Introduction

In the last decades, a paradigm shift took place in Germany and Europe from flood protection to flood risk management (Hartmann and Albrecht 2014; Thomas and Knüppe 2016). Official policy treats both technical measures and Natural Water Retention Measures (NWRMs) as equally important for flood risk management (Dworak and Görlach 2005; Patt and Jüpner 2020). Recently, the concept of Nature-based solutions (NbS) has been associated with NWRM and green infrastructure (GI) (Moosavi et al. 2021). Despite the ample evidence and policy-makers’ acknowledgment of the multiple benefits of NbS for flood risk management (Grossmann et al. 2010; Schindler et al. 2014; Hartmann et al. 2019) and for creating more resilient societies (Grossmann et al. 2010; Da Silva and Wheeler 2017; Hansen et al. 2019), implementation is still slow. The knowledge on the role that decision-makers’ attitudes play in explaining this implementation-gap for NWRMs in flood risk management is still limited. Therefore, this paper aims to identify public sector decision-makers’ attitudes in the German state of Saxony-Anhalt toward NbS for flood prevention.

For this study, we define decision-makers as individuals with responsibility for a team and topic within their authority. Based on our previous work, we understand NbS as “actions that (i) alleviate a well-defined societal challenge, (ii) utilize ecosystem processes of spatial, blue and green infrastructure networks, and (iii) are embedded within viable governance or business models for implementation” (Albert et al. 2019). The International Union for Conservation of Nature (IUCN) stresses the importance of NbS for biodiversity conservation defining NbS as “actions to protect, sustainably manage and restore natural and modified ecosystems that address societal challenges effectively and adaptively, simultaneously providing human well-being and biodiversity benefits” (Cohen-Shacham et al. 2016). The European Commission, in contrast, provides a more general definition and defines NbS as “actions which are inspired by, supported by or copied from nature” (European Commission 2015). Typical large-scale NbS are floodplain restorations and management and the reclamation of natural retention areas through dike relocations. In contrast to NbS, technical or “gray” solutions are classical one-purpose engineering measures, such as reservoirs, dikes, floodwalls, or drainage systems (Hartmann et al. 2019).

Researchers expect that climate change will sharply increase flood risk in terms of potential damages and the number of people affected in several European regions by the end of the twenty-first century (Rojas et al. 2013; EEA 2017; Szewczyk et al. 2018; Hosseinzadehtalaei et al. 2020). Floods are part of rivers’ natural fluvial dynamics and are a fundamental driving force of ecosystem processes and services (Shafroth et al. 2010). In Europe, river floods are among the most dangerous natural hazards, responsible for billions of Euros in annual economic damages (EEA 2010). These damages are exacerbated by anthropogenic activities (Merz et al. 2012; Rojas et al. 2013; Jongman et al. 2014). Dikes and river-straightening, agricultural land use, and surface sealing increase flood risk, the loss of a majority of floodplains, and the degradation of ecosystem services in river landscapes (Merz et al. 2012; Gilvear et al. 2013).

To mitigate these effects and prevent floods, Germany and other EU countries aim to increase and improve retention areas through dike relocation and floodplain restoration projects (European Commission 2014; BMU 2015; MULE 2020b). The extreme flood events of the last decades accelerated this process (e.g., 1997, 2002, 2013) by making flood management a priority of the affected German states’ political agendas and their water authorities (BMU 2015; EEA 2017; MULE 2020b). These events have shown authorities and the public that dikes cannot guarantee absolute protection, but under certain conditions even promote the potential for damage in flood-prone areas (Kok and Grossmann 2010; Di Baldassarre et al. 2018).

Considering that two-thirds of the former 15,000 square kilometers of floodplains in Germany are disconnected from river dynamics (BMU 2015), the current efforts to implement dike relocations to regain retention space seem negligible. Despite hydrological studies demonstrating the effectiveness of dike relocations (Schwaller 2006; Alexy 2013; Faulhaber 2013; Heinzelmann et al. 2016) and the political support through national programs, these measures are only slowly picked up and considered for flood prevention purposes. As of today dike relocation projects are still exceptions in German states’ flood risk management plans (Brillinger et al. 2020). Knowledge about barriers for implementation of natural flood management approaches exists (Sarabi et al. 2019; Solheim et al. 2021). However, systematic knowledge of decision-makers’ views and expectations toward such measures and their impact on implementation is still understudied.

