1 Introduction

Piled embankments, with or without geosynthetic reinforcement, have been widely used to overcome several issues (e.g., insufficient bearing capacity, local instability, and unacceptable settlement), encountered in the construction of railways and highways over weak soils (e.g., highly compressible soil, alluvial clay, and peat) (Chen et al., 2010; 2013; 2014; 2016; Ling et al., 2010; Briançon and Simon, 2012; Liu et al., 2012; Wang C. et al., 2014). Soil arching plays a very important role in reducing the embankment load shared by the weak soil between piles, which is essentially a stress redistribution phenomenon caused by the pile-subsoil relative displacement (Δs), and has been proven to be a key load-transfer mechanism in embankments. However, the soil arching developed in a piled embankment remains poorly understood (Gabr and Han, 2005; Chen et al., 2008; Lai et al., 2014; Lu and Miao, 2015), including its most fundamental characteristics (e.g., formation and features). Hence, further studies are required and would be of practical importance in the optimization of relevant design methods.

To help identify the load-transfer mechanism of soil arching in embankments, various assumptions models regarding the features of soil arching have been proposed. Terzaghi (1943) established a 2D soil arching model by the equilibrium equation for relative displacement of embankment fill and considered that the influence height of soil arching was about twice that of the pile clear spacing, but did not mention the arch shape. Guido et al. (1987) proposed a pyramidal model with an inclined angle of 45° to describe soil arching in embankments, while Carlson (1987) considered that soil arching in embankments was a sphenoid with an apical angle of 30°. Meanwhile, Carlson (1987) and Guido et al. (1987) argued that the subsoil carried the embankment load only below the soil arching and the rest of the embankment load was fully shared by the piles. Depending on laboratory model tests, Hewlett and Randolph (1988) established a semi-spherical model (termed the H&R model) to depict soil arching in embankments and considered that the ultimate state of soil arching would be reached either at the crown of the arch or just above the pile cap. Kempfert et al. (1997) improved the soil arching model proposed by Hewlett and Randolph (1988) and considered that soil arching in embankments was made up of multiple semi-spheres with different centres. Furthermore, van Eekelen et al. (2013; 2015) developed a soil arching model with concentric hemispheres based on the models of Hewlett and Randolph (1988) and Zaeske and Kempfert (2002). Meanwhile, Rui et al. (2016a; 2016b) argued that there are three soil arching evolution patterns (i.e., a triangular expanding pattern, a tower-shaped evolution pattern, and an equal settlement pattern) in piled embankments. In summary, the existing soil arching models are quite different from each other, owing to the different assumptions adopted on the features of soil arching in each case. These different models pose some confusion in practical design.

Terzaghi (1943) considered that the relative displacement in embankment fill and the support for the arch feet were the two premises for the formation of soil arching. Obviously, in a piled embankment, the relative displacement in an embankment fill is caused by Δs and the piles serve as the support for the arch feet. Meanwhile, existing studies implicitly assumed that the development of soil arching in an embankment would complete with a tiny Δs. To investigate the influences of Δs on the soil arching effect, Chen et al. (2008) conducted a set of laboratory model tests. The experimental results indicated that the degree of the soil arching effect increased gradually with Δs and eventually reached a relatively stable state. However, only the variation of soil arching effect with Δs on a macroscopic scale was performed in Chen et al. (2008)’s study, and the intrinsic factors (e.g., formation and features of soil arching) causing variation in the soil arching effect were not completely revealed, as seems to be difficult with the macroscopic indices (e.g., soil pressure, settlement, and excess pore water pressure) using the measurements of field or laboratory model tests. Consequently, numerical simulation is necessary to uncover the complicated inherent characteristics of soil arching at a microscopic scale. The finite element method (FEM) and the finite difference method (FDM) have been widely used as numerical tools to model piled embankments (Han and Gabr, 2002; Zhang et al., 2013; Benmebarek et al., 2015), but these methods are based on the continuum assumption and make it difficult to capture the micro-behaviour of granular fill. As an alternative, the discrete element method (DEM), based on the dis-continuum assumption, offers an approach for gaining an insight into the micro-behaviour of granular material. DEM has received increasing attention and popularity over the past decade or more (Jenck et al., 2009; Bhandari and Han, 2010; Han et al., 2012; Lai et al., 2014; Wang Z.J. et al., 2014; 2016) since it addresses the major drawbacks of FEM and FDM.

