Skip to main content
Log in

Determining optimal batch interval and production strategy based on available-to-promise model for order promising

  • Original Research
  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

With the intensification of market competition, rapid changes in customer demand in the era of globalization, and uncertainty in the supply chain, manufacturers are facing increasing challenges in responding to customer requests on time. Available-to-promise (ATP) is a system that provides product availability information for promising customer order requests by considering the tradeoff between customer satisfaction and supply chain efficiency. This paper proposes a mixed integer programming model based on ATP theory to obtain the optimal batch interval length and production strategy of bill of material items. The objective of the proposed model is to maximize the manufacturer’s profit. Experimental data is analyzed to investigate the impact of the batch interval length and production strategies adopted by the manufacturer on its profit. The results provide theoretical guidance and implementation methods for manufacturers to maximize profits.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7

Similar content being viewed by others

References

  • Abedi, A., & Zhu, W. (2020). An advanced order acceptance model for hybrid production strategy. Journal of Manufacturing Systems, 55, 82–93.

    Article  Google Scholar 

  • Akinc, U., & Meredith, J. (2006). Choosing the appropriate capacity for a make-to-forecast production environment using a Markov analysis approach. IIE Transactions, 38(10), 847–858.

    Article  Google Scholar 

  • Alemany, M. M. E., Ortiz, A., & Fuertes-Miquel, V. S. (2018). A decision support tool for the order promising process with product homogeneity requirements in hybrid Make-To-Stock and Make-To-Order environments. Application to a ceramic tile company. Computers & Industrial Engineering, 122, 219–234.

    Article  Google Scholar 

  • Ball, M. O., Chen, C. Y., & Zhao, Z. Y. (2004). Available to promise. In D. Simchi-Levi, D. Wu, & M. Shen (Eds.), Handbook of supply chain analysis in the eBusiness era (pp. 477–484). Kluwer Academic Publishers.

    Google Scholar 

  • Boza, A., Alemany, M. M. E., Alarcón, F., & Cuenca, L. (2014). A model-driven DSS architecture for delivery management in collaborative supply chains with lack of homogeneity in products. Production Planning & Control, 25(8), 650–661.

    Article  Google Scholar 

  • Chen, J., & Chen, C. (2013). Improvement of order promise with material constraints and finite capacity. International Journal of the Computer the Internet and Management., 15, 63–69.

    Google Scholar 

  • Chen, J., & Dong, M. (2014). Available-to-promise-based flexible order allocation in ATO supply chains. International Journal of Production Research, 52(22), 6717–6738.

    Article  Google Scholar 

  • Chen, C. Y., Zhao, Z. Y., & Ball, M. O. (2001). Quantity and due date quoting available to promise. Information Systems Frontiers, 3, 477–488.

    Article  Google Scholar 

  • Chen, C. Y., Zhao, Z. Y., & Ball, M. O. (2002). A model for batch advanced available to promise. Production and Operations Management, 11, 424–440.

    Article  Google Scholar 

  • Clay, P. (1990). Advanced available-to-Promise concept and techniques. In Annual international conference proceeding American production and inventory control (pp. 381–387).

  • Framinan, J. M., & Leisten, R. (2010). Available-to-promise (ATP) systems: A classification and framework for analysis. International Journal of Production Research, 48(11), 3079–3103.

    Article  Google Scholar 

  • Framinan, J. M., & Perez-Gonzalez, P. (2016). Available-to-promise systems in the semiconductor industry: A review of contributions and a preliminary experiment. In 2016 Winter Simulation Conference (WSC) (pp. 2652–2663).

  • Gössinger, R., & Kalkowski, S. (2015). Robust order promising with anticipated customer response. International Journal of Production Economics, 170, 529–542.

    Article  Google Scholar 

  • Jung, H. (2010). An available-to-promise model considering customer priority and variance of penalty costs. International Journal of Advanced Manufacturing Technology, 49.

  • Kilger, C., & Meyr, H. (2008). Demand Fulfilment and ATP. In H. Stadtler & C. Kilger (Eds.), Supply chain management and advanced planning: Concepts, models, software, and case studies (4th ed., pp. 181–198). Springer Publisher.

    Chapter  Google Scholar 

  • Kilger, C., & Meyr, H. (2015). Demand fulfilment and ATP. In Supply chain management and advanced planning: concepts, models, software, and case studies (pp. 177–194).

  • Köber, J., & Heinecke, G. (2012). Hybrid production strategy between make-to-order and make-to-stock–a case study at a manufacturer of agricultural machinery with volatile and seasonal demand. Procedia Cirp, 3, 453–458.

    Article  Google Scholar 

  • Koberg, E., & Longoni, A. (2019). A systematic review of sustainable supply chain management in global supply chains. Journal of Cleaner Production, 207, 1084–1098.

    Article  Google Scholar 

  • Nguyen, S. (2016). A learning and optimizing system for order acceptance and scheduling. The International Journal of Advanced Manufacturing Technology, 86(5), 2021–2036.

    Article  Google Scholar 

  • Meyr, H. (2009). Customer segmentation, allocation planning and order promising in make-to-stock production. In H. Meyr & H.-O. Günther (Eds.), Supply chain planning (pp. 117–144). Springer.

