed A-P ILR link canal is gravity-based, the slope of the natural ground should neither be too gentle nor too steep. Therefore, on a scale of 1–9, ranks were allocated to different slope classes. A moderate slope range ranging from 3 to 5 degrees was assigned a higher weightage during this study.
Land use-Land cover changes (LULC)
These are critical indicators for sustainable water resource planning and management (Daba & You, 2022). The LULC classifications for the study area were prepared using LISS-IV images using supervised classification. The land classes for the study area were categorized into five classes: fallow land, water bodies, vegetation/crop area, built-up areas (settlement), and barren land. While ILR projects have several advantages, critics have emphasized social impacts such as displacement, rehabilitation, relocation, and environmental problems which have also contributed to peoples’ opposition to ILR projects in recent years (Purvis & Dinar, 2020; Sinha et al., 2020; Vaktania, 2022). Therefore, one of the key criteria used to develop the optimal alignment of the A-P ILR link canal in the Ananthapuramu district in this study was to minimize the number of people displaced by avoiding the use of built-up area as much as possible. Specifically, the built-up-area that will be affected by the submergence created by the Kalvapalli reservoir proposed by NWDA (2005) was given the lowest weightage, while fallow land and crop field areas were given the maximum weightage in the AHP-based MCDM method used in the present study.
Geomorphology
Geomorphological studies are recommended during the planning stage of all irrigation projects (FAO, 1992; MoWR, 2010). Various geomorphological features in the study area were digitized using satellite imagery and the Bhuvan geoportal and categorized into four classes, viz., the pediplain complex, anthropogenic origin, low dissected hills, and water bodies. The pediment-pediplain complex, which has a denudational origin and consists of gently sloping plains covered with weathered material is highly suitable for the construction of a canal (Bhuvan, 2022; Lakshmi et al., 2014 MoWR, 2010). Therefore, the highest weight among the geomorphological features in the study area was assigned to the pediplain followed by waterbodies.
Soil
Canals built in sandy soil will experience more seepage losses than canals constructed in clay soil because water seeps quickly through sandy soil and slowly through clay soil. Based on the soil map of the study area prepared using the NBSS and LUP data, the study area contains clay, loam, and silt soil. The slope ratio for loamy-type soil is adopted to minimize cutting and filling (MoWR, 2010). The highest weightage was given to clay soil during this study followed by silt and loam.
Implementation of the AHP-Based MCDM Method
In the present study, the AHP-based MCDM technique is applied after the preparation of all the thematic layers mentioned in “Identification of Site Suitability Factors for the Proposed A-P ILR” Project” Section The details of the calculations are shown in the supplementary information (Tables A2 to A5). The following steps were used to calculate the final weight of all the thematic layers (Muralitharan & Palanivel, 2015; Sutadian et al., 2017). Based on Saaty's scale (Table 1), a relative importance pairwise comparative matrix (A1 matrix) was generated as shown in Table A2. The steps in this process are summarized as follows:
Step 1 Add the values in each cell of each column of the pairwise matrix (A1 matrix) using Eq. (1).
Step 2 To construct a normalized pair-wise matrix (A2 matrix) as shown in Table A3, divide each element in the matrix by its column total, e.g., 1/1.86, 3/4.8, 3/6.3 as given in Eq. 2.
where Xij is the value in the ith row and jth column of the normalized pair-wise matrix.
Step 3 Use Eq. (3)to generate the standard weights by dividing the sum of the normalized rows of the matrix by the number of factors utilized (N = 4) as shown in Table A3.
where Wi is the standard weight.
Step 4 Construct [A3] and [A4] matrices such that,
The results obtained from A3 and A4 matrices are shown in Table A4.
Step 5 Consistency analysis.
