Introduction

A large proportion of villages in India have been connected with water bound macadam (WBM) or bituminous roads. Rural roads usually have a low volume of traffic, consisting mostly of light transport vehicles with less frequency of heavy traffic. Mostly flexible pavements with granular subbase and base having thin bituminous carpet as wearing course are adopted in rural roads, which deteriorate during monsoon seasons leading to costly maintenance every year. Maintenance of these roads is neglected because of the paucity of funds and the created road asset is in deteriorated condition. The non-availability of suitable soil and aggregates has made projects unviable and cost prohibitive. This has necessitated the exploration of other alternative pavements. The stabilization of existing local available material provides an effective solution. Wu et al.[1] constructed six full scale accelerated pavement testing tracks with cement treated base with thin white topping and after testing in laboratory concluded that, the Roller Compacted Concrete pavement structures over adequate base support would have superior load carrying capability hence thin RCC-surfaced pavement structure recommended as a pavement design alternative in low-volume pavement design. Ramachandra, [2] studied a technology demonstration project in Banglore to demonstrate the advantages of white topping by making use of the advances in construction equipment and methods and concluded that concrete roads and white topping provide a sustainable as well as cost-effective option for pavement construction. The guidelines for construction of cement concrete roads are presented by. Kadiyalie [3] which includes advantages and disadvantages of concrete roads, techno-economic aspects, properties and testing of concrete, design mixes, drainage considerations, specifications for subgrade, subbase, concrete pavement design, joints, quality control, a special technique of concrete paving, and use of fly ash in concrete roads. Skanda Kumar et al. [4] conducted performance evaluation studies to determine the functional and structural condition of a white topping overlay. Li and Vandenbossch [5] developed three dimensional finite-element model for thin white topping subjected to environmental and wheel loads and concluded that the maximum tensile stress is induced in the wheel path and at the bottom of the PCC overlay, which results in a longitudinal crack. S K Bagui [6] developed design curves to estimate thickness of soil–cement base and that of the soil–lime subbase for different traffic and different values of modulus of soil–cement and soil–lime mix. Kumar et al. [7] provides a cost-effective solution to problematic clayey soils by adding jute fibres. Erdawaty et al. [8] presented that the addition of asbuton with waterglass could increase soil’s load capacity and reduce the settlement of soft soils. The design charts for flexible pavements using cement treated base are published in IRC 37-2018 [9]. Guidelines for The design of plain jointed rigid pavements for highways are published in IRC 58-2015 [10], and guidelines for design and construction of cement concrete pavements for low volume roads are published in IRC SP 62-2014 [11]. Harrington et.al [12] provides a guide for evaluating existing pavements to determine if they are good candidates for concrete overlays, selecting the appropriate overlay system for specific pavement conditions, and managing concrete overlay construction work zones under traffic. Guidelines for conventional and Thin White Topping are published by IRC 76-2015 [13]. The design charts for Thin White Topping for rural roads are not available. The goal of present research is to design and develop methodology for construction of Thin White Topping for rural roads. The development of these charts can be useful for Field Engineers. Thin White Topping design charts with variable thickness of cement treated base and different subgrade CBR are developed for rural roads.

Cement treated base with cold in place recycling technique

Quality road aggregates have become rare and costly in many places in India due to the massive construction activities required for the development of new infrastructure facilities. It is a need to look for ways of improving lower quality materials that are readily available for use in roadway construction. Cement/ lime treatment has become an accepted method for increasing the strength and durability of soils and marginal aggregates. Soil cement is a highly compacted mixture of soil/aggregate, cement, and water. The advantages of the soil–cement mixture are great strength and durability combined with low first cost.

Advantages of Cement stabilization are—

  • Cement is easily available

  • Cost is relatively low

  • Highly durable

  • Weather resistant and strong

  • Reduces swelling characteristics of the soil

Many existing rural roads in India are unpaved low volume roads. Heavy rainfall and floods affect almost all these roads frequently. The roads are severely damaged due to floods, currents, and wave action. This situation requires the maintenance of these roads frequently. These adverse effects together with inadequate compaction significantly impair the durability of these roads. The ultimate effect is comparatively low subgrade strength and eventually higher pavement thickness if paved roads are to be constructed. Based on this treatment of locally available materials has become necessary for satisfactory and economic construction of roads in these regions. Cement stabilized bases or lime stabilized sub-bases may be provided for the construction of rural roads for low volume light traffic.

