The Stochastic Resource-Constrained Project Scheduling Problem

  • Chapter
  • First Online:
Handbook on Project Management and Scheduling Vol. 2

Abstract

Resource-constrained project scheduling has been widely investigated in the academic literature, but the issue of the incorporation of uncertainty in project scheduling has received a growing research attention only in the last 15 years. This chapter gives an overview of models and methods for the resource-constrained project scheduling under uncertainty. The case of known deterministic renewable resource requirements and random activity durations with a known probability distribution function is studied in detail. In particular, we show how, through the use of joint probabilistic constraints, a feasible baseline schedule with minimum makespan can be built, which is able to tolerate a certain degree of uncertainty and to absorb dynamic variations in activity durations. The use of joint probabilistic constraints, within the stochastic scheduling problem, represents an innovative element in the literature and enables the relaxation of the common assumption that only one activity at a time disturbs the starting time of a successor activity, rather limiting the joint probability of disruption of the preceding activities to a given probability level. The results obtained with the proposed heuristics are discussed and compared with two well known heuristics taken from the literature on a set of randomly generated project instances. A practical application concerning a real project for construction of students’ apartments at the University of Calabria, Italy, is also illustrated. Based on the analysis of the various researches discussed in this chapter, avenues for future research will be also outlined.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Alvarez-Valdes R, Tamarit JM (1989) Heuristic algorithms for resource constrained project scheduling. A review and an empirical analysis. In: SĹ‚owiĹ„ski R, WČ©glarz J (eds) Advances in project scheduling. Elsevier, Amsterdam, pp 113–134

    Google Scholar 

  • Ashtiani B, Leus R, Aryanezhad, MB (2011) New competitive results for the stochastic resource constrained project scheduling problem: exploring the benefits of preprocessing. J Sched 14:157–171

    Article  Google Scholar 

  • Atkinson R, Crawford L, Ward S (2006) Fundamental uncertainties in projects and the scope of project management. Int J Proj Manag 24:687–698

    Article  Google Scholar 

  • BallestĂ­n F (2007) When it is worthwhile to work with the stochastic RCPSP? J Sched 10:153–166

    Article  Google Scholar 

  • BallestĂ­n F, Leus R (2009) Resource-constrained project scheduling for timely project completion with stochastic activity durations. Prod Oper Manag 18:459–474

    Article  Google Scholar 

  • Bruni ME, Beraldi P, Guerriero F, Pinto E (2011a) A heuristic approach for resource constrained project scheduling with uncertain activity durations. Comput Oper Res 38:1305–1318

    Article  Google Scholar 

  • Bruni ME, Beraldi P, Guerriero F, Pinto E (2011b) A scheduling methodology for dealing with uncertainty in construction projects. Eng Comput 28(8):1064–1078

    Article  Google Scholar 

  • Davis E, Patterson J (1975) A comparison of heuristic and optimum solutions in resource constrained project scheduling. Manag Sci 21:944–955

    Article  Google Scholar 

  • Deblaere F, Demeulemeester E, Herroelen W, Van de Vonder S (2007) Robust resource allocation decisions in resource-constrained projects. Decis Sci 38:1–37

    Article  Google Scholar 

  • Dentcheva D, PrĂ©kopa A, RuszczyĹ„ski A (1998) On stochastic integer programming under probabilistic constraints. Research Report RRR29-98, RUTCOR Rutgers Center for Operations Research, Rutgers University, Newark

    Google Scholar 

  • Goldratt EM (1997) Critical chain. The North River Press, Great Barrington

    Google Scholar 

  • Golenko-Ginzburg D, Gonik A (1997) Stochastic network project scheduling with non-consumable limited resources. Int J Prod Econ 48:29–37

    Article  Google Scholar 

  • Golenko-Ginzburg D, Gonik A (1998) A heuristic for network project scheduling with random activity durations depending on the resource allocation. Int J Prod Econ 55:149–162

    Article  Google Scholar 

  • Graham RL (1966) Bounds on multiprocessing timing anomalies. Bell Syst Tech J 45:1563–1581

    Article  Google Scholar 

  • Igelmund G, Radermacher FJ (1983a) Algorithmic approaches to preselective strategies for stochastic scheduling problems. Networks 13:29–48

