The results of preparation and testing of switching the PGU-200 power unit of the South-West CHP to the house-load mode of operation by the underfrequency islanding system are presented
Similar content being viewed by others
References
A. V. Chugin, M. S. Tsvetkov, R. I. Kostyuk, K. V. Babkin, V. A. Bilenko, K. A. Molchanov, V. V. Fedunov, and V. G. Razogreev, “Experience of implementing a PGU-200 MW two-boiler one-turbine unit at the South-West CHP,” Power Techn. Eng., 48(2), 140 – 146 (2014).
Author information
Authors and Affiliations
Corresponding author
Additional information
Translated from Élektricheskie Stantsii, No. 7, July 2014, pp. 23 – 28.
Rights and permissions
About this article
Cite this article
Tsvetkov, M.S., Kostyuk, R.I., Chugin, A.V. et al. Experience in Switching the PGU-200 Power Unit of the South-West CHP to House-Load Operation Mode by the Underfrequency Islanding System. Power Technol Eng 48, 386–390 (2015). https://doi.org/10.1007/s10749-015-0539-9
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10749-015-0539-9