An increasing emphasis has been placed on the use of stabilized pavement materials in recent years. Using stabilizing agents, low-quality materials can be economically upgraded to the extent that these may be effectively utilized in the pavement. Stabilized pavement materials are generally used in the pavement structure as base courses and sub-bases. In a layered system of elastic materials, where the overlying layers have higher moduli of elasticity than underlying layers, tensile stresses are developed at the interfaces between the layered materials. This layered system analysis is commonly presumed to apply to a pavement where stiffer materials are used in the upper layers. Since many stabilized materials are relatively weak in tension, any type of rational design procedure must take their tensile strength into account.

The key machinery required for the CIPR technique is—Streau Master (Automatic Cement Spreader), recycler, pad foot roller, grader, etc.

Field trial stretch

Two roads having different types of traffic, geography and existing soil conditions have been selected from Pune district in Maharashtra State under the Research and Development Scheme of Mukhya Mantri Gram Sadak Yojana.

  1. (1)

    Sanaswadi to Dhanore Road Taluka Shirur District Pune

  2. (2)

    Pimpre to Ozare Road Taluka Indapur District Pune

Preliminary data

Preliminary data like subgrade soil, surface condition, carriageway width, crust thickness, rainfall and drainage condition have been collected. The preliminary data of the two road sites are as tabulated below (Table 1).

Table 1 Preliminary data of two road

Laboratory tests are conducted on subgrade soil for classification of soil, proctor density, and CBR. Unconfined Compressive Strength (UCS) is strength indicator of cement treated base (CTB). It is conducted on existing WBM material with 4% cement content. According to IRC: 37-2018 [9] 7 days UCS of cement stabilized base should be minimum 4.5 to 7 MPa. The UCS test results fit in this limit, specified by the Indian Road Congress (IRC). The laboratory test results are given in Table 2.

Table 2 Subgrade soil properties and UCS of WBM with 4% cement

Pavement design

The Thin White Topping (TWT) Pavements are designed as per IRC SP 62-2014 [11].

  1. (A)

    Name of Road: Sanaswadi Dhanore Road Tal. Shirur Dist. Pune

Initial design traffic (A)

283 CVPD

Grade of concrete

M30

Design life (n)

20 years

Design flexural strength = 90 days strength considered ff = 1.1 × 0.7 × √fck

4.22 MPa

Traffic growth rate (r)

5%

Poisson’s ratio of concrete

0.15

Reliability

60%

Coefficient of thermal expansion (α)

10 × 10 −6 per °C

% Cracking at the end of design life

40%

Trial Concrete Thickness = 

200 mm with CTB 200 mm

Fatigue check criteria for a vehicleexceeding 50 kN Wheel load

10%

Transverse Joint spacing (L)

2.00 m

Wheel load for a single axle with dual wheel

50 kN

Temperature Zone

III (Maharashtra)

Spacing of Wheel

310 mm

  

Tyre pressure (p)

0.80 MPa

  

A typical cross section of rigid pavement is shown in Fig. 1.

Fig. 1
figure 1

Typical cross section of rigid pavement

Edge Stress using Westergaard equation

σe = 2.16 MPa

Temperature stress (σte) is calculated by equation (1)

$$\sigma_{te} = \frac{0.67 \times C \times \alpha \times \Delta T \times E}{2} - \frac{E \times \alpha \times \Delta T}{{3 \times 3.91}}$$
(1)

C = correction factor based on L/l = 0.34

l = radius of relative stiffness.