The AHP method requires consistent weights derived from a pairwise comparison matrix. One of the essential features of the AHP is that it specifies and calculates the inconsistencies of decision-makers. The consistency vector (λ) is calculated by using Eq. 4. This procedure involves the multiplication of the pairwise comparison matrix values and the normalized weights of thematic layers utilizing the entries in Tables A2 and A3. The results are given in Table A4. To determine the Consistency Index (CI) in the present study, the value of λmax, which is the average of the matrix A4 is calculated as shown in Table A4. The CI which represents the consistency of a comparison matrix is the calculated using Eq. 5 as follows:
The Consistency Ratio (CR) is used to evaluate the matrix's consistency and ensure that the given weights are reliable. The Consistency Ratio (CR), computed by Eq. (6), approximates the efficiency criterion of the AHP.
where, RI = Random Inconsistency corresponding to the number of factors in the study (Table A5).
Stakeholder Consultations
In the present study, the MCDM-based AHP was first used to evaluate several possible routes to optimize the last-mile connectivity of the A-P ILR canal (from RD 377 km onwards) with the terminal balancing reservoirs located in the study area instead of NWDA’s proposal for constructing a new Kalvapalli reservoir. These alternatives were then plotted on GIS maps and discussed with relevant experts in NWDA and expert stakeholders in the GoAP listed in Table A6 included in the Supplementary Information.
Consultation with expert stakeholders is a crucial part of this study since large water projects require the participation and input of experienced stakeholders to develop a systematic plan (Gupta & van der Zaag, 2008; Srinivas & Singh, 2018). Such stakeholder consultations will help in the evaluation of various project configurations at the feasibility stage itself thereby resulting in time and cost savings. This is in addition to the formal public consultation process mandated by Environmental Impact Assessment (EIA) process to be undertaken for all river valley projects under the EIA Notification, 2006 (MoEF, 2006). As shown in Table A6 in the Supplementary Information, the expert stakeholders consulted during this study included the relevant NWDA officials, government experts in the irrigation and water resources departments of the AP and Karnataka State Governments, as well as the authorities responsible for the major dams/reservoirs in the command area of the proposed A-P ILR Project. These experts have not only provided valuable inputs for the study but have also provided critical comments and suggestions regarding the alternative project configurations for the A-P ILR Project evaluated during this study. Their key suggestions are as follows:
-
Since the capacity of the canals constructed under the HNSS Phase-2 is being enhanced under an existing project, there is no need to extend the A-P ILR Project beyond the Pennar river. The linkage of the proposed A-P ILR project to the HNSS Phase 2 scheme will enable the original command area proposed to be served by the A-P ILR Project without constructing a 200 km long canal.
-
The construction of the Kalvapalli reservoir as proposed by NWDA (2005) requires the displacement of hundreds of PAPs which will have an adverse impact on the project schedule and cost besides provoking opposition to the A-P ILR Project.
-
The current capacity of the PABR (147 Mm3) is higher than that of the Kalvapalli balancing reservoir (83 Mm3) proposed in the NWDA (2005) scheme. By connecting the A-P ILR Project to the PABR as well as the existing Jeedipalli reservoir (48 Mm3), the construction of the Kalvapalli reservoir can be avoided.
-
The proposed A-P ILR project must be connected to both PABR and Jeedipalli reservoirs so that the balancing of both ayacuts can be achieved in a reliable manner to provide water for domestic use as well as irrigation.
-
The PABR designed to receive water from the Pennar and Tungabhadra rivers is also receiving water from the river Krishna through the adjacent Jeedipalli reservoir during the construction of the HNSS Phase 2 canals. The PABR is supplying drinking water to Ananthapuramu City and rural areas and the quality of the water drawn from the PABR was checked with reference to Indian Standard 10,500–2012. The data collected till date indicates that all the physiochemical parameters of the raw water from the PABR reservoir are within the acceptable limits. Therefore, the water supplied from the Krishna River to the PABR after the construction of the A-P ILR Project as proposed in this study will have no adverse impact on the water quality in PABR.
Results and Discussion
Consistency Analysis
As shown in the Supplementary Information, the Consistency index (Eq. 5) of this study is 0.033 while the Consistency ratio (Eq. 6) is 0.034. Since the value of the Consistency Ratio is less than 0.10, the weights assigned to the factors used in the present study are consistent (Rao, 2007). This proves that the AHP-based MCDM method used in this study yields valid results.
