Linear preselective policies for stochastic project scheduling

  • Published:
Mathematical Methods of Operations Research Aims and scope Submit manuscript

Abstract.

In the context of stochastic resource-constrained project scheduling we introduce a novel class of scheduling policies, the linear preselective policies. They combine the benefits of preselective policies and priority policies; two classes that are well known from both deterministic and stochastic scheduling. We study several properties of this new class of policies which indicate its usefulness for computational purposes. Based on a new representation of preselective policies as and/or precedence constraints we derive efficient algorithms for computing earliest job start times and state a necessary and sufficient dominance criterion for preselective policies.

 A computational experiment based on 480 instances empirically validates the theoretical findings.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Möhring, R., Stork, F. Linear preselective policies for stochastic project scheduling. Mathematical Methods of OR 52, 501–515 (2000). https://doi.org/10.1007/s001860000095

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s001860000095

Navigation