α =: coefficient of thermal expansion

ΔT=: temperature differential °C

E = Modulus of Elasticity of concrete in MPa

σte = 0.16 MPa

Combined stress (σ) = wheel load stress + temperature stress

σ = 2.16 + 0.16 = 2.32 MPa < 4.22 MPa

Check for Fatigue criteria with 60% reliability as given by Eq. (2)

$$Log_{10} N_{f} = \frac{{SR^{ - 2.222} }}{0.523}$$
(2)

Nf- = Fatigue life with combined wheel load + temperature stresses.

SR = Sress Ratio = combined flexural stress/flexural strength.

SR = 0.56.

Allowable repetitions given by Eq. (2) Nf = 15,129,009.

For rural roads fatigue criteria checked for 10% of CVPD over design life.

Expected repetitions (N) = 10% of Total traffic over design life = 10% of \(\frac{{A \times \left( {1 + r} \right)^{n} - 1}}{r}\).

N = 362,072 < Nf.

As the cumulative fatigue damage factor (N/Nf) is less than 1; hence the design is safe.

  1. (B)

    Name of Road:—Pimpre Ozare Road Tal. Indapur Dist. Pune

  • Initial traffic (A): 102 CVPD, Design thickness of M30 grade TWT: 150 mm with CTB 200 mm

  • Subgrade CBR: 8%

  • Modulus of subgrade reaction for subgrade CBR 8% and 200 mm CTB (k) = 237 MPa/m

  • Edge stress σe = 3.27 MPa

  • Temperature stress σte = 0.61 MPa

  • Combined stress (σ) = 3.88 MPa.

Since calculated combined stress (3.88 MPa) is less than design flexural strength (4.22 MPa), the design is safe.

Construction methodology

Cement treated base

The existing road is having a WBM/deteriorated bituminous surface. To utilize existing coarse aggregates Cold in Place Recycling (CIPR) technology has been adopted for the construction of CTB. The machinery required for CTB work is Streau Master (Automatic Cement Spreader), Recycler, Pad foot roller, and grader. The CTB thickness requirement is 200 mm, hence additional Wet Mix Macadam (WMM) material laid of required thickness. 4% Cement by weight basis is spread on the coarse aggregate surface with help of Streau Master. The width of the spreader is 2 meters. Hence, cement is spread in half lane width in one go. Recycling of WBM/WMM material is done with the help of a Recycler. Recycler can recycle material up to 500 mm depth. For the trial stretch, 200 mm thick CTB is required; accordingly, the depth of recycling is adjusted, so that compacted 200 mm thick CTB is obtained. (Fig. 2) Water is added as per optimum moisture content (OMC) requirements at the time of recycling. After recycling the surface is rolled with a pad foot roller to achieve the required compaction. The surface is graded to the required profile and rolled with the help of a smooth wheeled roller. Curing of CTB is done for 7 days before laying of wearing course.

Fig. 2
figure 2

Recycling of base course with Recycler

Wearing course

Channels of required sizes are placed on the outer edge side of the carriageway. M30 grade Pavement Quality Concrete (PQC) of required thickness as per design has been provided on CTB (Fig. 3). A polythene sheet of 125-micron thickness has been laid on CTB before laying of PQC. Concrete is properly compacted with the help of needle vibrators. The finished surface of the concrete is broomed with the help of a wire broomer to obtain texturing of 1.5 mm depth (Fig. 4). The transverse contraction joints at the spacing 2 meter center to center and 3 to 5 mm width sawed to the depth 1/3 of the thickness of TWT within 24 hours after laying of TWT. The joints are filled with a sealant material (Fig. 5). The curing of concrete is done for 14 days by ponding/placing wet gunny (jute) bags. Light vehicles are allowed after 14 days. Heavy vehicles are allowed after 28 days.

Fig. 3
figure 3

Laying of PQC

Fig. 4
figure 4

Texturing of concrete

Fig. 5
figure 5

Joint cutting and filling with sealant

Problems during construction

  1. (1)

    During constructing the CTB roads, it is necessary to divert traffic to alternative nearest road otherwise surface profile of the freshly constructed CTB layer will get disturbed.

  2. (2)

    A set of machinery is required for construction CTB using the CIPR technique, hence it becomes uneconomical to construct smaller stretches.

  3. (3)

    The construction of the road should be in a continuous stretch; otherwise indirect expenses could be increased.