The objective of this study is to investigate the formation and features of soil arching in piled embankments with or without geosynthetic reinforcement using DEM based on a software called PFC2D (Itasca, 2008). The work presented in this study can be divided into three parts: (1) determining the micromechanical properties of embankment fill and geosynthetic via a series of numerical tests, and calibrating the DEM modelling parameters by comparing the simulation results with the published experimental data; (2) performing detailed investigation on the formation and features of soil arching at both macroscopic and microscopic scales; (3) identifying the influences of some governing factors on soil arching.

2 DEM numerical analysis

2.1 Description of selected cases

The fundamental cases conducted in this study are based on the laboratory model tests reported in Chen et al. (2008). The basic information about the model tests is shown in Fig. 1. The maximum embankment height was 1200 mm. Δs was simulated by discharging water from the water bags during the tests. The coefficient of uniformity Cu of the sand was 2.5, and the coefficient of curvature Cc was 0.96. Other characteristics were D10=0.1 mm, D60=0.25 mm, and Dmax=2 mm. The unit weight of the sand was 15.35–15.83 kN/m3 with a relative density of (55±7)%. The peak secant friction angles of the embankment fill were determined by triaxial compression tests to be 45° and 43° corresponding to effective confining stresses of 10 kPa and 50 kPa, respectively. For the geosynthetic reinforcement case, the geosynthetic (biaxial tensile strength 22.5 kN/m at 8% axial strain) was laid just upon the water bags and cap-beams with both ends fixed on the top of the side cap-beams. Detailed information about the tests can be found in Chen et al. (2008).

Fig. 1
figure 1

Layout of test set up (Chen et al., 2008)

(a) Top view; (b) Side view. h is the embankment height

2.2 Numerical modelling

In this study, a 2D simulation using DEM modelling is performed with the software PFC2D. Due to the symmetry of the laboratory model (Fig. 1), the computational domain for the simulation is selected on one half of the model and the profile of a numerical embankment over piles is presented in Fig. 2. The rectangular box and piles are simulated by walls, and the embankment fill is modelled by particles. The improved multi-layer compaction method (Lai et al., 2014) is utilized to obtain a dense and homogeneous assembly, and the thickness of each layer is selected as 100 mm, which is consistent with the sand filling procedure in the laboratory model tests. A half of the pile (0.075 m×0.20 m) is placed on both sides below the embankment. For the geosynthetic reinforcement case, a geosynthetic sheet which is modelled by the parallel bonded particles is first placed upon the piles with both end particles fixed upon piles, and then the embankment fill particles are generated upon the geosynthetic. Δs is simulated by moving the trap wall at the bottom of the embankment (Fig. 2) with a constant velocity of 0.001 m/s. The stress state, which is a continuum quantity, can be obtained by a measurement circle using the volume average method. Thus, a series of measurement circles are laid in the embankment to record the variation of stress state during the simulation.

Fig. 2
figure 2

DEM model of a piled embankment with an optional geosynthetic reinforcement

2.3 Determination of the input parameters

2.3.1 Embankment fill properties

The properties of embankment fill have been calibrated by numerical biaxial tests (Jenck et al., 2009; Bhandari and Han, 2010; Han et al., 2012; Lai et al., 2014). A set of un-bonded particles with diameters ranging from 4.0 mm to 7.0 mm are generated at a porosity of 0.16 under the gravity deposition method. Then, different confining stresses (10 kPa, 25 kPa, and 50 kPa, respectively) are applied to the assembly by a numerical servo-mechanism. Fig. 3 presents the deviatoric stress versus axial strain which is obtained by numerical biaxial tests using PFC2D. Following the recommendations of Bolton (1986), the peak secant angle of shearing resistance, φmax, can be determined as 45.20°, 43.35°, and 41.09°, corresponding to the confining stresses of 10 kPa, 25 kPa, and 50 kPa, respectively. Overall, φmax agrees well with that of the sand used in the laboratory model tests (Chen et al., 2008), and the corresponding micromechanical properties of the particles are summarized in Table 1.

Fig. 3
figure 3

Deviatoric stress versus axial strain of numerical biaxial tests using PFC 2D ( σ 3 is the confining stress)

Table 1 Micromechanical properties for the DEM analysis

2.3.2 Geosynthetic properties

The properties of the geosynthetic were calibrated by numerical tensile tests (Jenck et al., 2009; Han et al., 2012; Lai et al., 2014). The parallel bond model which can bear tension is used to simulate the geosynthetic. The diameter of the geosynthetic particle is selected as 2 mm. According to JTJ/T 060-98 (MOT, 1999), the total length of geosynthetic for tensile test simulation is selected as 100 mm. With the end particle fixed, a constant horizontal velocity v of 20 mm/min is applied to the starting particle to simulate the tensile test. The variation of contact bond force of the starting particle is recorded by the elongation of the geosynthetic. Comparison between DEM and experimental results is shown in Fig. 4 and the corresponding micromechanical parameters of the geosynthetic are presented in Table 1. It can be observed from Fig. 4 that DEM results have a good agreement with the experimental data.

