Prediction of electric-power generation at hydroelectric power plants A. Yu. AleksandrovskiiP. S. Borshch Hydrotechnical Construction 16 July 2013 Pages: 83 - 88
Geologic-engineering and geomechanical models of the rock mass in the bed of the dam at the Sayano-Shushenskaya HPP A. I. SavichM. M. Il’inA. B. Basova OriginalPaper 16 July 2013 Pages: 89 - 101
Performance Optimization of Hydraulic Turbine by Use of Variable Rotating Speed Sh. I. AbubakirovM. E. LunatsiV. A. Shchur OriginalPaper 24 July 2013 Pages: 102 - 107
Hydromechanical dimensional analysis of scroll casings with moment-free shell-stator connection I. G. Belash OriginalPaper 16 July 2013 Pages: 108 - 113
Modeling zones of eddy currents in water-supply galleries of locks A. V. VasinO A. Timofeeva OriginalPaper 16 July 2013 Pages: 114 - 118
Prospects for increasing the efficiency of gas turbine and steam-gas units G. G. OlkhovskyV. P. Trushechkin Thermal Power Plants 16 July 2013 Pages: 119 - 124
Effect of the mineral part of coals on their slagging and contamination properties E. P. DikA. N. SobolevaA. V. Shtegman OriginalPaper 16 July 2013 Pages: 125 - 132
Using thermal test data to determine the minimum load of a 200-MW power unit with a PK-47 boiler at the Zainsk power station I. I. BelyakovV. I. BreusA. B. Barannikov OriginalPaper 16 July 2013 Pages: 133 - 138
Numerical simulation of the thermal conditions in a sea bay water area used for water supply to nuclear power plants A. S. Sokolov OriginalPaper 14 July 2013 Pages: 139 - 142
Short-term optimization of operating modes of power plants A. S. Taran Power Systems and Electric Networks 16 July 2013 Pages: 143 - 145
Failure of rotor protection due to unreliable contact of the relay brush and the shaft V. G. AlekseevA. I. LeviushI. Akhmadov OriginalPaper 14 July 2013 Pages: 146 - 148
The effect of network devices for controlling the modes of operation of electric power transmission on the dynamic stability of electric power plants and the damping of electromechanical oscillations A. P. Likhachev OriginalPaper 16 July 2013 Pages: 149 - 154
Mobile equipment for melting the ice crust on 110 – 220 KV overhead lines É. E. SonÉ. Kh. IsakaevP. A. Konovalov OriginalPaper 16 July 2013 Pages: 155 - 157