Performance evaluation

Pavement performance evaluation includes a range of qualitative and quantitative measurements, intended to capture the structural and functional condition of pavements [14]. The information collected provides a ‘‘report card’’ of pavement condition at a particular point of time. Normally the collected pavement evaluation information is grouped into three broad categories, namely:

(A) Serviceability (B) Structural capacity (C) Surface distress

Serviceability

The pavements are built for serving the traffic which represents serviceability. This principle has motivated the use of a rating scale for pavement serviceability which ranges from 0 to 5. In which 0 signifies very poor and 5 signifies very good rating. Serviceability of pavement is observed with roughness index. The roughness index test has been carried out on two constructed roads using axle mounted bump integrator.

Structural capacity

The capability of pavement to handle the traffic loads anticipated over its life is known as structural capacity. There is a variety of commercially available devices for measuring in-situ pavement deflections, referred to as deflectometer. Deflectometer applies a known load to the surface and uses geophones arranged to yield a ‘‘bowl’’ of deflection measurements. These devices provide information not only on the structural capacity of pavement sections but also on the structural properties of their layers and the subgrade. The latter is done through back-calculation. Falling Weight Deflectometer (FWD) is used to assess the structural capacity of pavement [4] (Fig. 6). Response of pavement to falling weight is recorded in terms of deflection and the structural capacity of pavement is worked out through back-calculations. Program KUAB PVD software module is used to calculate moduli and strain analysis with lifetime for required strength from respective input data. In-built calculations include calculations of modulus of elasticity for the layers in a pavement, given the values for each layer thickness and Poisson’s ratio. It uses an iterative procedure, where theoretical deflection values in a mathematical model are compared to the measured data, and the program adjusts the layer modulus until no further improvement is required. The program then calculates the strains in the layers and works out which layer will fail first according to the strain criteria and predicts balance life. In situ strength of concrete pavement is assessed with the nondestructive testing method using a rebound hammer (Fig. 7).

Fig. 6
figure 6

FWD test

Fig. 7
figure 7

Rebound hammer test

Surface distress

This component of performance evaluation involves the collection of data related to the condition of the pavement surface. Distresses are defined as the manifestations of construction defects, as well as the damaging effects due to traffic, the environment, and their interactions. They encompass a broad variety of cracks and surface distortions. Data are typically collected manually through condition surveys. The variety of distresses encountered in concrete pavements is grouped into three main categories: cracking, surface defects, and joint deficiencies. Joint deficiencies apply to jointed concrete pavements only.

(a) Cracking: Cracking appears in various forms that allow identification of its causes. Some are fatigue-related, caused by the accumulation of fatigue damage from repetitive vehicle axles, such as corner cracks. Other cracks, either longitudinal or transverse, can be caused by traffic, the environment, or poor construction. The combination of slab warping under thermal gradients and load may result in transverse cracks. Longitudinal and transverse crack severity is quantified as:

  1. (i)

    Low: mean crack opening smaller than 3 mm.

  2. (ii)

    Moderate: mean crack opening between 3 and 6 mm.

  3. (iii)

    High: mean crack opening larger than 6 mm.

(b) Surface Defects Map cracking consists of interconnected cracks that extend only into the upper surface of the slab. It may be caused by poor construction. Spalling is the result of the dislodgement of surface blocks created by map cracking.

(c) Joint Deficiencies: Seals of transverse/longitudinal joints can be damaged from a variety of causes, (e.g., splitting or debonding due to age hardening) and result in moisture and foreign object accumulation into the joint. Spalling is the breaking, chipping of slab edges within 0.6 m of transverse/longitudinal joints, and it is caused by either lack of lateral support along a joint edge or by joints that do not allow slab expansion due to the presence of foreign objects. Performance evaluation of two constructed field stretches is done based on the above parameter (Table 3).

Table 3 Performance evaluation of rigid pavement

Design charts

The Thin White Topping design charts are prepared for traffic less than 50 CVPD, 51 to 150.

CVPD, and less 450 CVPD with variable cement treated base thickness for different subgrade CBR values.