The weights and ranks assigned to Slope, LULC, Geomorphology and Soil are indicated in Table 2. Not all chosen factors or criteria are equally important for a land suitability map. We must weigh each criterion's importance in relation to the others. Since the proposed A-P ILR project envisages only a gravity canal, the slope is considered to be a crucial factor for canal alignment with the highest weight, followed by land use (to minimize people displacement) which prevails over geomorphology and soil characteristics of the study area. The AHP-based MCDM method used in the present study enables us to give due importance to social (people displacement) and environmental (forest) factors besides the technical aspects (slope and soil characteristics) of ILR project design.
Land Suitability Map Using Weighted Overlay Analysis
The weighted overlay method is the most frequently used method to integrate different thematic layers on the same evaluation scale to develop the final suitability map. In the present study, weighted overlay analysis was performed on the spatial layers to delineate the potential locations for the AP-ILR link canal (from RD 377 km onwards) in the Ananthapuramu district. A suitability value was derived by multiplying the suitability value of each raster cell by the weight of its layer and totaling the resulting values. Overlay analysis tools were used to compute the final land suitability map shown in Fig. 5 by using Eq. 7:
where m and n are the total number of factors and the number of the subclass, Wj is the normalized weight of the jth factor, and Xi is the normalized rank of the factor subclasses.
A land suitability map was created for this study by superimposing the essential contributing thematic layers using weighted overlay analysis (ESRI, 2022). The screenshots demonstrating the steps used to process the data in the GIS software are included in the Supplementary information. The final land suitability map (Fig. 5) contains the essential thematic layers required for the gravity-based canal alignment of the A-P ILR link canal. The higher the class, the greater the potential of the site for a canal and vice versa. As shown in Fig. 5, it is possible to develop alternatives to connect the proposed A-P ILR link canal to the existing Jeedipalli reservoir and the Pennar river (which flows into the PABR) by avoiding the ‘very low’ and ‘low’ priority areas. Therefore, different A-P ILR link configurations were digitized and analyzed and superimposed on this land suitability map.
Alternatives Considered for the A-P ILR Link Canal Alignment
The four alternatives for the configuration of the A-P ILR link canal evaluated in the present study are shown in Fig. 6a, b, and Figures A2 to A4 in the Supplementary information. These four alternatives are summarized as follows:
Alternative 1 (Figure A2)
This is the base case in which NWDA (2005)’s proposed alignment is maintained right up to the Kalvapalli reservoir (on the river Pennar) after which the water flows to the PABR since the portion of the A-P ILR canal beyond the Kalvapalli reservoir as proposed by NWDA cannot be constructed due to the overlap with the existing HNSS Phase-2 canal (Fig. 1). This alternative requires the construction of the Kalvapalli reservoir as proposed by NWDA (2005) which will submerge an area of 1323 hectares necessitating the displacement of 1333 PAPs as explained in Section “Study Area”.
Alternative 2 (Figure A3)
This alternative has a length of 6 km between the proposed A-P ILR link canal at RD 377 km and the Jeedipalli Reservoir. This alignment will connect the A-P ILR Project with the existing Jeedipalli balancing reservoir and serve the HNSS Phase 2 command area. However, this alignment cannot cater to the ayacut of the PABR scheme which is currently non-operational due to the shortfall in water supply from the TBHLC scheme as explained in "Study Area" Section
Alternative 3 (Figure A4)
This alternative has a length of 6 km between the proposed A-P ILR link canal at RD 377.8 km and a natural stream flowing into the Pennar river upstream of the PABR. While this alternative can cater to the domestic and irrigation water requirements from the PABR dam, the original command area proposed under the A-P ILR link will have to be served by the HNSS scheme only. This will perpetuate the dependence of the HNSS scheme on the pumping of water from the Krishna (Srisailam reservoir) which is possible only when surplus water is available in the Srisailam reservoir.