Fig. 4
figure 4

Comparison between the DEM and experimental results of a geosynthetic in tensile test

2.4 Modelling parameters calibration

To ensure the realistic representation of numerical modelling of piled embankments, calibration for the parameters involved in the modelling is verified against the variation of soil pressures acting on pile surface (σp) and subsoil (σs). Only the comparison between the DEM results and experimental data for the case without geosynthetic reinforcement is presented here (Fig. 5), because the variation of soil pressure with Δs for the geosynthetic reinforcement case has not been presented in Chen et al. (2008). In DEM, with an increase in Δs, σp gradually increases from 18.60 kPa to 63.31 kPa, and σs gradually decreases from 18.60 kPa to 7.87 kPa. However, in the laboratory model test, σp increases from 30.81 kPa to 63.97 kPa and σs decreases from 17.51 kPa to 6.34 kPa. Through comparing the soil pressures obtained from DEM and laboratory model tests, it can be found that the variation trends and the maximum (or minimum) values of σp (or σs) are in a good agreement although Δs in DEM is smaller than that in the laboratory model tests. An explanation could be that the irregular shape and the rough surface of sand particles cannot be reasonably modelled in PFC2D, and as a result, a smaller Δs will directly cause greater relative movement of the embankment fill above the pile, which will induce a larger shear stress in the embankment and transfer more load to the piles with a smaller Δs.

Fig. 5
figure 5

Variation of soil pressure for piled embankments without geosynthetic reinforcement

Fig. 5 also shows that, in the initial state (before the water discharge in laboratory model tests or the trap wall moving in DEM, i.e., Δs is 0.0 mm, and denoted as 0.01 mm in Fig. 5), σp is almost identical to σs in DEM, while for the laboratory model test, σp is much greater than σs. Note that Δs in the laboratory model tests was simulated by discharging water from water bags. Before the water discharge, a certain Δs will inevitably take place during the embankment filling, due to the compressibility and flow ability of the water bags. As a result, the soil pressure at the bottom of the embankment becomes non-uniform and the mean pressure on the pile increases from the “theoretical” value (18.60 kPa) to 30.81 kPa, whereas the mean pressure on the subsoil decreases to 17.51 kPa. However, in DEM, Δs is modelled by moving the trap wall at the bottom of the embankment (Fig. 2), which can be strictly controlled at 0.0 mm in the initial state. Thus, it is not surprising that no soil arching effect occurs in the initial state of DEM modelling. More importantly, in this way, an accurate Δs can be achieved at each stage as requested, which would be useful in tracing the evolution of soil arching with an increase in Δs.

3 DEM analysis of soil arching

Soil arching in an embankment is, in essence, a stress redistribution phenomenon induced by the relative displacement of the embankment fill, with the load-transfer of soil arching, is achieved through an interconnected network of force chains via contact points. Soil arching is closely related to the status (e.g., number, magnitude, and orientation) of contacts and forces among the embankment fill, which will inevitably be changed by the relative displacement of the embankment fill. In this section, the formation and features of soil arching in an embankment will be focused upon via both macroscopic and microscopic behaviours (e.g., particle motion, contact force chains, principal stress direction, and contact and force orientations) in the embankment fill. Meanwhile, DEM modelling of the piled embankments without geosynthetic reinforcement (denoted as unreinforced case) and with geosynthetic reinforcement (denoted as geogrid-reinforced case) will be adopted in the following studies.

3.1 Characteristics of particle motions

Essentially, the occurrence of soil arching in an embankment is immediately caused by a relative movement of the embankment fill. Hence, the distribution of the relative movement of embankment fill can be used to identify the features of soil arching in an embankment. Fig. 6 shows the contour of settlement for unreinforced and geogrid-reinforced cases with Δs=2.0 mm. The particles are divided into 16 groups according to the magnitude of settlement. It can be seen from Fig. 6 that the settlement of the particles upon piles is significantly smaller than that of the particles above the subsoil. From the bottom to the top of embankment, the settlement increases upon piles but decreases over the mid-span of the subsoil. Within the lower 480 mm (i.e., 0.8(sa)) of the embankment, the settlement of particles clearly varies in both the vertical and horizontal directions. Nevertheless, in the upper portion of the embankment, the settlement tends to be uniform, and the corresponding settlement of the whole region is approximately (8/16–9/16)Δs. The height of the equal settlement plane (i.e., influence height of soil arching) is approximately equal to 0.8(sa) for both cases. Meanwhile, there is an obvious boundary between the settlements upon the pile head and the mid-span of the subsoil, which approximates to a catenary.