The factors governing TWT pavement design are;

Wheel load

Heavy vehicles are not expected frequently on rural roads. The maximum legal load limit on a single axle with dual wheels in India being 100 kN, the recommended design load on the dual wheel is 50 kN having a spacing of the wheels as 310 mm center to center.

Tyre pressure

The tyre pressure is taken as 0.80 MPa for a truck carrying a dual wheel load of 50 kN. The effect of tyre pressure on the wheel load stresses for the practical thickness of pavement is not significant.

Design period and traffic growth rate

Concrete pavement for rural roads is designed for 20 years life. A traffic growth rate of 5% per year has been considered over the design period.

Subgrade strength

The strength of the subgrade is expressed in terms of the modulus of subgrade reaction (k), which is determined by carrying out a plate load test. Since subgrade strength is affected by the moisture content, it is desirable to determine it soon after the monsoon. Stresses in concrete pavement are not very sensitive to minor variation in k values and hence its value for a homogeneous soil subgrade may be obtained from its soaked CBR value. The minimum CBR of the subgrade shall be 4%. The modulus of subgrade reaction for different subgrade CBR is given in Table 4.

Table 4 Modulus of subgrade reaction(k) for different values of subgrade CBR

Cement treated base (CTB)

The CTB material shall have a minimum unconfined compressive strength (UCS) of 4.5 to 7 MPa as per IRC: SP:89 [15] in 7/28 days curing. The strength of cementitious layers keeps on rising with time and an elastic modulus of 5000 MPa can be considered for analysis of pavements with CTB layers having 7/28-day unconfined compression strength values ranging between 4.5 and 7 MPa. The conventional cement treated layer should attain the above strength in 7 days, whereas lime and lime fly ash stabilized granular materials and soils should achieve the strength in 28 days since the strength gain rate is slow in such materials. Curing of cemented bases shall be done for a minimum period of seven days before the commencement of the construction of the next upper layer for achieving the required strength. Poisson’s ratio value of CTB material can be taken as 0.25. While preparing design charts for TWT the thickness of CTB varying from 100 to 300 mm has been considered. The design of rigid pavement is based on modulus of subgrade reaction (k). Due to the provision of CTB over subgrade, the composite k value of pavement is improved and it is considered in the design, based on subgrade CBR and CTB thickness. The composite k value is given in Table 5. The relation between composite k value and CTB thickness for different subgrade CBR(%) is shown in Fig. 8.

Table 5 Composite modulus of subgrade reaction(k) in MPa/m for different subgrade CBR and CTB thickness
Fig. 8
figure 8

Composite k value in MPa/m for different CBR(%) and CTB Thickness

Concrete strength

Since concrete pavements fail due to bending stresses, their design must be based on flexural strength of concrete. The following relationship is used to determine flexural strength.

$$f_{f} = \, 0.7\surd \, f_{ck}$$
(3)

where

ff = flexural strength in MPa.

fck = characteristic compressive cube strength in MPa.

For low volume roads, it is suggested that the 90 days strength may be used for design since concrete keeps on gaining strength with time. The 90-days flexural strength may be taken as 1.10 times the 28-day flexural strength as per IRC SP 62–2014. Minimum M30 grade concrete should be used for pavement construction of rural roads,

Modulus of elasticity and Poisson’s Ratio

The modulus of Elasticity E of concrete and Poisson’s ratio is taken as 30,000 MPa and 0.15, respectively.

Coefficient of thermal expansion

The coefficient of thermal expansion of concrete α is taken as;

α = 10 × 10−6 per °C.

