Experience in Switching the PGU-200 Power Unit of the South-West CHP to House-Load Operation Mode by the Underfrequency Islanding System

  • Published:
Power Technology and Engineering Aims and scope

The results of preparation and testing of switching the PGU-200 power unit of the South-West CHP to the house-load mode of operation by the underfrequency islanding system are presented

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. A. V. Chugin, M. S. Tsvetkov, R. I. Kostyuk, K. V. Babkin, V. A. Bilenko, K. A. Molchanov, V. V. Fedunov, and V. G. Razogreev, “Experience of implementing a PGU-200 MW two-boiler one-turbine unit at the South-West CHP,” Power Techn. Eng., 48(2), 140 – 146 (2014).

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. S. Tsvetkov.

Additional information

Translated from Élektricheskie Stantsii, No. 7, July 2014, pp. 23 – 28.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Tsvetkov, M.S., Kostyuk, R.I., Chugin, A.V. et al. Experience in Switching the PGU-200 Power Unit of the South-West CHP to House-Load Operation Mode by the Underfrequency Islanding System. Power Technol Eng 48, 386–390 (2015). https://doi.org/10.1007/s10749-015-0539-9

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-015-0539-9

Keywords

Navigation