Fig. 6
figure 6

Contour of settlement with Δ s =2.0 mm

(a) Unreinforced case; (b) Geogrid-reinforced case

3.2 Overview of the contact force chains

Contact force chains are the load-transfer medium in an embankment which are able to visually reflect the state of stress redistribution in it. Hence, the contact force chains can, to some extent, be used to identify the features of soil arching in embankments. Moreover, understanding the contact force chains is helpful in studying the load-transfer mechanism of soil arching in embankments. Fig. 7 shows the distribution of contact forces in unreinforced and geogrid-reinforced cases with Δs=2.0 mm. The contact forces are plotted on the same scale and the line width represents their relative magnitude. It can be observed that the contact force concentrating upon the piles is evident in both cases. The maximum compressive contact forces are 1.13 kN and 1.85 kN in unreinforced and geogrid-reinforced cases, respectively, and the maximum tensile force in the geosynthetic of geogrid-reinforced case occurs at the edge of pile surface with a value of 1.31 kN. Moreover, a network of strong contact force (proved to be the contact forces higher than 1.5 times of mean contact force of the whole assembly, referring to Section 3.3.1) gradually aligns in the horizontal direction above the mid-span between piles and forms a “catenary-shaped” arch (referring to the dashed lines in Fig. 7). Meanwhile, the height of the “catenary-shaped” arch is about 0.8(sa) for both cases.

Fig. 7
figure 7

Distribution of contact forces with Δ s =2.0 mm

(a) Unreinforced case; (b) Geogrid-reinforced case

To sum up, on the basis of the variation of soil pressure (Section 2.4) and the characteristics of particle motions (Sections 3.1) and contact force chains (Section 3.2), an inference can be made that the soil arching in a piled embankment is in a catenary shape and the maximum height is approximate 0.8(sa), greater than 0.5(sa) reported in some existing studies (Hewlett and Randolph, 1988; Kempfert et al., 1997; van Eekelen et al., 2013; 2015). For simplicity, an “arching zone” (shown in Fig. 7) is defined here for the following studies.

3.3 Orientations of contacts and forces

Clearly, relative movement of embankment fill leads to particle re-arrangement, which inevitably results in some changes in the status (e.g., number, magnitude, and orientation) of contacts and forces (including average, normal, and tangential forces). Fourier series approximation (FSA) (Rothenburg and Bathurst, 1989; Bathurst and Rothenburg, 1990) is a useful statistical approach to identify the changes in contacts and forces in an interest zone with a predefined bin angle. This method offers a good platform for investigating the evolution of soil arching on the microscopic scale with the orientations of contacts and forces, given the difficulty of applying measurements in field/laboratory experiments, or a numerical model based on the continuum assumption or theoretical approaches. In the following studies, FSA is applied for the statistical treatment of contacts and forces, and the bin angle is set as 10°.

3.3.1 Classification of contact force

As mentioned above, soil arching in an embankment is formed by a network of strong contact forces obviously inclining towards the mid-span between piles (Fig. 7), not all contact forces. Meanwhile, larger forces are generally carried by the contacts orientated to the direction of the major principal stress. Hence, a conjecture can be made that, within the “arching zone”, the contact with a larger force is mainly inclined to the mid-span between piles. For simplicity, it is necessary to classify the complex contact forces into several groups, in an effort to identify the functions of different constituents of soil arching in an embankment. In this subsection, the complex contact forces within the “arching zone” (Fig. 7) are grouped by the value of ζ, at an interval of 0.1. Here, ζ is defined as the ratio of the contact force fc of a given contact to the mean contact force [fc] of the whole assembly, i.e., ζ=fc/[fc].

Fig. 8 depicts the variation of contact orientations within the “arching zone” (Fig. 7) with ζ. As shown in Fig. 8a, with an increase in ζ, the variation curve of principal direction of contact normal anisotropy (θc) can be divided into two segments, i.e., θc>90° for ζ<1.5, and θc≤90° for ζ≥1.5. Meanwhile, in each segment, θc maintains nearly a constant value. Moreover, Fig. 8b shows that with the increase in ζ, the coefficient of contact normal anisotropy (ac) tends to decrease at first but then increase. The boundaries ζ for the two different variation trends are also 1.5. For this reason, the whole network of contact forces can be divided into two parts, namely strong force chain (SFC) and weak force chain (WFC). The former is defined as the force chain with contact forces higher than 1.5[fc] (i.e., ζ≥1.5), while the latter has contact forces below 1.5[fc] (i.e., ζ>1.5).

