Approaches to an Assessment of Ecosystem Services in Hydroenergy A. B. AlibekovS. N. BobylevT. R. Khaziakhmetov HYDROTECHNICAL CONSTRUCTION 20 July 2017 Pages: 129 - 134
Calculation of Offshore Ice-Resistant Structures Under Action of Ice Loads in Light of Russian Structure Standards V. A. Polit’koI. G. Kantarzhi OriginalPaper 20 July 2017 Pages: 135 - 142
Studying the Crack Resistance of Some Parts of Hydropower Equipment V. R. MigurenkoB. E. Mel’nikovT. P. Raimberdiev OriginalPaper 20 July 2017 Pages: 143 - 150
Determining the Equivalent Sand Roughness of a Surface by Measuring the Hydraulic Resistance of an Annular Channel A. S. KorsunM. I. PisarevskiiM. I. Delov OriginalPaper 21 July 2017 Pages: 151 - 155
Assessment of the Maximum Water Flow Passed Through the Volga-Kama Cascade of Reservoirs with Allowance for the Nonhorizontality of Their Surface A. Yu. AleksandrovskiiA. S. BorshchE. N. Shilina OriginalPaper 20 July 2017 Pages: 156 - 161
Optimization of Quality Control of Gravel-Pebble Soil Placement During Dam Construction S. V. Bortkevich OriginalPaper 21 July 2017 Pages: 162 - 167
Field Observations of the Settlements and Displacements of the Nurek Dam L. N. RasskazovE. Kh. Yadgorov OriginalPaper 21 July 2017 Pages: 168 - 174
Assessing the Characteristics of a New Hydraulic Turbine for the Verkhnyaya Tuloma HPP I. P. IvanchenkoA. N. ProkopenkoV. L. Stankevich OriginalPaper 20 July 2017 Pages: 175 - 179
In situ Geomonitoring of the Rock Slopes of Tailraces N. N. AbramovE. V. Kabeev OriginalPaper 21 July 2017 Pages: 180 - 182
Characteristics of Flow in Scrolls of Hydraulic Turbines Calculated by the Equations of the Flow Induced by a Vortex Sink Cylinder of Finite Length Located on an Impermeable Cylinder of Infinite Length I. E. Mikhailov OriginalPaper 20 July 2017 Pages: 183 - 187
Investigation of the Technical Condition of Miter Gates and Their Lock Support Elements of the Northern Dvina System M. L. Kuz’mitskiiN. M. Ksenofontov OriginalPaper 21 July 2017 Pages: 188 - 193
Software and Hardware Systems in the Safety Control Systems of Nuclear Power Plants V. V. Zverkov THERMAL POWER PLANTS 20 July 2017 Pages: 194 - 202
Algorithms and Experience with Prediction of Technical Operating Failures in Nuclear Power Plant Equipment A. K. AdamenkovA. A. SalnykovS. I. Ryasnyi OriginalPaper 20 July 2017 Pages: 203 - 210
Torsional Oscillations in a Gas Turbine Unit and the Possibility of Collapse of an Isolated Power System E. S. TruninV. M. TarakanovD. S. Genvarev OriginalPaper 21 July 2017 Pages: 211 - 215
Experience with Burning of Grade D Coal from the Reserve of JSC “Shubarkol’ Komir” in Boilers of the 225-MW Units at the Cherepetskaya Thermal Power Plant D. V. SosinA. V. Shtegman OriginalPaper 20 July 2017 Pages: 216 - 219
Solution of Problems with the Burning of Coals from the Kansk-Achinsk Basin in the P-49 Boiler of a 500 MW Unit at the Nazarovo State Regional Electric Power Plant V. E. SkuditskiyR. G. AnoshinK. A. Grigoryev OriginalPaper 21 July 2017 Pages: 220 - 225
TCSR Features Facilitating Safe Testing of 500 kV Power Transmission Lines A. M. MatinyanM. V. PeshkovZ. E. Pugachenko POWER SYSTEMS AND ELECTRIC NETWORKS 21 July 2017 Pages: 226 - 229
Surface Area of the Conductors in OHL and Contact Networks V. I. Kharchevnikov OriginalPaper 20 July 2017 Pages: 230 - 233
Determination of the Time-to-Saturation of Current Transformers in Short-Circuit Transient Regimes S. L. KuzhekovA. A. DegtyarevV. V. Moskalenko OriginalPaper 21 July 2017 Pages: 234 - 239
Analysis of Application of Models to Assess Parameters of Ice Formation on Overhead Electric Power Lines D. E. TitovG. G. UgarovA. A. Ustinov OriginalPaper 21 July 2017 Pages: 240 - 246
Limitation of Transient Recovery Voltage When Using Shunt Reactors in 110 – 220 kV Networks D. R. LyubarskiiA. A. Rubtsov OriginalPaper 20 July 2017 Pages: 247 - 250
Improved Algorithm for Phase Comparison for Differential Protection of a Power Transformer I. I. LitvinovV. E. Glazyrin OriginalPaper 20 July 2017 Pages: 251 - 255
Erratum to: Electric-Spark alloying technology for improving the working life of steam turbine rotor blades and equipment for its implementation A. V. BelyakovV. V. SarantsevB. F. Reutov Erratum 24 July 2017 Pages: 256 - 256