Using thermal test data to determine the minimum load of a 200-MW power unit with a PK-47 boiler at the Zainsk power station

  • Published:
Power Technology and Engineering Aims and scope

Calculations show that to prevent the oscillatory instability of the flow in a PK-47 once-through boiler, it is necessary to install /12 mm orifice plates at the inlet of its bottom radiant section. Load-reduction tests on the boiler with such plates of a 200-MW power unit at constant turbine inlet pressure confirm the reliable operation of the unit in a load range of 80 – 200 MW.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. V. A. Lokshin, D. F. Peterson, and A. L. Schwarz (eds.), Standard Methods of Hydraulic Design for Power Boilers, Hemisphere, New York (1988).

    Google Scholar 

  2. L. M. Yanchuk, L. M. Kofman, A. V. Khudyak, and Yu. G. Obikhod, “Reliability of a gas-fired once-through boiler at low loads,” Élektr. Stantsii, No. 7 (1975).

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Élektricheskie Stantsii, No. 1, January 2013, pp. 49 – 54.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Belyakov, I.I., Breus, V.I. & Barannikov, A.B. Using thermal test data to determine the minimum load of a 200-MW power unit with a PK-47 boiler at the Zainsk power station. Power Technol Eng 47, 133–138 (2013). https://doi.org/10.1007/s10749-013-0410-9

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-013-0410-9