    Article  Google Scholar 

  • Igelmund G, Radermacher FJ (1983b) Preselective strategies for the optimization of stochastic project networks under resource constraints. Networks 13:1–28

    Article  Google Scholar 

  • Jaafari A (2001) Management of risks, uncertainties and opportunities on projects: time for a fundamental shift. Int J of Proj Manag 19(2):89–101

    Article  Google Scholar 

  • Jagannathan R (1974) Chance-constrained programming with joint constraints. Oper Res 22(2):358–372

    Article  Google Scholar 

  • Kim K, Garza MJ (2005) Evaluation of the resource-constrained critical path method algorithms. J Constr Eng Manag 131(5):522–532

    Article  Google Scholar 

  • Kolisch R, Hartmann S (1999) Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In: WČ©glarz J (ed) Project scheduling: recent models, algorithms and applications. Kluwer, Dordrecht, pp 147–178

    Chapter  Google Scholar 

  • Kolisch R, Sprecher A (1997) PSPLIB a project scheduling problem library. Eur J Oper Res 96:205–216

    Article  Google Scholar 

  • Lambrechts O, Demeulemeester E, Herroelen W (2007) A tabu search procedure for developing robust predictive project schedules. Int J Prod Econ 111(2):496–508

    Google Scholar 

  • Malcolm DG, Roseboom JH, Clark CE, Fazar W (1959) Application of a technique for research and development program evaluation. Oper Res 7(5):656–669

    Article  Google Scholar 

  • Mehta SV, Uzsoy RM (1998) Predictable scheduling of a job shop subject to break-downs. IEEE T Roboti Autom 14(3):365–378

    Article  Google Scholar 

  • Miller BL, Wagner HM (1965) Chance constrained programming with joint constraints. Oper Res 13(6):930–945

    Article  Google Scholar 

  • Möhring RH, Stork F (2000) Linear preselective strategies for stochastic project scheduling. Math Method Oper Res 52(3):501–515

    Article  Google Scholar 

  • Nkasu MM (1994) COMSARS: a computer-sequencing approach to multiresource-constrained scheduling – Part 1: deterministic networks. Int J Proj Manag 12(3):183–192

    Article  Google Scholar 

  • Perminova O, Gustafsson M, Wikstrom K (2008) Defining uncertainty in projects a new perspective. Int J Proj Manag 26:73–79

    Article  Google Scholar 

  • PrĂ©kopa, A (1995) Stochastic programming. Kluwer Academic, Boston

    Book  Google Scholar 

  • Rabbani M, Fatemi Ghomi SMT, Jolai F, Lahiji NS (2007) A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. Eur J Oper Res 176:794–808

    Article  Google Scholar 

  • Radermacher FJ (1981) Optimale Strategien fĂĽr stochastische Scheduling-Probleme. Habilitation thesis, RWTH Aachen, Aachen, Germany. In: Schriften zur Informatik und angewandten Mathematik 98, RWTH Aachen

    Google Scholar 

  • Stork F (2001) Stochastic resource-constrained project scheduling. Ph.D. dissertation, Technische Universität Berlin, Berlin

    Google Scholar 

  • Tsai YW, Gemmil DD (1998) Using tabu search to schedule activities of stochastic resource-constrained projects. Eur J Oper Res 111:129–141

    Article  Google Scholar 

  • Van De Vonder S, Demeulemeester E, Herroelen W, Leus R (2006) The trade-off between stability and makespan in resource-constrained project scheduling. Int J Prod Res 44(2):215–236

    Article  Google Scholar 

  • Van de Vonder S, Demeulemeester E, Herroelen W (2008) Proactive heuristic procedures for robust project scheduling: an experimental analysis. Eur J Oper Res 189:723–733

    Article  Google Scholar 

  • Zhu G, Bard JF, Yu G (2007) A two-stage stochastic programming approach for project planning with uncertain activity durations. J Sched 10:167–180

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Maria Elena Bruni .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Bruni, M.E., Beraldi, P., Guerriero, F. (2015). The Stochastic Resource-Constrained Project Scheduling Problem. In: Schwindt, C., Zimmermann, J. (eds) Handbook on Project Management and Scheduling Vol. 2. International Handbooks on Information Systems. Springer, Cham. https://doi.org/10.1007/978-3-319-05915-0_7

Download citation

Publish with us

Policies and ethics