Fatigue behaviour of concrete pavement

For most rural roads, fatigue behaviour is not so important because of a low volume of commercial vehicles. For rural road fatigue criteria with 60% reliability is used considering 40% cracking of slab at the end of design life.

$${\text{Log}}_{10} N_{f} = \frac{{{\text{SR}}^{ - 2.222} }}{0.523}$$
(4)

Nf = Fatigue life of a pavement subjected to stresses caused by the combined effect of wheel load of 50 kN and temperature gradient.

$${\text{SR}} = {\text{Stress}}\;{\text{Ratio}} = \frac{{{\text{Flexural}}\;{\text{stress}}\;{\text{due}}\;{\text{to}}\;{\text{wheel}}\;{\text{load}}\;{\text{and}}\;{\text{temperature}}}}{{{\text{Flexural}}\;{\text{strength}}}}$$

Critical stress condition

Concrete pavements are subjected to stresses due to a variety of factors and the conditions which induce the highest stress in the pavement should be considered for analysis. The factors commonly considered for the design of pavement thickness are traffic loads and temperature gradients. The effects of moisture changes and shrinkage are of a smaller magnitude, and they are neglected in thickness design. The effect of the temperature gradient is very less at the corner, while it is much higher at the edge. Concrete pavements undergo daily cyclic changes of temperature differentials, the top being hotter than the bottom during the daytime and the opposite is the case during the nighttime. The consequent tendency of pavement slabs to curl upwards during the daytime and downwards during the nighttime and restraint offered to curling by the self-weight of pavement induces stresses in the pavement referred to commonly curling stresses. These stresses are flexural, being tensile at the bottom during the daytime and at the top during the nighttime. Corners have very little restraint and temperature stresses in the corner region are negligible. Hence, edge stress is considered critical for the design of pavement thickness. For Thin White Topping with shorter joint spacing, top-down cracking will not take place as both wheels of the vehicle are not placed on the same panel. The maximum tensile stresses in the edge region will be critical during the daytime.

A. Wheel load stress at the edge is calculated using the Westergaard Eq. (5).

$$\sigma_{e} = \frac{{3\left( {1 + \mu } \right)P}}{{\pi \left( {3 + \mu } \right)h^{2} }}\left[ {\ln \left( {\frac{{Eh^{3} }}{{100ka^{4} }}} \right) + 1.84 - \frac{4\mu }{3} + \frac{1 - \mu }{2} + \frac{{1.18\left( {1 + 2\mu } \right)a}}{l}} \right]$$
(5)

σe: edge stress in MPa.

h: Pavement thickness in mm.

k: Modulus of subgrade reaction MPa/m.

P: Single Wheel Load, N

μ: Poisson’s ratio for concrete.

E: Modulus of elasticity of concrete in MPa.

l: radius of relative stiffness and calculated by Eq. (6),

$$l = \left( {\frac{{Eh^{3} }}{{12(1 - \mu^{2} )k}}} \right)^{{{\raise0.7ex\hbox{$1$} \!\mathord{\left/ {\vphantom {1 4}}\right.\kern-\nulldelimiterspace} \!\lower0.7ex\hbox{$4$}}}}$$
(6)

a: radius of the equivalent circular area and it is calculated by Eqs. (7) and (8),

$$a = \sqrt {\frac{P}{p\pi }} \;\;{\text{for}}\;{\text{single}}\;{\text{Wheel}}$$
(7)
$$a = \sqrt {\frac{{0.8521P_{d} }}{p\pi } + \frac{{S_{d} }}{\pi }\left( {\frac{{P_{d} }}{0.5227p}} \right)^{{{\raise0.7ex\hbox{$1$} \!\mathord{\left/ {\vphantom {1 2}}\right.\kern-\nulldelimiterspace} \!\lower0.7ex\hbox{$2$}}}} } \;\;{\text{for}}\;{\text{dual}}\;{\text{Wheel}}$$
(8)

Sd: Spacing between the center of duel wheel.

Pd: Load on one wheel.

P—Tyre pressure.

Temperature stress ( σ te )

Bradbury’s equation is used for the computation of temperature stress. The temperature gradient across the depth is usually nonlinear. The compressive stress due to bi-linear temperature variation is subtracted. Temperature stress is calculated by equation (9),

$$\sigma_{te} = \frac{0.67 \times C \times \alpha \times \Delta T \times E}{2} - \frac{E \times \alpha \times \Delta T}{{3 \times 3.91}}$$
(9)

σte: temperature stress in MPa.

C: Correction factor.

α: coefficient of thermal expansion.

ΔT: temperature differential °C.

