Development of the design for the No. 2 spillway at the Boguchany hydroproject A. V. ToloshinovA. N. VolynchikovG. A. Sudol’skii Hydrotechnical Construction 21 August 2009 Pages: 135 - 142
Earthquake resistance of basic structures at the Boguchany HPP A. N. VolynchikovYu. B. MgalobelovV. V. Orekhov Hydrotechnical Construction 19 August 2009 Pages: 143 - 150
Principles of a new regulatory base of engineering surveys for hydrotechnical construction I. A. Parabuchev Hydrotechnical Construction 19 August 2009 Pages: 151 - 155
Probability and risk of terrorist acts against water-development works V. V. Kayakin Hydrotechnical Construction 19 August 2009 Pages: 156 - 159
Thermal analyses of ice in designing the series of Bureya HPP T. V. Chistyakova Hydrotechnical Construction 19 August 2009 Pages: 167 - 169
Adapting the monitoring and control systems on the 300 MW power generation units at the Iriklinskaya GRÉS to modern operational requirements V. A. BilenkoI. Z. ChernomzavV. S. Sadykov Thermal Power Stations 21 August 2009 Pages: 170 - 179
Common station system for voltage and reactive power regulation at the Mosénergo TÉTs-27 heating and electric power plant M. E. Krasnova Power Systems and Electric Networks 19 August 2009 Pages: 180 - 184
Experience in connecting the power generating units of thermal power plants to automatic secondary frequency regulation within the united power system of Russia A. V. ZhukovA. N. KomarovI. V. Barsukov OriginalPaper 19 August 2009 Pages: 185 - 193
Features of the relay protection of different types of controlled shunting reactors A. G. Dolgopolov Power Systems and Electric Networks 21 August 2009 Pages: 194 - 199
An adaptive system for the automatic control of systems for compensating the reactive power of substations A. A. Voloshin Power Systems and Electric Networks 19 August 2009 Pages: 200 - 206