Venkataramanan et al. (2020) point out the need to systematically assess the “human dimensions” for using GI for flood management. Their review analyzes studies dealing with knowledge, attitudes, intentions, and behavior of using GI in flood management in the urban context. The review finds that the willingness to implement GI varies and strongly depends on the context. The analyzed studies on attitudes cover functional, aesthetic, health, safety, conservation, financial, and cultural values of different GI measures in the urban context. Several studies found that respondents doubt GI measures’ potential to effectively prevent flooding (Kati and Jari 2016; Meng et al. 2018). Concerns among decision-makers about the effectiveness of NbS is a recurring theme in recent studies (Sarabi et al. 2019; Bark et al. 2021; Solheim et al. 2021). Most of the cited studies in this paragraph focus on the urban context, but first studies exist that illustrate the effectiveness of NbS such as wetlands on larger landscape scales (Thorslund 2017). The landscape and river context differs significantly from the urban context in its spatial dimensions, ecological dynamics, and required flood management approaches. However, decision-makers’ behavioral patterns, attitudes, and institutional, technical, economic, and stakeholder-related aspects may be comparable (Solheim et al. 2021).

Several studies highlight these aspects and their impact on the implementation of NbS (Guerrin, 2015; van Buuren et al. 2018; Waylen et al. 2018; Han and Kuhlicke 2019; Wells et al. 2020; Bark et al. 2021; Solheim et al. 2021). In a comprehensive analysis of case studies, Solheim et al. (2021) found that the lack of political will and long-term commitment paired with a lack of public support, risk aversion, resistance to change, uncertainty in NbS effectiveness, and perceived high cost can lead to implementation failure in projects dedicated to reducing hydro-meteorological hazards. The basis of many of these barriers is the skepticism caused by a lack of knowledge about NbS among authorities, landowners, politicians, and contractors in the construction industry. Mainly, knowledge of NbS’ ability to deliver multiple benefits is lacking in these stakeholder groups (Venkataramanan et al. 2020; Wells et al. 2020; Solheim et al. 2021). The extent of the knowledge gap differs between stakeholder groups. For practitioners in the UK, Wells et al. (2020) found that their skepticism is not necessarily related to a lack of knowledge about natural flood management measures but related to their engineering background and unfamiliarity with these approaches.

As the role of decision-makers’ attitudes toward dike relocation measures for flood prevention still has not been systematically assessed, this paper contributes to this body of literature. We focus our study on decision-makers in water authorities in the German state of Saxony-Anhalt and shed light on decision-makers’ attitudes toward dike relocations with floodplain restoration, also referred to as “the measures” throughout this paper. We use Q-methodology to explore decision-makers’ viewpoints regarding the implementation of the combined measures for flood risk management. Additionally, we analyze which aspects decision-makers deem essential for implementing dike relocations and floodplain restorations.

Materials and methods

Q-methodology

Q-methodology originates from the field of psychology and is now applied to a variety of other domains of research as well (Brown 1980; Zabala et al. 2018). In the field of water retention, for instance, Q-methodology has been used to analyze the views of social and environmental researchers on dam development in Latin America (Schulz and Adams 2021) or the vulnerability of stakeholders reliant on water-based ecosystem services derived from the Shoshone National Forest in Wyoming (Armatas et al. 2017). The methodology is primarily used to reveal social viewpoints on a specific topic among stakeholders (Watts and Stenner 2012). Thereby, Q-methodology combines advantages of qualitative and quantitative research approaches (Brown 1993). The method has been used to investigate patterns in stakeholder opinions on issues such as animal intelligence, ecological economics, forest management, environmental policy and decision-making (Webler et al. 2009). In terms of investigating conservation goals, Q-methodology has been applied to address conflict, devise management alternatives, understand policy acceptability, and critically reflect on the values that implicitly influence research and practice (Zabala et al. 2018), making it a suitable tool to investigate decision-makers’ attitudes in flood risk management.

Q-methodology is based on an interview format, in which researchers present stakeholders with pre-defined opinion statements concerning a topic. Participants agree or disagree with the statements by sorting them into a forced-choice distribution grid along a scale (see Fig. 1). The individual statement allocations resulting from this process are referred to as “Q-sorts” (Brown 1993; Watts and Stenner 2012). In the end, researchers are able to compare statement allocations and derive different attitude profiles from common sorting patterns. For a successful Q-study it is crucial to clearly define opinion statements (concourse and Q-set), select relevant stakeholders (P-set), and determine the correct interview format (Watts and Stenner 2012; Zabala et al. 2018). In the remainder of this section, we present the design of our undertaken Q-study starting with case study and participants (P-set), followed by the concourse, the Q-sample (Q-set) and the Q-sort process.

