Skip to main content
Log in

Heuristic approaches for mine planning and production scheduling

  • Papers
  • Published:
International Journal of Mining and Geological Engineering Aims and scope Submit manuscript

Summary

Traditional methods and opimization methods for mine planning and production scheduling have failed to provide easy to use tools that yield improved results. Two new approaches, each combining the best of the traditional and the optimization, are described.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Baafi, E. (1983)Application of mathematical programming models to coal quality control, Ph.D. Dissertation, University of Arizona, Tuscon.

    Google Scholar 

  • Gangwar, A. (1982) Using geostatistical ore block variances in production planning by integer programming,Proceedings, 17th Application of Computers and Operations Research in the Mineral Operations Symposium, Denver, April 19–22, pp. 443–460.

  • Garg, O. (1983) Personal communication, Hanna Mining Co., Cleveland, Ohio.

  • Gershon, M.E. (1982) A Linear Programming Approach to Mine Scheduling Optimization,Proceedings, 17th Application of Computers and Operations Research in the Mineral Operations Symposium, Denver, Colorado, April 19–22, pp. 483–493.

  • Gershon, M.E. (1983a) Mine scheduling optmization with mixed integer programming,Mining Engineering,35, 351–4.

    Google Scholar 

  • Gershon, M.E. (1983b) Optimal mine production scheduling: evaluation of large scale mathematical programming approaches.International Journal of Mining Engineering 1, 315–29.

    Google Scholar 

  • Gershon, M.E. (1987)Mining Operations Research, Chapman and Hall, London.

    Google Scholar 

  • Helgeson, W.N. and Birnie, D.P. (1986) Assembly line balancing using the ranked positional weight technique.The Journal of Industrial Engineering, Vol. XII, No. 4.

  • Hillier, F.S. and Lieberman, G.J. (1980)Introduction to Operations Research, Holden-Day, Inc., San Francisco, 829 pp.

    Google Scholar 

  • Johnson, T.B. (1969) Optimum production scheduling,Proceedings, 8th International Symposium on Computers and Operations Research, Salt Lake City, Utah, pp. 539–62.

  • Lane, K.F. (1964) Choosing the optimum cutoff grade.Quarterly of the the Colorado School of Mines,59, No. 4.

    Google Scholar 

  • Marek, J.M. and Welhener, H. E. (1985) Cutoff grade strategy — a balancing act, paper presented toSME Fall Meeting, Albuquerque, October 17–19.

  • Mathieson, G. (1982) Open pit sequencing and scheduling, paper presented toSME Fall Meeting, Honolulu, September 4–9.

  • Rose, W.L. (1985) An approach to computerized open-pit production scheduling, paper presented toSME Fall Meeting, Albuquerque, October 17–19.

  • Smith, C.E. (1978) The use of mixed integer programming in planning the depletion of an alluvial diamond deposit, presented to theOperations Research Society of South Africa, September 28–29, pp. 94–102.

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Gershon, M. Heuristic approaches for mine planning and production scheduling. International Journal of Mining and Geological Engineering 5, 1–13 (1987). https://doi.org/10.1007/BF01553529

Download citation

  • Received:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01553529

Keywords

Navigation