Skip to main content
Log in

A design study on the CSNS LEBT pre-chopper

  • Research Paper
  • Special Issue on the First Chinese Particle Accelerator Conference (2010)
  • Published:
Science China Physics, Mechanics and Astronomy Aims and scope Submit manuscript

Abstract

The China Spallation Neutron Source (CSNS) front end incorporates a pre-chopper in the Low Energy Beam Transport line (LEBT) that will remove a 530 ns section of beam at approximately 1 MHz rate, which is the RF frequency of the ring at injection. It’s one of the most critical devices for properly controlling the injecting beam loss. Physical designing of the pre-chopper is carried out, and the RFQ itself is used as the beam dump of the chopper system. In order to examine the reliability of the pre-chopper design, the beam study of a similar chopper system is successfully performed. The results of physical design and experiments are presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Fang S X, Fu S N, Qin Q, et al. Physics parameters and design study for the Beijing Spallation Neutron Source. J Korean Phys Soc, 2006, 48(4): 697–702

    Google Scholar 

  2. Wei J, Fang S X, Cao J S, et al. China Spallation Neutron Source accelerator design iteration and R&D status. J Korean Phys, 2007, 50(5): 1373–1377

    Google Scholar 

  3. Staples J W, Ayers J J, Cheng D W, et al. The SNS four-phase LEBT chopper. Proc PAC, 1999, 1961–1963

  4. Akira U, Yasuhiro K, Kiyoshi I. Accelerator Technical Design Report for J-PARC. Chapter 3.1.2.1, 2003

  5. Keller R, Thomae R W, Stockli M P, et al. Status of the SNS H ion source and low-energy beam transport system status of SNS. AIP Conf Proc, 2002, 642: 276–278

    Article  ADS  Google Scholar 

  6. Caruso A, Longhitano A, Rifuggiato D, et al. Preliminary design of the slow chopper for the SPIRAL 2 project. Proc LINAC08, 2008, 891–893

  7. Liu H C, Ouyang H F, Peng J, et al. Design and experiment results of the LEBT pre-chopper for CSNS. Nucl Instrum Methods A, 2011, 654(1): 2–7

    Article  ADS  Google Scholar 

  8. Ouyang H F, Zhang H S, Gong K Y, et al. Study on the pre-chopper in CSNS LEBT. Chin Phys C, 2010, 34(8): 1122–1126

    Article  ADS  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to HuaChang Liu.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Liu, H., Ouyang, H., Peng, J. et al. A design study on the CSNS LEBT pre-chopper. Sci. China Phys. Mech. Astron. 54 (Suppl 2), 231–235 (2011). https://doi.org/10.1007/s11433-011-4565-9

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11433-011-4565-9

Keywords

Navigation