Fig. 8
figure 8

Variation of contact orientations within “arching zone” with ζ : (a) θ c ; (b) a c

3.3.2 Functions of SFC and WFC

The spatial distribution features of contacts are quite different for SFC and WFC (Fig. 8), indicating that the functions of SFC and WFC may be different. To reveal the functions of the two different parts of contact forces in an embankment, statistical measures and treatments are applied for the direction of the major principal stress (θmax), θc, and average normal contact force anisotropy (θn) within the whole domain of the embankment. θmax is defined as

$${\theta _{{{\max}}}} = {1 \over 2}\arctan \left({{{ - 2{\sigma _{xy}}} \over {{\sigma _{xx}} - {\sigma _{yy}}}}} \right),$$
(1)

where σxx, σxy, and σyy are the average stress tensors in the horizontal, tangential, and vertical directions, respectively. These tensors can be gained via a measurement circle (Fig. 2).

Preliminary statistical results indicate that the distribution of θmax (θc or θn) is approximately the same for unreinforced and geogrid-reinforced cases. Thus, only the statistical results of θmax, θc, and θn for the unreinforced case with Δs=2.0 mm are presented (Fig. 9). We assume that the positive direction is in rightward direction from the horizontal direction, and the included angle of the oblique line with the horizontal direction in each small square (Fig. 9) represents the value of θmax (θc or θn). Additionally, as shown in Figs. 9b and 9c, the statistical results of θc and θn in SFC are absent within a certain region just below the embankment surface, as almost all contact forces within this region are not included in SFC. Compared with the distribution of θmax in the initial state (Fig. 10a), Fig. 9a shows that the rotation of θmax is significant within a certain region (i.e., the “arching zone” illustrated in Fig. 7a) above the pile heads. Furthermore, within this region, a portion of θmax inclines towards the mid-span between the piles and forms an “arching”, whereas the rest of θmax rotates towards the model boundary and functions as a support for the “arching”. As expected, the rotation of θmax upon the “arching zone” is negligible. On the basis of the distribution characteristics of θmax, the embankment can be divided into two regions (i.e., above and below the “arching”) to analyze the different functions of SFC and WFC:

  1. 1.

    Above the “arching”. The orientations of θc and θn in SFC (Figs. 9b and 9c) show high consistency, but in WFC θc is approximately perpendicular to θn (Figs. 9d and 9e). More importantly, θc in SFC coincides with θmax, but θc in WFC does not.

  2. 2.

    Below the “arching”. In SFC, θc and θn are gradually aligned in the horizontal direction above the mid-span between piles and both of them are roughly perpendicular to θmax. However, in WFC, θc shows a reasonable agreement with θmax, although the distribution of θn is irregular.

Fig. 9
figure 9

Distribution of θ max , θ c , and θ n in unreinforced case with Δs=2.0 mm

(a) Distribution of θmax in the initial state; (b) θc in SFC; (c) θn in SFC; (d) θc in WFC; (e) θn in WFC

Fig. 10
figure 10

Evolution of direction of θ max in unreinforced case

Obviously, θc and θn in SFC agree well with the strong contact forces which play a much more important role in forming the “arching”. As shown in Figs. 9a, 9b, and 9d, it can be clearly found that the distribution characteristics of θmax are a combination of θc distribution in SFC and WFC. Namely, the distribution of θmax can comprehensively reflect the distribution characteristics of θc both in SFC and WFC. Practically, the major structure of the “arching” is constructed by the contacts in SFC, while the contacts in WFC serve as the support system for the “arching”. In addition, the distribution characteristics of θmax can offer a visualization of the “arching”. Hence, it will be adopted to depict the “arching” in an embankment in the subsequent analysis.

3.4 Development of soil arching

Some existing studies implicitly assumed that the development of soil arching would be completed suddenly. This assumption is inconsistent with the practical situation and cannot explain the variation of soil pressure with Δs (Fig. 5). In this section, the development of soil arching in piled embankments will be analyzed in detail.