Alternative 4 (Fig. 6a, b)
This alternative is the optimal alignment and has been finalized based on field studies related to water supply, demand, and shortfalls in the TBHLC and HNSS command areas, duly validated with expert stakeholder consultations as explained in "Stakeholder Consultations" section. The optimum alignment developed during this study meets all key assessment criteria for ILR Projects (Gupta & van der Zaag, 2008; Sinha et al., 2020). The key advantages of the optimal alignment are explained in Sect. "Optimal Alignment of the A-P ILR Link Canal"
Optimal Alignment of the A-P ILR Link Canal
The optimal alternative for the A-P ILR link alignment developed during this study takes off from the proposed A-P ILR link canal at RD 377 km and has two branches to connect with the existing balancing reservoirs in Jeedipalli (6 km link) and PABR (4 km branch from the main link), thereby avoiding the construction of the Kalvapalli reservoir as proposed by NWDA (2005). This optimal alignment minimizes people displacement and the potential environmental impacts of the proposed A-P ILR project and satisfies the irrigation, drinking and other water needs in the command area of two existing balancing reservoirs.
Currently, the PABR and its canal systems are not able to irrigate 20,234 hectares of ayacut in six mandals in the Ananthapuramu district due to a shortfall in inflows from the TBHLC and the Pennar river (GoAP, 2020). While the maximum storage in the PABR to date is only 147 Mm3, this storage capacity can be increased to the design capacity of 314 Mm3 once the Government of A.P completes the strengthening of the reservoir and acquires the balance land for which actions are being taken (GoAP, 2017).
NWDA (2005) had estimated the total budget for implementing the R & R plan for the A-P ILR Project to be Rs.51 million. This cost will be much higher today due to the increase in land compensation and R & R costs post the enactment of the Land Acquisition and R & R (LARR) Act of 2013 (MLJ, 2013). For example, GoAP (2020) has estimated the cost of land acquisition for the construction of the flood flow canal to be Rs. 1.2 million per hectare compared to NWDA (2005)’s estimate of Rs.0.143 Million per hectare to acquire land needed to construct the Kalvapalli reservoir (excluding R & R costs). Therefore, the optimal configuration of the A-P ILR Project developed in this study reduces the time and cost of land acquisition besides minimizing the displacement of project-affected persons. This is critical to enhance the acceptability of the A-P ILR project among the local communities.
By adopting the optimal configuration of the A-P ILR Project developed in this study, NWDA can realize both time and cost savings by avoiding the Kalvapalli reservoir and reducing the A-P ILR canal length by 200 km. The Government of Andhra Pradesh can use water from the A-P ILR Project to balance the ayacuts of PABR as well as HNSS Phase-2 by connecting the A-P ILR link canal to the PABR reservoir and Jeedipalli reservoir. The HNSS Phase-2 schemes and PABR can then be optimally utilized to irrigate 163,700 hectares and 20,230 hectares in the command areas of the HNSS Phase-2 scheme and the PABR right canal, respectively. In addition, the A-P ILR project will enhance the crop yields of the farmers tilling 82,000 hectares of land in the command area of this project in the state of Karnataka through enroute irrigation. Further, the existing drinking water schemes to supply drinking water to Ananthapuramu town and neighboring villages from the PABR will also be able to draw on a dependable water source once the A-P ILR project is executed as per the optimal configuration proposed in this study. Finally, the connection of the A-P ILR link canal to the Jeedipalli balancing reservoir also ensures the supply of water to the HNSS Phase-2 command area through gravity instead of pumping as per the HNSS design (GoAP, 2021a). This will reduce the electrical energy required to pump water from the Jeedipalli reservoir by approximately 60 GWh per year thereby reducing the carbon footprint and costs of HNSS Phase-2.
Summary and Conclusions
Sustainable development must balance social, economic, and environmental considerations. In addition to hydrological considerations, the social, political, and ecological circumstances of ILR projects must be carefully considered right from their planning stage to mitigate the environmental and social impacts of the project in a holistic manner. In this paper, the authors describe the use of geospatial techniques and the AHP-based MCDM method to carry out an integrated assessment of a major ILR project in India coupled with the use of expert stakeholder consultations to validate the optimal configuration of the project. Specifically, the optimal configuration of the A-P ILR Project proposed in this study avoids the construction of the Kalvapalli balancing reservoir by connecting the link canal to the Jeedipalli reservoir and the currently under-utilized PABR. This configuration also reduces the A-P ILR canal length by 200 km by using the existing canal systems constructed in the PABR and HNSS Phase-2 schemes. The decrease in the construction activities by implementing the A-P ILR Project as per the optimal configuration proposed in this study will reduce the construction costs of the Project as well as the costs of land acquisition and resettlement & rehabilitation of project-affected persons. This study will therefore enable the NWDA to win the support of the central and state governments for the A-P ILR Project.
