Historic precedents

In our knowledge some of the first stacked load bearing glass walls started to be developed around late 1990s. One of the notable examples, from our point view, would be the Glass Cube Reading Room, Arab Urban Development Institute, Riyadh, Saudi Arabia, designed by Dewhurst Macfarlane and Partners (Macfarlane, Architectural Review Middle East 1999) . In this project, 3 rows of 2.67 m high façade panels are stacked (supported one on top of the other) rather than hung and are structurally bonded to the glass beams and columns to create a 8 m cube.

We have used the above precedent to develop load bearing technology further in our Bolton’s Place residential development project in South West London using vertically stacked structural glass in three glass lift enclosures, completed in 2006. In this earlier project we have used vertically stacked triple laminated glass which carried it’s own weight five storeys up. Each shaft in this project measured 2.5\(\,\times \,\)1.5\(\,\times \,\)20 m high and comprised of laminated glass walls which were stacked on top of each other through a stainless steel flat plate frame which provided lateral stability through connection at each floor, see Figs. 12, and  3.

Fig. 1
figure 1

Bolton’s place lift shafts, project completed in 2006

Fig. 2
figure 2

a General arrangement of the stainless steel structure b extract from a FE analysis

Fig. 3
figure 3

Typical section through the glass

Based on our experience with the above project we were approached by the main contractor (Walter Lilly) who were working on a major refurbishment of the a residential property with a triple basement in Knightsbridge, London where the architects (Tim Flynn architects, TFA) were designing a feature glass lift, Ø1.4 m and spiral staircase around it in a very confined floor space, connecting eight storeys with total height of around 28 m.

Design of the main shaft enclosure

Concept

From the early design meetings with the architects it was clear that simple glass cladding supported at end of the cantilevered stair wasn’t desired by the TFA as well as it would cause some issues with the differentials movement of the treads and necessity of provided continuous movement joint along the spiral edge. On top of all that, the architect liked the idea of having a “shadow gap” between the shaft and the edge of the stair. Which meant that the glass lift enclosure would have to be structurally independent of the stair and carry it’s own weight all the way down to the foundations, see Fig. 4.

Fig. 4
figure 4

a Typical floor plan of the lift shaft b roof light c axonometric general arrangement

Design philosophy

The main shaft therefore was designed as an independent self-supporting structure with all the self-weight load supported at the bottom of the shaft on concrete slab. Helical steel handrails which split the glass at 1m above each level of stair, wrapping around it, are acting as H-shaped channels transferring vertical load down from one panel to another, see Fig. 5a. Handrails are fixed into vertical guide rail columns at each end which provides the stack its lateral stability, see Fig. 5c. Openable roof top (top hat or “the drum”) was designed as a structurally independent part relying on two cantilevered beams rigidly fixed into a metal ring and outer main structure supporting the glass cylinder part, see Figs. 4a and 6c.

Handrail design as a key to installation and replacement strategy

One of the main difficulties in these kind of projects (confined tall spaces) is the installation of glass and it’s replacement (in case if broken)—important criteria to consider in the design. We have adopted simple stack from the bottom to the top approach which had implications on the handrail design—one of the most complicated elements on the project. It has been decided that each glass panel comes in pre-bonded channels (top and bottom only as vertical glass joints designed to be open) and fitted into H-shaped handrail channel with series of CSK screws, connecting outer plates of the H profile so that at later stage it can be simply unscrewed and panel taken out if replacement is required. As a result elaborate system of metal plates with hit & miss cuts was developed to connect outer plates which are fixing the glass channel to the handrail core, see Fig. 5.

Fig. 5
figure 5

a Typical handrail section b handrail elevation with fixings layout c handrail to guiderail and landing connection

Glass selection

Lift enclosure size was dictated by very tight floor plate arrangement and was limited to 1.4 m diameter. Which meant that our glass was outside minimum possible commercially available curved toughened glass of R\(_\mathrm{min}\) = 1 m hence annealed glass had to be used. Based on draft version of European standard for use of glass in structures, following design values were adopted for this project, see Tables 1 and 2:

Fig. 6
figure 6

a 3D design model view b max uls stress (2 MPa average, with maximum 5 MPa in some areas) c top hat “the drum” general arrangement and deformation diagram with max SLS deformations around 2 mm

Table 1 Glass properties adopted, based on prEN13474, replaced by prEN16612
Table 2 Other materials properties
Table 3 Loadings adopted in the design based on BS EN 1991-1-1 (EC1 part 1) and UK NA
Fig. 7
figure 7

Extract from the glass schedule, developed surface, tender stage with maximum panel length 4.5 m

Fig. 8
figure 8

a Testing specification sketch b samples tested for adhesion, September 2015

Fig. 9
figure 9

Section through roof top cylinder glass (top hat)

Fig. 10
figure 10

Section through bottom part of the openable roof top

Glass panel thickness was adopted as 3\(\,\times \,\)8 mm annealed glass laminated with EVA interlayer each 1.5 mm thick.

Other materials used in the construction

See Table 2.

Loading adopted in the design

See Table 3.