Temperature differentials in different zones in India are taken as recommended by Central Road Research Institute Table 4.1 of IRC SP 62-2014 [11]. For Thin white topping, the concrete thickness is less than 200 mm hence temperature differential values in zone II, IV, V, VI are nearly the same and hence clubbed in single group.

Joint spacing

The Joint spacing for concrete pavement is recommended 12 to 15 times the thickness of concrete. From the construction point of view, joint spacing of 1.5-m, 2.0 m, and 3.00 m has been considered in the design.

Pavement design charts

Pavement design charts are prepared considering traffic, Subgrade CBR, CTB thickness, grade of concrete, and transverse joint spacing.

  1. (a)

    Traffic less than 50 CVPD:

    For traffic, less than 50 CVPD only wheel load stresses for a load of 50 kN on dual wheel need be considered for thickness estimation since there is a low probability of maximum wheel load and highest temperature differential between the top and bottom of the rigid pavement occurring at the same time. The TWT thickness design chart for M30, M35, and M40 concrete grades is given in Table 6. As temperature stresses are not considered in the design, spacing of joint and temperature zone does not have effect on thickness of TWT. Preferably joint spacing should be provided 12 to 15 times the thickness of TWT. For a particular subgrade CBR value, the TWT thickness requirement decreases with increase in CTB thickness up to certain extent. Also for a particular CTB thickness, the TWT thickness requirement decreases with increase in subgrade CBR value. Effect of CTB thickness on TWT thickness for concrete grade M30, M35 and M40 is shown in Figures 9, 10, 11.

  2. (b)

    Traffic 51 to 150 CVPD:

    For traffic higher than 50 and less than 150 CVPD, the thickness evaluation should be done based on total stresses resulting from wheel load of 50 kN and temperature differential. The TWT thickness design charts for M30, M35, and M40 concrete grades are given in Tables 7, 8, 9. As temperature stresses are considered in the design, joint spacing and temperature zone has effect on thickness requirement of TWT. For a particular subgrade CBR value and CTB thickness, the TWT thickness requirement increases with increase in joint spacing. TWT thickness requirement for zone III is higher and lower for zone I. For lower joint spacing effect of zone is insignificant. The effect of CTB thickness on TWT thickness for different temperature zones and joint spacing for M30 grade concrete and different subgrade CBR is shown in Figures 12, 13, 14, 15, 16, 17, 18.

  3. (c)

    Traffic less than 450 CVPD:

Table 6 Thin white topping thickness for traffic less than 50 CVPD and concrete grade M30/M35/M40
Fig. 9
figure 9

Thin White Topping thickness for traffic < 50 CVPD and Concrete Grade M30

Fig. 10
figure 10

Thin White Topping thickness for traffic < 50 CVPD and Concrete Grade M35

Fig. 11
figure 11

Thin White Topping thickness for traffic < 50 CVPD and Concrete Grade M40

Table 7 Thin white topping thickness for traffic 51 to 150 CVPD and concrete grade M30
Table 8 Thin white topping thickness for traffic 51 to 150 CVPD and concrete grade M35
Table 9 Thin white topping thickness for traffic 51 to 150 CVPD and concrete grade M40
Fig. 12
figure 12

Thin White Topping thickness for traffic 51 to 150 CVPD, Concrete Grade M30 and Subgrade CBR 4%

Fig. 13
figure 13

Thin White Topping thickness for traffic 51 to 150 CVPD, Concrete Grade M30, and Subgrade CBR 6%

Fig. 14
figure 14

Thin White Topping thickness for traffic 51 to 150 CVPD, Concrete Grade M30 and Subgrade CBR 8%

Fig. 15
figure 15

Thin White Topping thickness for traffic 51 to 150 CVPD, Concrete Grade M30 and Subgrade CBR 10%

Fig. 16
figure 16

Thin White Topping thickness for traffic 51 to 150 CVPD, Concrete Grade M30 and Subgrade CBR 12%

Fig. 17
figure 17

Thin White Topping thickness for traffic 51 to 150 CVPD, Concrete Grade M30 and Sibgrade CBR 16%

