Skip to main content
Log in

A multi-period order selection problem in flexible manufacturing systems

  • Technical Note
  • Published:
Journal of the Operational Research Society

Abstract

We consider a multi-period order selection problem in flexible manufacturing systems, which is the problem of selecting orders to be produced in each period during the upcoming planning horizon with the objective of minimising earliness and tardiness costs and subcontracting costs. The earliness and tardiness costs are incurred if an order is not finished on time, while subcontracting cost is incurred if an order is not selected within the planning horizon (and must be subcontracted) due to processing time capacity or tool magazine capacity. This problem is formulated as a 0–1 integer program which can be transformed into a generalised assignment problem. To solve the problem, a heuristic algorithm is developed using a Lagrangian relaxation technique. Effectiveness of the algorithm is tested on randomly generated problems and results are reported.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Y-D Kim.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lee, DH., Kim, YD. A multi-period order selection problem in flexible manufacturing systems. J Oper Res Soc 49, 278–286 (1998). https://doi.org/10.1057/palgrave.jors.2600525

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1057/palgrave.jors.2600525

Keywords

Navigation