Abstract
For the demand of accurate delivery promise on ordering stage under MTO and MTS mixed production mode, this paper proposed a quick order promising method for iron and steel enterprise based on short-term production capacity balancing planning. By this method, we extended ATP (Available-To-Promise) concept to RATP (Resource-Available-To-Promise), and give DTP (Delivery-To-Promise) while making resource promise. A heuristic method was developed to match available resource with order demand, which guarantees the short-term production capacity balance between production processes after order promising. The actual data testing results showed that the proposed method can meet the demand of online order promising with relatively short time.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Chen ChinSheng, Mestry S, Damodarana P, Wangb Chao (2009) The capacity planning problem in make-to-order enterprises. Math Comput Model 50(9–10):1461–1473
Hosang Jung (2010) An available-to-promise model considering customer priority and variance of penalty costs. Int J Adv Manuf Technol 49:369–377
Kune-muh Tsai, Shanchi Wang (2009) Multi-site available-to-promise modeling for assemble-to-order manufacturing: an illustration on TFT-LCD manufacturing. Int J Prod Econ 117:174–184
Lu Shan (2008) Supply chain-oriented multi-stage ATP study. Intell Comput Technol Automat (ICICTA) 2:712–716
Maravelias CT, Sung C (2009) Integration of production planning and scheduling: overview, challenges and opportunities. Comput Chem Eng 33(12):1919–1930
Shuhui Sun, Yongjun Xiao, Tieke Li (2008) Solving the inventory matching problem of hot rolling strips based on the constraint satisfaction method. J Univ Sci Technol Beijing 30(6):680–684
Tao Zhang, Haigang Cheng, Yuejie Zhang (2008) A method based on MTO-MTS for the order planning of the steel plant. Syst Eng Theory Pract 11:85–89
Xiaoqing Song, Zhimin Lv, Shaohua Dong (2012) Network capacity-based algorithm for short term production capacity planning problem in steel plant. Comput Integr Manuf Syst 18(3):1839–1844
Acknowledgements
This work was supported by the National High-tech R&D Program of China under Grant No. 2013AA040704 and National Natural Science Foundation of China under Grant No. 51274043.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Lv, Z., Zhang, J., Song, X. (2015). Order Promising Method for Iron and Steel Enterprise Based on Short-Term Production Capacity Balancing Planning. In: Zhang, R., Zhang, Z., Liu, K., Zhang, J. (eds) LISS 2013. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-40660-7_22
Download citation
DOI: https://doi.org/10.1007/978-3-642-40660-7_22
Published:
Publisher Name: Springer, Berlin, Heidelberg
Online ISBN: 978-3-642-40660-7
eBook Packages: Business and EconomicsBusiness and Management (R0)