Fig. 18
figure 18

Thin White Topping thickness for traffic 51 to 150 CVPD, Concrete Grade M30 and Subgrade CBR 20%

For traffic exceeding 150 CVPD, fatigue can be a real problem, and thickness evaluation based on fatigue fracture with 60% reliability should be considered. Pavement thickness is designed considering combined stresses due to wheel load edge stress for the dual wheel of 50 kN and temperature gradient. Also, concrete pavement is checked for fatigue criteria. Assuming 10% of total traffic is having an axle load of more than 100 kN, the expected number of vehicles is computed over the design period. The allowable number of repetitions is computed considering 60% reliability from the fatigue equation. Cumulative fatigue damage is computed and it should be less than 1. The TWT thickness charts for concrete grades M30, M35, and M40 are given in Tables 10,11,12. The TWT thickness requirement increases with increase in joint spacing. The effect of zone is insignificant keeping all other parameters constant. TWT thickness requirement decreases with increase in CTB thickness for 1.5 meter joint spacing The TWT thickness requirement decreses with increase in subgrade CBR value upto certain extent for same CTB thickness and joint spacing. The effect of CTB thickness on TWT thickness for different temperature zones and joint spacing for M30 grade concrete and different subgrade CBR is shown in Figures 19, 20, 21, 22, 23, 24, 25.

Table 10 Thin white topping thickness for traffic < 450 CVPD and concrete grade M30
Table 11 Thin white topping thickness for traffic < 450 CVPD and concrete grade M35
Table 12 Thin white topping thickness for traffic < 450 CVPD and concrete grade M40
Fig. 19
figure 19

Thin White Topping thickness for traffic < 450 CVPD, Concrete Grade M30 and Subgrade CBR 4%

Fig. 20
figure 20

Thin White Topping thickness for traffic < 450 CVPD, Concrete Grade M30 and Subgrade CBR 6%

Fig. 21
figure 21

Thin White Topping thickness for traffic < 450 CVPD, Concrete Grade M30 and Subgrade CBR 8%

Fig. 22
figure 22

Thin White Topping thickness for traffic < 450 CVPD, Concrete Grade M30 and Subgrade CBR 10%

Fig. 23
figure 23

Thin White Topping thickness for traffic < 450 CVPD, Concrete Grade M30 and Subgrade CBR 12%

Fig. 24
figure 24

Thin White Topping thickness for traffic < 450 CVPD, Concrete Grade M30 and Subgrade CBR 16%

Fig. 25
figure 25

Thin White Topping thickness for traffic < 450 CVPD, Concrete Grade M30 and Subgrade CBR 20%

Conclusions

The design charts for Thin White Topping with variable thickness of cement treated base and different subgrade CBR are prepared for rural roads. With Cold In Place Recycling technique, existing local material can be utilized and the strength of subgrade and subbase shall be improved with cement stabilization. From field experiments the performance evaluation rating after two years of construction is good for pavement constructed with CTB using CIPR technique and Thin White Topping. Surface cracking, potholes, rutting, or any defects are not observed. Thin White Topping thickness design charts of M30, M35 and M40 are developed for varying thickness of cement treated base and different subgrade CBR for rural roads. From the development of design charts following are the significant observations,

  • Composite modulus of subgrade reaction (k) value increases with an increase in thickness of CTB.

  • The optimum thickness of TWT can be obtained from Design Chart and the economy in the Pavement design can be achieved.

  • For low CBR Subgrade value, increase in CTB thickness can reduce TWT Thickness only up to the certain extent

  • For an increase in Joint spacing the required TWT thickness increases.

  • For Joint spacing of 1.5 m, TWT thickness is the same for all zones.

  • For Joint spacing 2.0 m and 2.5-m, TWT thickness requirement is higher for Zone III and lower for Zone I.

The Thin White Topping pavement structures over adequate base support would have superior load carrying capability hence Thin White Topping pavement structure recommended as a pavement design alternative in low-volume rural roads. The construction of rural roads with CTB using the CIPR technique is an effective and environmentally friendly solution.