Erratum to: Environmental ManagementDOI 10.1007/s00267-016-0791-2

The original version of this article unfortunately contained a mistake. A value in Table 1 was incorrect in the original publication of the article. The original Deschutes project boundary was 52,609 ha.

Table 1 Characteristics of the six CFLRP landscapes in this study

The corrected Table 1 is given below.