3.4.1 Evolution of shape features

As mentioned before, the distribution of θmax is able to comprehensively reflect the distribution of θc in SFC and WFC and can be used to trace the evolution of soil arching in an embankment with Δs. Meanwhile, the distribution of θmax is approximately the same for unreinforced and geogrid-reinforced cases, and therefore, only the statistical results for the unreinforced case with different Δs are illustrated in Fig. 10. As shown in Fig. 10a, in the initial stage, the principal direction of stress is basically vertical. As presented in Fig. 10b, the principal direction of stress begins to rotate and forms the “soil arching” when Δs occurs. However, note that the so-called “soil arching” at this stage is comprised of two inclined shear planes rather than an arch as Δs is relatively small. At the same time, the distribution of the principal direction of stress below the “soil arching” becomes more and more irregular during this process. With a continuous increase in Δs, the stresses adjust their principal directions and form a “hemispherical-shaped” soil arching (Fig. 10c) as in the model recommended by Hewlett and Randolph (1988). Meanwhile, the distribution of the principal directions of stresses below the soil arching tends to be regular after this stage. Subsequently, as shown in Figs. 10c10f, the soil arching height tends to increase with the increase in Δs and finally approaches a maximum soil arching height of 0.8(sa). After that, the soil arching maintains a relatively stable state with a nearly constant soil arching height of 0.8(sa) (Figs. 10f10i). Fig. 10 also shows that the region for the rotation of θmax (i.e., impact area of soil arching) tends to gradually enlarge with the development of soil arching. For simplicity, the impact area of soil arching can be considered as the soil arching height. After combining the variations of soil pressure (Fig. 5) and soil arching height, the conclusion can be drawn that a higher height of soil arching gives rise to a greater degree of soil arching effect.

3.4.2 Evolution of contact normal anisotropy

It has been demonstrated in Section 3.3.2 that the reorientations of θmax, θc, and θn mainly occur in the “arching zone” and the contacts in SFC are the main component of soil arching. Hence, in this subsection, further investigation on the micro-behaviour of soil arching is performed with the evolution of contact normal anisotropy of SFC in the “arching zone” for unreinforced and geogrid-reinforced cases, as shown in Fig. 11. It can be observed from Fig. 11 that the whole development of contact normal anisotropy for the SFC in the “arching zone” is similar for unreinforced and geogrid-reinforced cases. Specifically, θc decreases gradually with Δs and finally approaches a constant value. However, ac decreases rapidly to a local minimum value and then gradually increases and approaches a constant value. Essentially, the evolving process of soil arching in embankment is the consequence of continuous adjustment of contacts with the Δs. Combining the variation of soil pressure (Fig. 5) with the evolution of shape feature (Fig. 10) and contact normal anisotropy of SFC in the “arching zone” (Fig. 11), the development of soil arching in piled embankments can be divided into three stages.

Fig. 11
figure 11

Variation of contact normal anisotropy of SFC in “arching zone” for unreinforced and geogrid-reinforced cases

Stage 1 (formation of soil arching). Once Δs occurs, the relative sliding of embankment fill will arise and thus the particles re-arrange. Due to the rearrangement of particles, the principal direction of contacts will rotate. To be specific, in SFC, θc rotates towards the direction of mid-span between piles (Fig. 10), and hence, the number of contacts decreases in vertical direction and increases in other directions. Thus, as shown in Fig. 11, the decrease in ac for SFC in “arching zone” is approximately linear with the increase of Δs during this stage. Note that, at a small Δs, only the inclined shear plane, rather than the arch, is formed in the embankment (Fig. 10b), although the soil arching effect has occurred (Fig. 5). With a continuous increase in Δs, the shear plane evolves into a “hemispherical-shaped” soil arching (Fig. 10c), due to the constant adjustment of the principal direction of contacts. In addition, the rotation is mainly within the height of 0.5(sa) upon the pile head (Figs. 10b and 10c).

Stage 2 (further development of soil arching). With an increase in Δs, the range for the rotation of contacts evidently enlarges (Figs. 10c10f), and as a result, more contacts begin to rotate towards the direction of the mid-span between piles. Thus, θc in SFC continues to decrease with the increase in Δs (Fig. 11). However, the variation of ac in SFC is found to increase gradually with Δs, meaning that, in SFC, the number of contacts mainly increases in the corresponding principal direction of anisotropy. During this process, the height of soil arching (Fig. 10) and the degree of soil arching effect (Fig. 5) increase gradually with Δs.

Stage 3 (relatively stable stage of soil arching). With a further increase in Δs, for the SFC in the “arching zone”, the number of contacts remains relatively stable. Thus, as shown in Fig. 11, θc and ac in SFC remain nearly constant, indicating that the soil arching in a piled embankment is in a relatively stable state at this stage.

