Adapting the monitoring and control systems on the 300 MW power generation units at the Iriklinskaya GRÉS to modern operational requirements

  • Thermal Power Stations
  • Published:
Power Technology and Engineering Aims and scope

Work done by JSC “Interavtomatika” and the Iriklinskaya GRÉS (State Regional Electric Power Plant) to create automatic frequency and power control systems is reported. This involved reconstructing the turbine regulator systems and modernizing all the regulators for the power generator unit (those coupled to and those not coupled to the automatic frequency and power control systems) and the automatic burner control systems on the basis of a unified Simatic PCS7 PS controller system for the four 300 MW power generation units at the Iriklinskaya GRÉS.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. STO 59012820.27.100.002-2005. JSC “SO-TsDU EÉS” Standard. Norms for Participation of Power Generator Units at Thermal Electric Power Plants in Normalized Primary and Automatic Secondary Frequency Regulation [in Russian], Moscow (2005).

  2. A. G. Sviderskii, H. Herpel, and V. L. Kishkin, “Technical methods for automation of power plant equipment,” Élektr. Stantsii, No. 1 (2004).

  3. I. Z. Chernomzav and K. A. Nefedov, “Improvements in the systems for automatic regulation of high power steam turbines,” Teploénergetika, No. 10 (2008).

  4. V. A. Bilenko, A. D. Melamed, É. É. Mikushevich, et al., “Development and installation of automatic frequency and power control systems for large power generator units,” Teploénergetika, No. 10 (2008).

  5. Safety Rules for Gas Distribution and Gas Consumption Systems. Confirmed by Decree No. 9 of March 18, 2003 of Gostekhnadzor Rossii (State Engineering Standards, Russia) [in Russian].

  6. RD 153-34.1-35.108-2001. Technical Conditions for Completion of Engineering Safeguards and Interlocks for Use of Oil and Natural Gas in Boiler Installations in Accordance with Explosion Hazard Specifications [in Russian], Izd. ORGRÉS, Moscow (2001).

  7. RD 153-34.1-35.138-00. Technical Conditions for Completion of Engineering Safeguards and Interlocks in Accordance with theSafety Rules in the Gas Industryfor Boilers in which Gas Units of the Firm JSCAMAKSare Installed in the Gas Feed Line to the Boilers, Izd. ORGRÉS, Moscow (2000).

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Élektricheskie Stantsii, No. 2, February 2009, pp. 65–74.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bilenko, V.A., Chernomzav, I.Z., Kuznetsov, N.A. et al. Adapting the monitoring and control systems on the 300 MW power generation units at the Iriklinskaya GRÉS to modern operational requirements. Power Technol Eng 43, 170–179 (2009). https://doi.org/10.1007/s10749-009-0093-4

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-009-0093-4

Keywords

Navigation