The combination of geospatial techniques and the AHP-based MCDM method to carry out a transparent, integrated, and holistic assessment of ILR projects based on sound science, duly validated with expert stakeholder consultations can be used to optimize the configuration of other ILR projects to achieve SDG target 6.1 (achieve universal and equitable access to safe and affordable drinking water for all by 2030) as well as SDG 2 (‘zero hunger’) by 2030.
Data availability
Annexure uploaded along with manuscript.
References
Alcamo, J., Thompson, J., Alexander, A., Antoniades, A., Delabre, I., Dolley, J., Marshall, F., Menton, M., Middleton, J., & Scharlemann, J.P. (2020). Analysing interactions among the sustainable development goals: findings and emerging issues from local and global studies. Sustainability Science, 15, 1561–1572. https://doi.org/10.1007/s11625-020-00875-x
Amarasinghe, U. A., & Sharma, B. R. (2008). Strategic analyses of the national river linking project of India, Series 2. 500 p. http://www.indiaenvironmentportal.org.in/files/NRLP_Proceedin-2.pdf
Anantha, K.H., Garg, K.K., Moses, D.S., Patil, M.D., Sawargaonkar, G.L., Kamdi, P.J., Malve, S., Sudi, R., Raju, K.V., & Wani, S.P. (2021). Impact of natural resource management interventions on water resources and environmental services in different agroecological regions of India. Groundwater for Sustainable Development, 13, 100574. https://doi.org/10.1016/j.gsd.2021.100574
Best, J. (2019). Anthropogenic stresses on the world’s big rivers. Nature Geoscience, 12(1), 7–21. https://doi.org/10.1038/s41561-018-0262-x
Bhuvan (2022), Indian Geo-Platform of ISRO. https://bhuvan-app1.nrsc.gov.in/thematic/thematic/index.php
Brown, A., & Matlock, M. D. (2011). A review of water scarcity indices and methodologies. White paper, 106(1), 19.
Cadell, W. (2002). Report on the generation and analysis of DEMs for spatial modeling. https://macaulay.webarchive.hutton.ac.uk/LADSS/documents/DEMs-for-spatial-modelling.pdf
CGWB (Central Ground Water Board) (2013). Ground Water Brochure Anantapur District, Andhra Pradesh (2013).
Chigbu, N., & Onukaogu, D. (2013). Role of geospatial technology in environmental sustainability in Nigeria. http://www.fig.net/resources/proceedings/fig_proceedings/fig2013/papers/ts01d/TS01D_chigbu_6555.pdf
Chowdary, V. M., Desai, V. R., Gupta, M., Jeyaram, A., & Murthy, Y.V.N.K. (2012). Runoff simulation using distributed hydrological modeling approach, remote sensing, and GIS techniques: A case study from an Indian agricultural watershed. International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, 39, B8.
Daba, M. H., & You, S. (2022). Quantitatively assessing the future land-use/land-cover changes and their driving factors in the upper stream of the Awash River based on the CA–Markov model and their implications for water resources management. Sustainability., 14(3), 1538. https://doi.org/10.3390/su14031538
Das, D. K. (2006). Environmental impact of inter-basin water transfer projects: some evidence from Canada. Economic and Political Weekly, 41, 1703–1707.