Load combinations used

Load combinations taken in accordance with Eurocode 0 & 1:

$$\begin{aligned}&{\hbox {ULS}}: 1.35{\hbox {G}}_\mathrm{k} + 1.5\, {\hbox {Q}}_\mathrm{k1} + 1.5 \,{\hbox {Q}}_\mathrm{k2}\\&{\hbox {SLS}}: {\hbox {G}}_\mathrm{k} + {\hbox {Q}}_\mathrm{k1} + {\hbox {Q}}_\mathrm{k2} \end{aligned}$$

Computer modelling

Full FE model was built in order to predict critical design stresses and deformations under various design situations. In total 13,905 plates and 862 beam elements were used with average FE element being 100\(\,\times \,\)100 mm with denser mesh around the edges and corners, see Fig. 6. Openable roof top (top hat or “the drum”) was designed as a structurally independent part relying on two cantilevered beams rigidly fixed into metal rings (inner and outer) which support the glass cylinder part, see Fig. 6c. Therefore the main focus initially was onto the analysis of the main lift shaft enclosure as it was the heaviest part of the construction with longer program. Glass panels were modelled as solid plates of equivalent thickness, calculated in accordance with procedures stipulated in the Institution of Structural Engineers: Structural use of glass in buildings (2nd ed), (IStructE Feb. 2014) (Fig. 7).

Arbokol testing

Load transfer from glass to steel and back to lower glass is largely depending on bearing through the grout as well as adhesion of grouting to glass and steel. Although general mechanical properties of the grout itself were known to us Arbokol datasheet supplied by the manufacturer, adhesion between the grout and glass was not, hence required testing. Testing was carried out in September 2015 by Sandberg. The test comprised of three samples of triple laminated glass 3\(\,\times \,\)8 mm thick in 40\(\,\times \,\)25 mm stainless steel channel, 100 mm long. Adhesion area was around 50mm long, with around 15–20 mm embedment, see Fig. 8.

Test specimen were clamped in calibrated universal test machine with load applied at the rate of 2 kN/min. Based on testing results and their evaluation design adhesion stress to the glass worked out to be around 2 MPa, which is almost double of the stresses predicted in the FE model.

Fig. 11
figure 11

a Handrail splice detail b end of handrail bracket

Fig. 12
figure 12

a Handrail splice detail b end of handrail bracket

Fig. 13
figure 13

a 1 m by 1 m Specimen b trial application c different grade arbokol d final inspection and approved grade

Openable roof light

Design philosophy

The openable roof light (top hat) was designed to be independent structurally from the rest of the glass lift enclosure for various reasons. The ultimate top roof light, circular in shape double glazed unit is designed to be removable for reasons of installation of glass and replacement if necessary. For glass composition and typical section details through the “top hat” see Fig. 9.

Rolling mechanism

Series of rollers were used on inner and outer perimeter rings to support sliding roof light. The roof light, Ø3.4 m (outer) and Ø1.4 m (inner), comprised of crescent shape walk on double glazed units, with central angle being \(180^{\circ }\) Top sheet of DGU, spanning 1m between inner and outer perimeter ring support, comprised of 3\(\,\times \,\)10 mm toughened laminated glass and inner stepped sheet as 2\(\,\times \,\)6 mm thick toughened laminated glass, see Fig. 10.

The sliding unit is moving by means of spur pinion gear with planetary type motor with supporting V-shaped wheels spaced at 36\(^{\circ }\), which equates at approximately 1 m spacing on outer perimeter and 0.5 m spacing on inner perimeter.

Production

Handrail production

After about 1 year delay production has started with manufacturing of the handrail, in June 2014 at Glass UK factory where steel drum was created to be used as a template for the curvature, see Fig. 11.

Glass production

Due to various commercial considerations the glass sub-contractor chose to produce all the curved glass in the UK at their factory. A lot of sacrificial slumping test panels were created until visual qualities and appearance of the panel satisfied specification. Additional difficulties occurred due to rhomboid shape of the glass and special procedures were required to create required curvature, see Fig. 12. When the glass slumping was resolved lamination was carried out using EVA film of 1.5 mm thick.

Fig. 14
figure 14

a Crane lift to the roof b through oculus c down in the shaft d installation of the openable roof light

Arbokol workability test

Glass production tolerances adopted based on “Glazing manual” by GGF (glass and glazing federation)

(i) Maximum step on long edge, mm

1 overall, 2 mm max step on the edge

 

(ii) Maximum step on short edge (T&B), mm

1.5 overall, 3 mm max step on the edge

 

(iii) Overall thickness, mm

2.3

 

(iv) Girth variation, mm

2

 

(v) Vertical edge straightness (warp), mm/m

1

Total 4 mm

(vi) Vertical edge side straightness, mm/m

1.25

Total 5 mm

Fig. 15
figure 15

View of the segment, across and top hat. View up completed shaft

Construction

Installation of glass

Installation of glass began around March 2015 and took almost exactly one year to complete. Glass was lifted up with hoists using overhead gantry and down through the oculus of the openable roof light. Despite very tight working space none of the glass panels were damaged during installation process. Hydraulic ram lift was used as a working platform to facilitate the process of installation. Slow speed of installation ensured that grouting was properly cured before the next level of glass is received (Figs. 13, 14, 15).

Conclusion

In conclusion, after a long period of design, manufacturing and construction, 28 m tall lift shaft was completed on the 29th March 2016, making this structure, in our view, tallest self-supporting glass structure in the world (Vasilchenko-Malishev 2016), and further pushing boundaries of edge bearing technology in glass.