Summary
Traditional methods and opimization methods for mine planning and production scheduling have failed to provide easy to use tools that yield improved results. Two new approaches, each combining the best of the traditional and the optimization, are described.
Similar content being viewed by others
References
Baafi, E. (1983)Application of mathematical programming models to coal quality control, Ph.D. Dissertation, University of Arizona, Tuscon.
Gangwar, A. (1982) Using geostatistical ore block variances in production planning by integer programming,Proceedings, 17th Application of Computers and Operations Research in the Mineral Operations Symposium, Denver, April 19–22, pp. 443–460.
Garg, O. (1983) Personal communication, Hanna Mining Co., Cleveland, Ohio.
Gershon, M.E. (1982) A Linear Programming Approach to Mine Scheduling Optimization,Proceedings, 17th Application of Computers and Operations Research in the Mineral Operations Symposium, Denver, Colorado, April 19–22, pp. 483–493.
Gershon, M.E. (1983a) Mine scheduling optmization with mixed integer programming,Mining Engineering,35, 351–4.
Gershon, M.E. (1983b) Optimal mine production scheduling: evaluation of large scale mathematical programming approaches.International Journal of Mining Engineering 1, 315–29.
Gershon, M.E. (1987)Mining Operations Research, Chapman and Hall, London.
Helgeson, W.N. and Birnie, D.P. (1986) Assembly line balancing using the ranked positional weight technique.The Journal of Industrial Engineering, Vol. XII, No. 4.
Hillier, F.S. and Lieberman, G.J. (1980)Introduction to Operations Research, Holden-Day, Inc., San Francisco, 829 pp.
Johnson, T.B. (1969) Optimum production scheduling,Proceedings, 8th International Symposium on Computers and Operations Research, Salt Lake City, Utah, pp. 539–62.
Lane, K.F. (1964) Choosing the optimum cutoff grade.Quarterly of the the Colorado School of Mines,59, No. 4.
Marek, J.M. and Welhener, H. E. (1985) Cutoff grade strategy — a balancing act, paper presented toSME Fall Meeting, Albuquerque, October 17–19.
Mathieson, G. (1982) Open pit sequencing and scheduling, paper presented toSME Fall Meeting, Honolulu, September 4–9.
Rose, W.L. (1985) An approach to computerized open-pit production scheduling, paper presented toSME Fall Meeting, Albuquerque, October 17–19.
Smith, C.E. (1978) The use of mixed integer programming in planning the depletion of an alluvial diamond deposit, presented to theOperations Research Society of South Africa, September 28–29, pp. 94–102.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Gershon, M. Heuristic approaches for mine planning and production scheduling. International Journal of Mining and Geological Engineering 5, 1–13 (1987). https://doi.org/10.1007/BF01553529
Received:
Issue Date:
DOI: https://doi.org/10.1007/BF01553529