Davies, B. R., Thoms, M., & Meador, M. (1992). An assessment of the ecological impacts of inter-basin water transfers, and their threats to river basin integrity and conservation. Aquatic Conservation: Marine and Freshwater Ecosystems. https://doi.org/10.1002/aqc.3270020404
ESRI (Environmental Systems Research Institute) (2021). https://www.arcgis.com/home/item.html?id=d6642f8a4f6d4685a24ae2dc0c73d4ac
ESRI (2022). Understanding overlay analysis. https://pro.arcgis.com/en/pro-app/latest/tool-reference/spatial-analyst/understanding-overlay-analysis.htm
FAO (Food and Agriculture Organization) (1992). Irrigation Water Management Training manual no. 7 on Canal. https://www.fao.org/3/bl888e/bl888e.pdf
Gebre, S. L., Cattrysse, D., & Orshoven, J. V. (2021). Multi-criteria decision-making methods to address water allocation problems: A systematic review. Water. https://doi.org/10.3390/w13020125
Glass, Lisa-Maria., & Newig, Jens. (2019). Governance for achieving the sustainable development goals: How important are participation, policy coherence, reflexivity, adaptation, and democratic institutions? Earth System Governance. https://doi.org/10.1016/j.esg.2019.100031
GoAP (1994b). Handri-Niva Canal Project Report. Irrigation and C.A.D. Department. Hyderabad.
GoAP (Government of Andhra Pradesh) (1994a). Detailed Project Report on the Dr. K.S. PABR. Irrigation and C.A.D. Department. Hyderabad.
GoAP (2017). Tungabhadra Project High-Level Canal Stage (TBPHLC). Geophysical Investigation of the Penna Ahobilam Balancing Reservoir (PABR). Water Resources Department. Andhra Pradesh.
GoAP (2019). District Handbook of Statistics. Chief Planning Officer, Ananthapuramu district. Andhra Pradesh.
GoAP (2020). Pre-Feasibility Report on the Tungabhadra Dam Flood Flow Canal. Office of the Superintending Engineer. TBPHLC Circle, Ananthapuramu, Andhra Pradesh.
GoAP (2021b). Irrigation Profile of Ananthapuramu District. https://irrigationap.cgg.gov.in/wrd/getDistricts
GoAP (2021a). Handri Niva Sujala Sravanthi (HNSS) Phase-II. https://irrigationap.cgg.gov.in/wrd/static/approjects/hnss_1.html
GoAP (2022). Handbook of Statistics - Ananthapuramu District. https://cdn.s3waas.gov.in/s333e8075e9970de0cfea955afd4644bb2/uploads/2022/04/2022040612.pdf
Gupta, J., & van der Zaag, P. (2008). Interbasin water transfers and integrated water resources management: Where engineering, science, and politics interlock. Physics and Chemistry of the Earth, Parts A/B/C, 33(1–2), 28–40. https://doi.org/10.1016/j.pce.2007.04.003
GWDT (Godavari Water Disputes Tribunal) (1980). The Godavari Water Disputes Tribunal Award. http://www.cwc.gov.in/sites/default/files/GWDTAward%20Further%20Report.pdf
Howe, C. W., & Easter, K. W. (2013). Interbasin transfers of water: Economic issues and impacts. RFF Press. https://doi.org/10.4324/9781315064659
IMD (2019). Composite Agrometeorological Advisory Service Bulletin for the State of Andhra Pradesh. https://agromet.ap.nic.in/
IWRIS (India Water Resources Information System) (2021). https://indiawris.gov.in/wris/
JJM (Jal Jeevan Mission) (2022). Tap water supply in rural households in Ananthapuramu district. https://ejalshakti.gov.in/jjmreport/JJMVillage.aspx
Khanna, R. K., Agrawal, C. K., & Kumar, P. (2007). Remote Sensing and GIS Applications in Flood Management. Central Water Commission.
Kroll, C., Warchold, A., & Pradhan, P. (2019). Sustainable development goals (SDGs): Are we successful in turning trade-offs into synergies? Palgrave Communications. https://doi.org/10.1057/s41599-019-0335-5
Kulimushi, L. C., Bashagaluke, J. B., Choudhari, P., Masroor, M., & Sajjad, H. (2021). Novel combination of analytical hierarchy process and weighted sum analysis for watersheds prioritization. A study of Ulindi catchment, Congo River Basin. Geocarto International. https://doi.org/10.1007/s12517-014-1464-1
Kumar, D. N., & Reshmidevi, T. V. (2013). Remote sensing applications in water resources. Journal of the Indian Institute of Science, 93(2), 163.