Fig. 1
figure 1

The “Q-grid” used for this study, consisting of 41 tiles

Case study and participants (P-set)

Germany delegates responsibility to design detailed strategies and measures against flooding to its 16 states (BMU 2017). As a consequence, the jurisdiction for implementing the European Floods Directive (2007/60/EC) is different in each state. Saxony-Anhalt was chosen as a case study because it is suited for the implementation of large-scale NbS. Figure 2 shows the the state of Saxony-Anhalt and its geographical location within Germany, its majore river systems and current and planned dike relocation projects.

Fig. 2
figure 2

Dike relocations in Saxony-Anhalt, Germany. *Note: The figure shows 23 measures; however, for one of the measures in the “long-term realization” phase, it is currently still unclear whether it will be implemented as a dike relocation or as a polder. For that reason, we speak of only 22 dike relocations in the text

After the 2002 and 2013 floods, dike relocation became an important part of the state’s flood prevention concept (Reymann and Eichhorn 2019). Additionally, land ownership in Saxony-Anhalt is less fragmented than in other federal states in Germany. This traces back to communist land collectivization (Schöne 2005), and reduces challenges that fragmented land ownership presents for implementing large-scale NbS (Kabisch et al. 2016; Wamsler et al. 2017). Also, Saxony-Anhalt’s authorities have experience implementing twelve dike relocations since 1990 (MULE 2018).

Saxony-Anhalt prioritized 42 locations for flood retention measures, of which 22 are dike relocation projects (LHW 2014; MLU 2015). As of 2020, the state has regained over 1,666 hectares of retention space (MULE 2020a). Germany’s overall floodable area has increased by 7100 hectares (BMUB 2015; Koenzen et al. 2021). These figures show that Saxony-Anhalt is a pioneer in implementing dike relocation with floodplain restoration in Germany. It is therefore likely that decision-makers in Saxony-Anhalt are familiar with the concept and can provide expert opinions.

Saxony-Anhalt has assigned responsibility for flood risk management to the following authorities:

  1. 1.

    The Ministry of Environment, Agriculture, and Energy (MULE) as the highest water authority;

  2. 2.

    The State Administration Office (Landesverwaltungsamt) as the upper water authority;

  3. 3.

    The counties and independent cities as lower water authorities; and

  4. 4.

    The Saxony-Anhalt State Office for Flood Protection and Water Management (LHW) as the implementing authority (Sachsen-Anhalt 2011b).

The State Administration Office has legal supervision over dike relocations whereas the LHW develops and maintains the state’s watercourses (Sachsen-Anhalt 2011a). The LHW is a subordinate agency of the MULE. Additionally, we included the biosphere reserve administration “Mittelelbe” as another subordinate agency of the MULE to the list of relevant authorities. An online search for decision-makers within these authorities turned up 75 matches. All were contacted via email and asked to participate in the study. Those who did not respond were called a few days later. Fifteen interviews were scheduled, resulting in 15 Q-sorts. The 15 participants work at the following authorities: Biosphere Reserve Administration (1), Lower Authorities (6), MULE (2), LHW (6).

Concourse

The concourse is central to Q-methodology. It comprises statements that ideally contain expressions of all possible perspectives held on the topic in question. These statements can be collected by analyzing literature and media. However, it is considered more efficient and precise to perform interviews with informed individuals to gather relevant statements. Interviews also deliver valuable subjective insights (Webler et al. 2009; Watts and Stenner 2012). Therefore, we conducted 21 semi-structured interviews about dike relocation and flood plain restoration with flood management experts in 2018 and 2019. These interviews served as the source material for a pre-selection of 271 statements.

Q-sample (Q-set)

The Q-set is a representative sample of the concourse—a whole set of possible expressions on the topic gathered from all possible points of view (Zabala 2014). Following a structured approach, we narrowed down the concourse by consolidating statements of similar meaning or argumentation. This process allowed us to identify recurring themes within the remaining statements and order them into three categories: 1. Financing/Efficiency, 2. Implementation Challenges and 3. Objectives and Outcomes. Condensing and rephrasing the categorized statements further produced the final selection of 41 statements, the Q-set. Ten out of the 41 statements related to financing aspects and the measures’ economic effectiveness. Another ten focused on challenges associated with the measures’ implementation, such as availability of land, consent within the population, and time-consuming planning procedures. Twenty-one statements refer to the measures’ effects for flood protection, landscape aesthetics, ecological impact, and common objectives which the measures are meant to fulfill, such as creating synergies between the water framework and the floods directive as well as providing benefits for nature and people’s well-being.