In summary, Δs has a significant influence on the formation and features of soil arching in piled embankments with or without geosynthetic reinforcement, and the maximum soil arching height is approximately 0.8(sa) in this study. Meanwhile, the numerical results also show that the macro- and micro-behaviours (e.g., particle motion, contact force, and fabric anisotropy) are approximately similar for piled embankments with or without geosynthetic reinforcement at each stage. This finding indicated that the presence of geosynthetic has a negligible influence on the formation and features of soil arching in a piled embankment when Δs for both cases are identical. Meanwhile, note that in practice, for a piled embankment with geosynthetic reinforcement, the development of soil arching will be slowed down due to the reduction of Δs by the geosynthetic reinforcement, and it would be definitely completed with sufficient Δs.

4 Parametric study of soil arching without geosynthetic reinforcement

Parametric study is necessarily conducted to further understand the evolution of soil arching in a piled embankment and its governing factors. In this section, the unreinforced case is selected as the benchmark, and the effects of some practically important factors (e.g., friction coefficient of embankment fill, embankment height, pile clear spacing, and relative density of embankment fill) on the development of soil arching are investigated. Additionally, many indices can be used to indirectly characterize the degree of the soil arching effect. One representative parameter, the efficacy of the embankment, is adopted as an indicator to evaluate the applicability of the numerical model established in preceding sections. As defined by Hewlett and Randolph (1988), the efficacy E can be expressed as

$$E = {{{F_{\rm{p}}}} \over W},$$
(2)

where Fp is the load applied on the pile, and W is the weight of a mat slice of length s, i.e., the pile spacing of a pied embankment. The larger the value of E, the greater the soil arching effect. If no soil arching effect occurs in the embankment, the value of E is equal to the capping ratio, α, i.e.,

$$\alpha = {a \over s},$$
(3)

where a is the width of the pile.

4.1 Friction coefficient of embankment fill

Some laboratory model tests (van Eekelen et al., 2012a; 2012b) and numerical simulations using continuum models (Jenck et al., 2007; Benmebarek et al., 2015) have demonstrated that the macroscopic friction angle of the embankment fill has a significant effect on the load-transfer efficacy of an embankment. For a given particle size distribution in DEM, the macroscopic friction angle (e.g., φmax) of an assembly is unique, which can be determined by the microscopic friction coefficient (f), and the relation between φmax and f can be calibrated by numerical biaxial tests (Section 2.3.1). Specifically, the variation of φmax with f is found to follow a logarithmic relation (i.e., φmax=6.82lnf+49.50) by the numerical biaxial tests (Fig. 3) in this study. As expected, the microscopic friction coefficient of embankment fill has a great influence on the load-transfer efficacy of an embankment, as shown in Fig. 12. An increase of f from 0.1 to 0.9 leads to an increase of the maximum efficacy from 43% to 78%, even though the soil arching heights are more or less identical in each case, as depicted in Fig. 13. A tentative inference from this result is that the friction coefficient of the embankment fill has a significant effect on the load-transfer between the soil arching and the embankment fill below the arching, but not the soil arching height. Meanwhile, Fig. 12 also shows that the threshold value of Δs where the efficacy reaches the maximum is approximately the same for each case. So the friction coefficient of embankment fill has a negligible influence on the formation and features of soil arching. In addition, note that a point of sudden change can be observed with each case (Fig. 12), which may be related to the failure of soil arching, and the critical Δs where the efficacy changes abruptly tends to increase with the increase of f. This indicates that the friction coefficient (corresponding to the friction angle in the macroscopic scale) of embankment fill has a significant effect on the stability of soil arching in embankments.

Fig. 12
figure 12

Effect of friction coefficient f of embankment fill on efficacy

Fig. 13
figure 13

Distribution of θ max with different friction coefficients f of embankment fill at Δ s =2.0 mm