Lakshmi, A. S., Saran, S., Srivastav, S. K., & Murthy, Y. K. (2014). Geospatial modelling approach for interlinking of rivers: A case study of Vamsadhara and Nagavali river systems in Srikakulam. Andhra Pradesh. The International Archives of Photogrammetry, Remote Sensing and Spatial Information Sciences, https://doi.org/10.5194/isprsarchives-XL-8-127-2014
Mardani, A., Jusoh, A., Nor, K., Khalifah, Z., Zakwan, N., & Valipour, A. (2015). Multiple criteria decision-making techniques and their applications–a review of the literature from 2000 to 2014. Economic research-Ekonomska istraživanja., 28(1), 516–571. https://doi.org/10.1080/1331677X.2015.1075139
McCully, P. (1996). Silenced rivers: The ecology and politics of large dams. Zed Books.
MLJ (Ministry of Law and Justice) (2013). The right to fair compensation and transparency in land acquisition, rehabilitation and resettlement act. https://legislative.gov.in/sites/default/files/A2013-30.pdf
MoEF (Ministry of Environment and Forests) (2006). EIA Notification dated 14 September 2006. https://moef.gov.in/wp-content/uploads/2018/03/so1533.pdf
MoF (Ministry of Finance) (2021). Climate, climate change, and agriculture. Chapter VI of economic survey 2017–18. Vol. 1.
MoWR (Ministry of Water Resources) (2010). Guidelines For preparation of detailed project report of irrigation & multipurpose projects. http://cwc.gov.in/sites/default/files/dpr_guidelines.pdf
Muluneh, A., Tadesse, T., & Girma, R. (2022). Assessing potential land suitable for surface irrigation using GIS and AHP techniques in the Rift Valley Lakes Basin. Ethiopia. Sustainable Water Resources Management., 8(2), 1–22. https://doi.org/10.1007/s40899-022-00632-1
Muralitharan, J., & Palanivel, K. (2015). Groundwater targeting using remote sensing, geographical information system, and analytical hierarchy process method in hard rock aquifer system, Karur district, Tamil Nadu India. Earth Science Informatics, 8(4), 827–842. https://doi.org/10.1007/s12145-015-0213-7
Newig, J., Voß, Jan-Peter., & Monstadt, J. (2007). Editorial: Governance for sustainable development in the face of ambivalence, uncertainty and distributed power: An introduction. Journal of Environmental Policy & Planning., 9(3–4), 185–192. https://doi.org/10.1080/15239080701622832
NWDA (National Water Development Agency). (2005). Feasibility report of Krishna Almatti-Pennar Link Project. http://nwda.gov.in/content/innerpage/krishnapennarlink.php
Oliveira, A., Calili, R., Almeida, M. F., & Sousa, M. (2019). A systemic and contextual framework to define a country’s 2030 agenda from a foresight perspective. Sustainability, 11(22), 6360. https://doi.org/10.3390/su11226360
Pradhan, P., Costa, L., Rybski, D., Lucht, W., & Kropp, J.P. (2017). A systematic study of sustainable development goal (SDG) interactions. Earth’s Future, 5(11), 1169–1179. https://doi.org/10.1002/2017EF000632
Purvis, L., & Dinar, A. (2020). Are intra-and inter-basin water transfers a sustainable policy intervention for addressing water scarcity? Water Security, 9, 100058. https://doi.org/10.1016/j.wasec.2019.100058
Rao, R. V. (2007). Introduction to multiple attribute decision-making (MADM) methods. Decision Making in the Manufacturing Environment: Using Graph Theory and Fuzzy Multiple Attribute Decision Making Methods, 27–41.
Reddy, M.S., Rout, S.K., & Reddy, E.B.U.B. (2008). Drought in Ananthapuramu District: An overview. https://www.academia.edu/33186153/Drought_in_Anantapur_An_Overview
Saaty, T. L. (1977). A scaling method for priorities in hierarchical structures. Journal of Mathematical Psychology, 15(3), 234–281. https://doi.org/10.1016/0022-2496(77)90033-5
Saaty, T. L. (2000). The analytic hierarchy process: Planning, priority setting, resource allocation (p. 287). McGraw-Hill International Book Co.