To test the quality and comprehensiveness of the selected statements, three trial interviews were conducted. The trials were undertaken with flood protection experts of the Brandenburg Ministry of Agriculture, Environment and Climate Protection, the Hessen Regional Council Gießen, and the North Rhineland-Palatinate Structural and Approval Directorate. Individual statements were edited for better comprehension and clarity after the trials.

Q-sorting process

Participants order the provided statements during the Q-sort. First, we asked participants to stack the 41 statements into three piles: disagree, neutral and agree. Next, the participants sorted the statements into a grid of 41 cells (see Fig. 1), giving a value to each statement ranging from − 4 (disagree) to + 4 (agree).

The bell-shaped grid forced participants to prioritize a small number of statements over others and made finished sorts comparable to one another. The Q-sort was set up online with an HTML5 Q-sorting tool (Aproxima et al. 2020)Footnote 1, Footnote 2

Results

We analyzed the data, consisting of 15 Q-sorts, with the ‘qmethod’ package.Footnote 3

Table 1 The rotated factor loadings with Q-sorts as rows and factors as columns
Table 2 The number of flagged Q-sorts, the composite reliability, and the standard error of factor scores

The flagging of Q-sorts allowed us to significantly link 13 of the 15 Q-sorts to one of the three extracted factors (see Table 1). Based on these 13 included Q-sorts, three-factor arrays, i.e., exemplary Q-sorts of the factors (see Table 3), were calculated. These exemplary Q-sorts are a simplified representation of the factors’ opinion spectrum and depict how the average person loading onto that factor sorted the statements.

Table 3 The Factor Arrays of a selected number of factors, representing one perspective each

Each factor represents a generalized viewpoint on dike relocation with flood plain restoration for flood prevention held by like-minded participants. The three viewpoints were classified as Viewpoint 1. The Convinced, Viewpoint 2. The Concerned and, Viewpoint 3. The Evaluators.

Viewpoint 1: The Convinced

Seven of the 15 participants are significantly associated with the viewpoint of The Convinced. This viewpoint has an eigenvalue of 3.8 and explains 25.60% of the study variance. Decision-makers of the following authorities loaded into this factor: Biosphere Reserve Administration (1); Lower Authorities (1); MULE (2); LHW (3). The Convinced are particularly distinguished by statements 5, 7, 10, 15, 22, and 41.

The Convinced think the measures should be implemented even if costs are high (#5: +3). They clearly prefer these measures over extending or refurbishing existing dikes (#7: − 2). “I need the space anyway, and dike relocation shortens [the dike], which makes it actually cheaper and therefore, statement #7 is simply wrong,” argues Participant 7 (LHW). They justify this attitude by emphasizing that the measures improve overall ecosystem resilience (#21: +4) and provide synergies compared to purely technical flood protection (#38: +3). “[…] with a floodplain, vegetation, and an increase in area and species, the resilience (of the ecosystem) to environmental pollution is simply greater,” further elaborates Participant 7 (LHW). Some even argue that “the measures should always be preferred [over other measures], because this is the natural course of the river. In my county, it is just farmland protected by the dikes. It would be wise to relocate the dikes to generate new retention space for the river,” according to Participant 8 (Lower Authority) (#19: +1).

With respect to hydraulics, The Convinced do not think that large trees and bushes pose a problem in retention areas (#27: − 4). Furthermore, “the measures work well in large catchment areas,” says Participant 12 (LHW) (#30: − 3). The Convinced believe in the effectiveness of the measures for flood protection (#24: − 3). They also think that acceptance among the affected populations is higher for dike reinforcement than for dike relocation with floodplain restoration (#41: +1). “People prefer the status quo. Farmers, especially, don’t like the measures,” states Participant 9 (MULE). Hence, The Convinced assume that local populations do not favor the measures (#15: − 2). However, “they all like it in retrospect,” adds Participant 9 (MULE).

