Bridge management system development for a cable-stayed bridge

  • Structural Engineering
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

The exclusive bridge management system for a special type of bridge, Seo-Hae Bridge, which is the largest cable-stayed type in this country, has been successfully developed and operated in bridge field. Bridge Management System (BMS) is generally classified into two categories based on its application: the global-purpose and exclusive type. The global-type is applied to overall bridge group in the road networks under a managing authority, while the exclusive type is for a specific single bridge. Since two types of system have different application field the system development strategy should also be different in its purpose and contents. The contents of Seo-Hae Bridge Management System (SHBMS) which is the first exclusive type system for a specific bridge is introduced in this paper.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Korea Highway Corporation (1999).A Study in BMS Development and Operation, Research Report.

  2. Korea Highway Corporation (2000).Development of Seo-Hae Bridge Management System, Technical Report.

  3. Korea Highway Corporation (2001).Construction History of Seo-Hae Bridge.

  4. Sungkon Kim (1994). “Hybrid Knowledge Based Computational Environment for Smart Structural Health Monitoring,” Ph. D. Dissertation, SUNYAB.

  5. G. Booch (1991).Object-Oriented Design: with Applications, The Benjamin/Cummings Pub. CA.

    Google Scholar 

  6. I. Bratko (1990).Prolog Programming for Artificial Intelligence, Addison-Wesley.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sungkon Kim.

Additional information

The manuscript for this paper was submitted for review on February 15, 2001.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kim, S. Bridge management system development for a cable-stayed bridge. KSCE J Civ Eng 5, 43–49 (2001). https://doi.org/10.1007/BF02830725

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02830725

Keywords

Navigation