This paper addresses the two-stage assembly flow-shop problem (TSAFP) with multiple non-identical assembly machines in second stage with the objective function of makespan minimization. This problem is a generalization of previously proposed problems in TSAFP. Mathematical mixed-integer linear programming model of this problem is defined, and for it being NP-hard, a hybrid SA heuristic is proposed. The heuristic is proved to solve the problem in reduced time with negligible error. To validate the proposed method, a real-life example is presented and solved in which the efficiency of the proposed heuristic is shown.
Similar content being viewed by others
References
Lee CY, Cheng TCE, Lin BMT (1993) Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Manag Sci 39(5):616–625. doi:10.1287/mnsc.39.5.616
Potts CN, Sevast’janov SV, Strusevich VA, Van Wassenhove LN, Zwaneveld CM (1995) The two-stage assembly scheduling problem: complexity and approximation. J Oper Res 43(2):346–355
Allahverdi A, Al-Anzi FS (2006) A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Comput Oper Res 33:1056–1080. doi:10.1016/j.cor.2004.09.002
Lin BMT, Cheng TCE, Chou ASC (2007) Scheduling in an assembly-type production chain with batch transfer. Omega 35:143–151. doi:10.1016/j.omega.2005.04.004
Zhang Y, Zhou Z, Liu J (2010) The production scheduling problem in a multi-page invoice printing system. Comput Oper Res 37:1814–1821. doi:10.1016/j.cor.2010.01.014
Mirsanei HS, Karimi B, Jolai F (2009) Flow shop scheduling with two batch processing machines and nonidentical job sizes. Int J Adv Manuf Technol 45:553–572. doi:10.1007/s00170-009-1986-y
Oguz C, Fikret Ercan M, Edwin Cheng TC, Fung YF (2003) Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. Eur J Oper Res 149:390–403. doi:10.1016/S0377-2217(02)00766-X
Sung CS, Juhn J (2009) Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint. Int J Prod Econ 119:392–401. doi:10.1016/j.ijpe.2009.03.012
Allaoui H, Artiba A (2006) Scheduling two-stage hybrid flow shop with availability constraints. Comput Oper Res 33:1399–1419. doi:10.1016/j.cor.2004.09.034
Koulamas C, Kyparisis GJ (2001) The three-stage assembly flowshop scheduling problem. Comput Oper Res 28:689–704. doi:10.1016/S0305-0548(00)00004-6
Gupta JND, Hariri AMA, Potts CN (1997) Scheduling a two-stage hybrid flow shop with parallel machines at the first stage. Ann Oper Res 69:171–191. doi:10.1023/A:1018976827443
Gupta JND, Hennig K, Werner F (2002) Local search heuristics for two-stage flow shop problems with secondary criterion. Comput Oper Res 29:123–149. doi:10.1016/S0305-0548(00)00061-7
Torabzadeh E, Zandieh M (2010) Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop. Adv Eng Softw 41:1238–1243. doi:10.1016/j.advengsoft.2010.06.004
Al-Anzi FS, Allahverdi A (2009) Heuristics for a two-stage assembly flow shop with bicriteria of maximum lateness and makespan. Comput Oper Res 36:2682–2689. doi:10.1016/j.cor.2008.11.018
Allahverdi A, Al-Anzi FS (2007) The two-stage assembly flow shop scheduling problem with bicriteria of makespan and mean completion time. Int J Adv Manuf Technol 37:166–177. doi:10.1007/s00170-007-0950-y
Hatami S, Ebrahimnejad S, Tavakkoli-Moghaddam R, Maboudian Y (2010) Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times. Int J Adv Manuf Technol 50:1153–1164. doi:10.1007/s00170-010-2579-5
Tozkapan A, Kirca O, Chung CS (2003) A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem. Comput Oper Res 30:309–320. doi:10.1016/S0305-0548(01)00098-3
Choi HS, Lee DH (2009) Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops. Comput Ind Eng 56:113–120. doi:10.1016/j.cie.2008.04.005
Hariri AMA, Potts CN (1997) A branch and bound algorithm for the two-stage assembly scheduling problem. Eur J Oper Res 103:547–556. doi:10.1016/S0377-2217(96)00312-8
Choi HS, Kim HW, Lee DH, Yoon J, Yun CY, Chae KB (2009) Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates. Int J Adv Manuf Technol 42:963–973. doi:10.1007/s00170-008-1656-5
Neppalli VR, Chen CL, Gupta JND (1996) Genetic algorithms for the two-stage bicriteria flowshop problem. Eur J Oper Res 95(2):356–373. doi:10.1016/0377-2217(95)002
Kyparisis GJ, Koulamas C (2006) A note on makespan minimization in two-stage flexible flow shops with uniform machines. Eur J Oper Res 175:1321–1327. doi:10.1016/j.ejor.2005.06.017
He D, Babayan A, Kusiak A (2001) Scheduling manufacturing systems in an agile environment. Robot Comput Integr Manuf 17:87–97. doi:10.1016/S0736-5845(00)00041-7
Allahverdi A, Al-Anzi FS (2009) The two-stage assembly scheduling problem to minimize total completion time with setup times. Comput Oper Res 36:2740–2747. doi:10.1016/j.cor.2008.12.001
Javadian N, Mozdgir A, Gazani Koohi E, Davallo Qajar MR, Shiraqai ME (2009) Solving assembly flowshop scheduling problem with parallel machines using variable neighborhood search. Proceedings of 39th International Conference of Computers and Industrial Engineering, July 2009, University of Technology of Troyes, Paris, France. doi: 10.1109/ICCIE.2009.5223845
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Navaei, J., Ghomi, S.M.T.F., Jolai, F. et al. Two-stage flow-shop scheduling problem with non-identical second stage assembly machines. Int J Adv Manuf Technol 69, 2215–2226 (2013). https://doi.org/10.1007/s00170-013-5187-3
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-013-5187-3