Abstract
Hydrologic cycle is a complex system associated with both certain and uncertain constituents. The propagation of confidence bounds from different uncertainty sources to model output is of great significance for hydrologic modeling. In this paper, we applied the integrated bayesian uncertainty estimator to quantify the effects of parameter, input and model structure uncertainty on hydrologic modeling progressively. Two hydrologic models (Xinanjiang model and TOPMODEL) were applied to a humid catchment under three scenarios. Case I: the shuffled complex evolution metropolis (SCEM-UA) algorithm was conducted to determine the posterior parameter distribution of hydrologic models and analyze the corresponding forecast uncertainty. Case II: input uncertainty was also considered by assuming rain depth bias follows a normal distribution, and integrated with SCEM-UA. Case III: Simulations from two models were combined by the Bayesian model averaging to fully quantify multisource uncertainty effects. Results suggested that, from Case I to II, the containing ratio (percentage of observed streamflow enveloped by 95% confidence interval) obviously increased by an average magnitude of 10% for the study period 2000–2006. Besides, it also found that the width of 95% confidence interval became wider and narrower for Xinanjiang model and TOPMODEL, respectively, from Case I to II. This may indicate that the uncertainty of TOPMODEL results was more remarkable than Xinanjiang model in Case I. By combining results from two models, model structure uncertainty was also considered in Case III. The accuracy of uncertainty bounds further improved with the containing ratio of 95% confidence interval >95%. In addition, the optimized deterministic results from the uncertainty analysis showed that the average Nash–Sutcliffe coefficient increased continually from Case I to II and III (0.82, 0.84 and 0.90, respectively) for the study period. The analysis demonstrated the improvement of modeling accuracy when extra uncertainty sources were also quantified, and this finding also proved the applicability of IBUNE framework in hydrologic modeling.
Similar content being viewed by others
References
Ajami NK, Duan Q, Sorooshian S (2007) An integrated hydrologic Bayesian multimodel combination framework: confronting input, parameter, and model structural uncertainty in hydrologic prediction. Water Resour Res 43:W01403. doi:10.1029/2005WR004745
Beven K (2008) Environmental modelling: an uncertain future?. Taylor & Francis Ltd., London
Beven KJ (2012) Rainfall-runoff modelling: the primer, 2nd edn. Wiley, London
Beven K, Binley A (1992) The future of distributed models: model calibration and uncertainty prediction. Hydrol Process 6:279–298
Beven K, Binley A (2014) GLUE: 20 years on. Hydrol Process 28:5897–5918
Beven KJ, Kirkby MJ (1979) A physically based, variable contributing area model of basin hydrology. Hydrol Sci Bull 24:43–69
Carpenter TM, Georgakakos KP (2004) Impacts of parametric and radar rainfall uncertainty on the ensemble streamflow simulations of a distributed hydrologic model. J Hydrol 298:202–221
Gelman A, Rubin DB (1992) Inference from iterative simulation using multiple sequences. Stat Sci 7(4):457–472
Jiang P, Gautam MR, Zhu J, Yu Z (2013a) How well do the GCMs/RCMs capture the multi-scale temporal variability of precipitation in the Southwestern United States? J Hydrol 479:75–85
Jiang P, Yu Z, Gautam MR (2013b) Pacific and Atlantic Ocean influence on the spatiotemporal variability of heavy precipitation in the western United States. Glob Planet Chang 109:38–45
Jiang P, Yu Z, Gautam MR, Yuan F, Acharya K (2016) Changes of storm properties in the United States: observations and multimodel ensemble projections. Glob Planet Chang 142:41–52
Kavetski D, Kuczera G, Franks SW (2006) Bayesian analysis of input uncertainty in hydrological modeling: 1. Theory. Water Resour Res 42:W03407
Krzysztofowicz R (1999) Bayesian theory of probabilistic forecasting via deterministic hydrologic model. Water Resour Res 35(9):2739–2750
