Skip to main content
Log in

Experience of Implementing a PGU-200 MW Two-Boiler One-Turbine Unit at the South-West CHP

  • Published:
Power Technology and Engineering Aims and scope

The engineering solutions for PGU-200 MW unit, the electrical distribution system layout, and the results of implementing the SPPA-T3000 control system are presented. The results of performance adjustment confirm that the requirements by the System Operator of the Unified Power System are met. The organizational structure for operating personnel is described.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Translated from Élektricheskie Stantsii, No. 2, February 2014, pp. 16 – 23.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Chugin, A.V., Tsvetkov, M.S., Kostyuk, R.I. et al. Experience of Implementing a PGU-200 MW Two-Boiler One-Turbine Unit at the South-West CHP. Power Technol Eng 48, 140–146 (2014). https://doi.org/10.1007/s10749-014-0498-6

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-014-0498-6

Keywords

Navigation