Characteristics of the Amur Basin and Operating Regimes of the Zeya and Bureya Hydroprojects During Passage of the 2013 Flood G. G. LapinA. N. Zhirkevich Hydrotechnical Construction 05 July 2014 Pages: 75 - 84
Selecting the Type of Earthen Dam L. N. RasskazovM. V. Smirnova OriginalPaper 05 July 2014 Pages: 85 - 88
Concept for Monitoring Life Cycle of Basic Water-Power Equipment R. M. KhaziakhmetovS. V. FotinN. V. Fotina OriginalPaper 05 July 2014 Pages: 89 - 96
Possible Probabilistic Safety and Longevity Evaluations of the Metal in the Studs of the No. 2 Generating Set at the Sayano-Shushenskaya HPP V. G. Verezemskii OriginalPaper 05 July 2014 Pages: 97 - 101
General Problem of Condition and Remaining-Life Assessment of Metallic Structures in Water-Delivery Runs of Hydraulic Turbines at HPP S. M. LevinaK. I. Vasil’chenko OriginalPaper 05 July 2014 Pages: 102 - 111
Remaining Service Life of Generating Sets and Replacement of Equipment V. N. BaikovÉ. U. Nezametdinov OriginalPaper 05 July 2014 Pages: 112 - 116
Problems of Normalized and Methodological Substantiation of Evaluation of Strength and Remaining Service Life of Hydraulic Turbines A. V. SudakovE. V. Georgievskaya OriginalPaper 05 July 2014 Pages: 117 - 122
Domestic Boilers with Supercritical Steam Pressure: Status and Prospects1 A. N. TugovA. L. ShvartsV. R. Kotler Thermal Power Plants 05 July 2014 Pages: 123 - 127
Operating Characteristics of a 420-MW Combined Cycle Heat and Power Plant1,2 G. G. OlkhovskyP. A. BerezinetsV. I. Kostenko OriginalPaper 05 July 2014 Pages: 128 - 134
On the Scope of Computational-and-Experimental Evaluation of the Seismic Adequacy of NPP Equipment A. D. Emel’yanovaA. P. KaznovskyS. I. Ryasnyi OriginalPaper 05 July 2014 Pages: 135 - 139
Experience of Implementing a PGU-200 MW Two-Boiler One-Turbine Unit at the South-West CHP A. V. ChuginM. S. TsvetkovV. G. Razogreev OriginalPaper 05 July 2014 Pages: 140 - 146
Wear Resistance of Coatings Using SHS-Technology Under Electric-Spark Alloying Conditions1 A. V. BelyakovR. N. KaluginV. V. Sarantsev OriginalPaper 05 July 2014 Pages: 147 - 152
The Speed of Response of Controlled Shunt Reactors A. N. BelyaevS. V. Smolovik Power Systems and Electric Networks 05 July 2014 Pages: 153 - 156
A New Series of Turbogenerators of Low and Medium Capacity V. D. ApevalovV. N. LeshV. G. Shalaev OriginalPaper 05 July 2014 Pages: 157 - 161
The Development of a 110 kv dry-Type Transformer V. S. LarinV. P. Svetonosov OriginalPaper 05 July 2014 Pages: 162 - 166