4.2 Embankment height

In practice, it is necessary to have sufficient embankment height to ensure that localized differential settlement cannot occur at the surface of the embankment, which implicitly indicates that the embankment height is another key factor governing the formation and features of soil arching in an embankment. It is evident in Fig. 14 that an embankment shows greater efficacy, the higher it is. More importantly, note that, when the height is less than 420 mm (i.e., 0.7(sa)), the efficacy reaches a maximum at Δs=0.1 mm, and then maintains an almost constant value. Since the height is less than 420 mm (i.e., 0.7(sa)), the embankment height is relatively low and only an inclined shear plane, rather than an arch, can be formed in the embankment as shown in Fig. 15a. When 420 mm≤h≤840 mm (i.e., 0.7(sa)≤ h≤1.4(sa)), the efficacy increases gradually and obtains a relatively constant value after Δs exceeds a certain value. As presented in Figs. 15b and 15c, when 420 mm≤h≤840 mm (i.e., 0.7(sa)≤h≤ 1.4(sa)), the embankment height is sufficient for partial arching but still insufficient for the formation of full arching. After the height is greater than 840 mm (i.e., h>1.4(sa)), the effect of embankment height on the critical Δs, where the efficacy changes abruptly, can be ignored (Fig. 14), as the embankment height is sufficient for the formation of full arching and the soil arching heights are more or less the same in each case (Figs. 15d and 15e). The embankment height is thus another key factor governing the formation and features of soil arching in embankments.

Fig. 14
figure 14

Effect of embankment height on efficacy

Fig. 15
figure 15

Distribution of ?max with different embankment heights at Δ s =2.0 mm

Meanwhile, the laboratory model test results (Chen et al., 2008) indicated that the critical height of an embankment for differential settlement on the embankment surface is about 1.4 times the pile clear spacing. This result agrees well with the boundary of the embankment height for partial arching and full arching in this study. Thus, the conclusion can be drawn that full arching is able to prevent the occurrence of differential settlement on the embankment surface, but partial arching will not.

4.3 Pile clear spacing

Actually, pile clear spacing is an important design parameter in piled embankments, as it has significant influence on the construction cost and efficacy of embankments. Fig. 16 depicts the variation curves of efficacy versus Δs for different pile clear spacings. As expected, a smaller pile clear spacing gives rise to a greater efficacy of embankment. However, note that the critical Δs where the efficacy reaches its maximum value decreases. In other words, for an embankment with a smaller pile clear spacing, a smaller Δs is needed for the formation of soil arching in the embankment. However, as shown in Fig. 17, the maximum arching height is approximately equal to 0.8(sa) for each case. Hence, a conclusion can be drawn that pile clear spacing has a significant influence on the formation of soil arching, but not on its features.

Fig. 16
figure 16

Effect of pile clear spacing on efficacy

Fig. 17
figure 17

Distribution of θ max with different pile clear spac-ings at Δs=2.0 mm: (a) s-a=150 mm; (b) s-a=300 mm; (c) s-a=450 mm; (d) s-a=600 mm

5 Conclusions

In this study, a series of 2D DEM numerical simulations have been conducted to investigate the formation and features of soil arching in piled embankments with or without geosynthetic reinforcement with an increase in Δs. Based on the analysis and discussion of the results, the following conclusions can be drawn.

Δs has a significant influence on the formation and features of soil arching in piled embankments with or without geosynthetic reinforcement. Soil arching in embankments is formed by the SFC with contact forces above 1.5 times mean contact force (1.5[fc]) of the whole assembly, while the WFC acts as a support system. At smaller Δs, the “soil arching” is comprised of two inclined shear planes rather than an arch. Then, with an increase in Δs, the inclined shear plane is transformed into a hemispherical soil arch, due to the rotation of the principal directions of contacts and forces. With a further increase in Δs, the height of the hemispherical soil arching gradually increases. Finally, the height approaches the maximum value of 0.8(sa), and then maintains a relatively stable state within the Δs range of interest in this study. For a given case, a greater height of soil arching gives rise to a greater degree of soil arching effect. However, the presence of geosynthetic has a negligible influence on the formation and features of soil arching if Δs are identical for both geosynthetic reinforced and unreinforced cases.

Parametric studies indicate that the friction coefficient (corresponding to the friction angle on the macroscopic scale) of embankment fill has a negligible influence on the formation and features of soil arching, although it has a significant influence on the degree of the soil arching effect. As expected, the degree of the soil arching effect increases gradually with the embankment height. Meanwhile, note that the embankment height is a key factor governing the formation and features of soil arching. To be specific, only two shear planes are formed if h<0.7(sa), a partial arching is formed if 0.7(sa)≤h≤1.4(sa), and a full arching is formed if h>1.4(sa). In addition, a smaller pile clear spacing gives rise to a greater degree of soil arching effect. The pile clear spacing has a significant effect on the formation of soil arching, but not on its features.

Further studies using 3D model tests and numerical simulations are required and would be useful to investigate the validity of the findings in this study. Meanwhile, more research is needed on the influence of piles arranged in various patterns (such as square pattern and equilateral triangular pattern) on the formation and features of soil arching in the 3D case.