    Chapter  Google Scholar 

  • Octavia, T. (2004). New issues of ATP systems in a supply chain. Jurnal Teknik Industri, 6(2), 142–147.

    Article  Google Scholar 

  • Olhager, J. (2003). Strategic positioning of the order penetration point. International Journal of Production Economics, 85(3), 319–329.

    Article  Google Scholar 

  • Pibernik, R. (2003). A multi-product batch-available-to-promise model for make-to-stock manufacturing. In Operations Research Proceedings, 2002, 77–82.

    Google Scholar 

  • Pibernik, R. (2005). Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management. International Journal of Production Economics, 93, 239–252.

    Article  Google Scholar 

  • Qin, W., Zhuang, Z., Sun, Y., Liu, Y., & Yang, M. (2022). An available-to-promise stochastic model for order promising based on dynamic resource reservation policy. International Journal of Production Research, 1–18.

  • Rabbani, M., Monshi, M., & Rafiei, H. (2014). A new AATP model with considering supply chain lead-times and resources and scheduling of the orders in flowshop production systems: A graph-theoretic view. Applied Mathematical Modelling, 38(24), 6098–6107.

    Article  Google Scholar 

  • Rabbani, M., Sadri, S., Manavizadeh, N., & Rafiei, H. (2015). A novel bi-level hierarchy towards available-to-promise in mixed-model assembly line sequencing problems. Engineering Optimization, 47(7), 947–962.

    Article  Google Scholar 

  • Sadeghi Ahangar, S., & Rabani, M. (2022). Design a decision structure for the order promising process in hybrid MTS/MTO environments considering product substitution, a case study. Journal of Industrial and Systems Engineering, 14(2), 32–60.

    Google Scholar 

  • Sarvestani, H. K., Zadeh, A., Seyfi, M., & Rasti-Barzoki, M. (2019). Integrated order acceptance and supply chain scheduling problem with supplier selection and due date assignment. Applied Soft Computing, 75, 72–83.

    Article  Google Scholar 

  • Seitz, A., & Grunow, M. (2017). Increasing accuracy and robustness of order promises. International Journal of Production Research, 55(3), 656–670.

    Article  Google Scholar 

  • Seitz, A., Akkerman, R., & Grunow, M. (2021). A contract portfolio perspective on the role of customer order lead times in demand fulfilment processes with supply shortage. International Journal of Production Research, 60(12), 1–17.

    Google Scholar 

  • Siala, M., Ghédira, K., & Campagne, J. P. (2006). ATP Management: A collaborative approach for inventory redeployment. In International Conference on Service Systems and Service Management (pp. 261–266).

  • Soares, A. L., Azevedo, A. L., & De Sousa, J. P. (2000). Distributed planning and control systems for the virtual enterprise: Organizational requirements and development life-cycle. Journal of Intelligent Manufacturing, 11, 253–270.

    Article  Google Scholar 

  • Soares, A., Pimentel, C., & Moura, A. (2022). Production planning and scheduling with applications in the tile industry. International Journal of Operational Research, 4(1), 58–79.

    Article  Google Scholar 

  • Stadtler, H., & Kilger, C. (2000). Supply chain management and advanced planning—Concepts, models, software and case studies. Springer.

  • Tsai, K. M., & Wang, S. C. (2008). Multi-site available-to-promise modeling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturing. International Journal of Production Economics, 117(1), 174–184.

    Article  Google Scholar 

  • Xiong, M. H., Tor, S. B., Bhatnagar, R., Khoo, L. P., & Venkat, S. (2006). A DSS approach to managing customer enquiries for SMEs at the customer enquiry stage. International Journal of Production Economics, 103(1), 332–346.

    Article  Google Scholar 

  • Xu, L., & Chen, J. (2021). Real-time order allocation model by considering available-to-promise reserving, occupying and releasing mechanisms. International Journal of Production Research, 59(2), 429–443.

    Article  Google Scholar 

  • Yang, W., & Fung, R. Y. (2014). An s. International Journal of Production Research, 52(14), 4253–4266.

    Article  Google Scholar 

  • Yılmaz, P., & Çatay, B. (2006). Strategic level three-stage production distribution planning with capacity expansion. Computers & Industrial Engineering, 51(4), 609–620.

    Article  Google Scholar 

  • Zhao, Z. Y., Ball, M. O., & Kotake, M. (2005). Optimization-based available-to-promise with multi-stage resource availability. Annals of Operations Research, 135, 65–85.

    Article  Google Scholar 

Download references

Funding

This study was funded by National Science and Technology Council, Taiwan (MOST 110-2622-E-025-002-).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yu-Chung Tsao.

Ethics declarations

Conflict of interest

The author declares that he has no potential conflict of interest.

Ethical approval

This article does not contain any studies with human participants or animals performed by any of the authors.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Liao, LW., Tsao, YC. & Hung, YH. Determining optimal batch interval and production strategy based on available-to-promise model for order promising. Ann Oper Res (2023). https://doi.org/10.1007/s10479-023-05641-7

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s10479-023-05641-7

Keywords

Navigation