Li B, Yu Z, Liang Z, Acharya K (2014a) Hydrologic response of a high altitude glacierized basin in the central Tibetan Plateau. Glob Planet Chang 118:69–84
Li B, Yu Z, Liang Z, Song K, Li H, Wang Y, Zhang W, Acharya K (2014b) Effects of climate variations and human activities on runoff in the Zoige alpine wetland in the eastern edge of the Tibetan Plateau. J Hydrol Eng 19(5):1026–1035. doi:10.1061/(ASCE)HE.1943-5584.0000868
Li B, Liang Z, He Y, Hu L, Zhao W, Acharya K (2016a) Comparison of parameter uncertainty analysis techniques for a TOPMODEL application. Stoch Env Res Risk Assess. doi:10.1007/s00477-016-1319-2
Li B, Liang Z, Zhang J, Chen X, Jiang X, Wang J, Hu Y (2016b) Risk analysis of reservoir flood routing calculation based on inflow forecast uncertainty. Water 8:486. doi:10.3390/w8110486
Liang Z, Chang W, Li B (2012a) Bayesian flood frequency analysis in the light of model and parameter uncertainties. Stoch Env Res Risk Assess 26(5):721–730
Liang Z, Wang J, Li B, Yu Z (2012b) A statistically based runoff-yield model coupling infiltration excess and saturation excess mechanisms. Hydrol Process 26(19):2856–2865
Madigan D, Raftery AE, Volinsky C, Hoeting J (1996) Bayesian model averaging. In: Proceedings of the AAAI workshop on integrating multiple learned models. AAAI Press, Portland, pp 77–83
Moradkhani H, DeChant CM, Sorooshian S (2012) Evolution of ensemble data assimilation for uncertainty quantification using the particle filter-Markov chain Monte Carlo method. Water Resour Res 48:W12520. doi:10.1029/2012WR012144
Shi P, Wu M, Qu S, Jiang P, Qiao X, Chen X, Zhou M, Zhang Z (2015) Spatial distribution and temporal trends in precipitation concentration indices for the Southwest China. Water Resour Manag 29(11):3941–3955
Si W, Bao W, Jiang P, Zhao L, Qu S (2015) A semi-physical sediment yield model for estimation of suspended sediment in loess region. Int J Sedim Res. doi:10.1016/j.ijsrc.2015.10.002
Smith AFM, Robert GO (1993) Bayesian computation via the Gibbs sampler and related Markov chain Monte Carlo methods. J R Stat Soc Ser B 55:3–23
Vrugt JA, Gupta HV, Bouten W, Sorooshian S (2003) A Shuffled Complex Evolution Metropolis algorithm for optimization and uncertainty assessment of hydrologic model parameters. Water Resour Res 39(8):1201
Vrugt JA, ter Braak CJF, Gupta HV, Robinson BA (2009) Equifinality of formal (DREAM) and informal (GLUE) Bayesian approaches in hydrologic modeling? Stoch Env Res Risk Assess 23(7):1011–1026
Wang C, Duan Q, Tong CH, Di Z, Gong W (2016) A GUI platform for uncertainty quantification of complex dynamical models. Environ Model Softw 76:1–12
Yu Z, Jiang P, Gautam MR, Zhang Y, Acharya K (2015) Changes of seasonal storm properties in California and Nevada from an ensemble of climate projections. J Geophys Res Atmos 120(7):2676–2688
Zhao RJ (1977) Flood forecasting method for humid regions of China. East China College of Hydraulic Engineering, Nanjing
Zhao RJ (1992) The Xinanjiang model applied in China. J Hydrol 135:371–381
Acknowledgements
This work was supported by the National Key Research and Development Program approved by Ministry of Science and Technology of China (2016YFA0601504, 2016YFC0402706), National Natural Science Foundation of China (51509067), China Postdoctoral Science Foundation (2015M580450), Fundamental Research Funds for the Central Universities of China (2015B00114, 2016B10914), and Open Research Fund Program of State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering (2015490611).
Author information
Authors and Affiliations
Corresponding author
Additional information
B. Li and Y. He have contributed equally.
Rights and permissions
About this article
Cite this article
Li, B., He, Y. & Ren, L. Multisource hydrologic modeling uncertainty analysis using the IBUNE framework in a humid catchment. Stoch Environ Res Risk Assess 32, 37–50 (2018). https://doi.org/10.1007/s00477-017-1424-x
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00477-017-1424-x