Sheffield, J., Wood, E. F., Pan, M., et al. (2018). Satellite remote sensing for water resources management: Potential for supporting sustainable development in data-poor regions. Water Resources Research, 54(12), 9724–9758. https://doi.org/10.1029/2017WR022437
Sinha, P., Rollason, E., Bracken, L. J., Wainwright, J., & Reaney, S. M. (2020). A new framework for an integrated, holistic, and transparent evaluation of inter-basin water transfer schemes. Science of The Total Environment, 721, 137646. https://doi.org/10.1016/j.scitotenv.2020.137646
SOI (Survey of India) (2021). https://www.surveyofindia.gov.in/
Srinivas, R., & Singh, A. P. (2018). Impact assessment of industrial wastewater discharge in a river basin using interval-valued fuzzy group decision-making and spatial approach. Environment, Development, and Sustainability, 20(5), 2373–2397.
SRTM (Shuttle Radar Topography Mission) (2021).1 Arc-Second Global. https://doi.org/10.5066/F7PR7TFT
Sutadian, A. D., Muttil, N., Yilmaz, A. G., & Perera, B. J. C. (2017). Using the analytic hierarchy process to identify parameter weights for developing a water quality index. Ecological Indicators, 75, 220–233. https://doi.org/10.1016/j.ecolind.2016.12.043
Triantaphyllou, E. (2000). Multi-criteria decision-making methods. In Multi-criteria decision-making methods: A comparative study (pp. 5–21). Springer, Boston.
Triantaphyllou, E., & Mann, S. H. (1995). Using the analytic hierarchy process for decision-making in engineering applications: Some challenges. International Journal of Industrial Engineering: Applications and Practice, 2(1), 35–44.
UN (United Nations) (2015). Resolution adopted by the General Assembly on 25 September 2015: Transforming our world: the 2030 Agenda for Sustainable Development. https://www.un.org/ga/search/view_doc.asp?symbol=A/RES/70/1&Lang=E
UNDP (UN Development Program) (2019). Human development and the SDGs. https://hdr.undp.org/content/human-development-and-sdgs
UNEP (UN Environment Program) (2021). Progress on Integrated Water Resources Management. https://wedocs.unep.org/bitstream/handle/20.500.11822/36690/PIWRS6.5.1.pdf
UNEP (2022). What is integrated water resources management? https://www.unep.org/explore-topics/disasters-conflicts/where-we-work/sudan/what-integrated-water-resourcesmanagement
Vaktania, S. (2022). Gujarat scraps Par-Tapi-Narmada river-link project ahead of assembly polls. https://www.indiatoday.in/india/gujarat/story/gujarat-govt-cancels-par-tapi-narmada-river link-project-assembly-polls-bhupendra-patel-tribals-bjp-congress-1952431–2022–05–21
Vemu, S., & Udayabhaskar, P. (2010). An integrated approach for prioritization of reservoir catchment using remote sensing and geographic information system techniques. Geocarto international, 25(2), 149–168. https://doi.org/10.1080/10106040903015798
Acknowledgements
The authors acknowledge the guidance provided by Dr. K J Ramesh and Sh. M D Radhakrishna during this research. We are also grateful to officials in the NWDA and the water resources and irrigation departments in Andhra Pradesh and Karnataka for their inputs and participating in stakeholder consultations during this study. The first author is also thankful to the ‘Manipal Academy of Higher Education (MAHE) for permitting him to carry out his PhD dissertation entitled “Interlinking of Rivers for Integrated Water Resources Management”.
Funding
The ongoing research work is part of a larger research project being implemented by NIAS under a Grant from the Ministry of Earth Sciences (MoES/ 16/15/2011-RDEAS (NIAS) dated May 22, 2018) on the theme “to understand the Interaction between components of Earth and Human Systems at various Spatial and Temporal Scales”. However, MOES has not played any role in the design or execution of this study.
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
The authors report no potential conflicts of interest.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Supplementary Information
Below is the link to the electronic supplementary material.
About this article
Cite this article
Ahmed, A., Srikanth, R. Application of Geospatial Techniques and the MCDM Method to Optimize Interlinking of Rivers in India. J Indian Soc Remote Sens 51, 849–863 (2023). https://doi.org/10.1007/s12524-023-01672-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12524-023-01672-6