The Convinced are generally unconcerned about possible pollutants in river sediment (#22: − 1). “The concentration of pollutants in the sediments is very low and of no concern for natural ecosystems,” comments Participant 2 (MULE). This depends on the particular river though and is also “dependent on the land use after the measures implementation,” according to Participant 5 (LHW). “The pollutants are usually latent and not as severe as one might think. More importantly, many pollutants are not in the sediments, but in the plant residues, which are then further distributed by fine sediments,” elaborates Participant 7 (LHW).

Viewpoint 2: The Concerned

Viewpoint 2 comprises three decision-makers of lower water authorities. It has an eigenvalue of 2.9 and explains 19.35% of the study variance. The Concerned are particularly distinguished by statements 1, 3, 9, 20, and 39.

Compared to The Convinced, The Concerned are worried about possible pollutants in river sediments (#22: +4). “My county is an industrial region with big chemical plants. After every flood, the pollutants can be found on the utilized plains,” explains Participant 11 (Lower Authority). Participant 15 (Lower Authority) further elaborates: “This is a local problem of the pesticide industry […], which brings high deposits of ß-hexachlorocyclohexane residues with it.”

The Concerned view the measures’ financing as a big issue (#3: − 4). They doubt that such measures can simply be financed by existing support programs (#9: − 2). “Financing is never easy, since political decisions are never easy,” explains Participant 6 (Lower Authority). Participant 15 (Lower Authority) further specifies: “Financing the dike relocation in our county was only possible through a difficult process, including obtaining private funding. In Saxony-Anhalt, I consider such measures to be hardly financially viable.” According to The Concerned, the state generally lacks the money for implementing the measures (#4: +3). Participant 11 (Lower Authority) explains: “We had a long list of such measures in my county and it is very sad that most of them were canceled due to a lack of financing options.”

Despite these challenges, The Concerned are convinced that the measures provide effective flood protection (#24: − 3). They even view the measures as equally effective to controllable polders (#26: − 3). However, they do not believe measures would be cheaper than technical solutions in the long run (#1: − 2). This is because “dike relocation still leaves a dike to maintain, hence the maintenance stays the same,” explains Participant 6 (Lower Authority). “Furthermore, the retention areas fill up with every flood by sedimentation, which has to be prevented, otherwise I lose the needed cross-section of discharged water flow”, Participant 11 (Lower Authority) elaborates.

The Concerned are indecisive on whether implementing the measures is more time-consuming than for dike restorations (#20: 0), and they have no particular opinion on whether the measures resolve conflicting objectives between the Water Framework Directive and flood protection (#39: 0).

Viewpoint 3: The Evaluators

The two participants significantly loading into Viewpoint 3 work for the LHW. Viewpoint 3 has an eigenvalue of 2.5 and explains 16.86% of the study variance. In contrast to The Concerned, The Evaluators doubt the effectiveness of the measures. The Evaluators are particularly distinguished by statements 6, 11, 19, 21, and 29.

The Evaluators do not think the measures should be prioritized and that they should always be evaluated in comparison with other flood protection options (#19: − 2). “These measures should not be given preferential, but equal treatment compared to other measures because they each address different targets,” states Participant 13 (LHW). With respect to implementing the measures, The Evaluators strongly emphasize the importance of actively involving the population (#12: +4). “Only proper communication and information enables the implementation of these measures, otherwise it leads to considerable resistance. The earlier the people are involved, the easier it is,” says Participant 3 (LHW). With suitable communication, The Evaluators do not foresee problems for implementation stemming from dispersed land ownership (#11: − 3). “We have adequate solutions to address these issues,” Participant 13 (LHW) explains. They do think the implementation of the measures is much more time-consuming than dike restorations (#20: +3).

The Evaluators doubt that the measures improve the flood situation for downstream riparians (#25: − 3). In their judgement, polders are better (26: +2). Similar to The Concerned, The Evaluators regard possible pollutants in river sediments as problematic (#22: +3). The Evaluators see no aesthetic or touristic benefit in the measures (#29: − 2). They disagree that the measures are implemented for ideological reasons (#33: − 3). “At the technical level of flood protection, ideological reasons do not play a role, nor should they. What matters are the hydraulics, and the costs must be kept within limits” says Participant 13 (LHW). Therefore, and in contrast to the other viewpoints, The Evaluators consider it of utmost importance that environmental and resource costs are taken into account for a cost–benefit analysis of the measures (#6: +3).

Points of consensus

The results show that there are eleven statements, on which the majority of participants of this study agree. These are statements 8, 12, 17, 18, 24, 30, 31, 32, 33, 35, and 40.

The decision-makers agree upon the importance of including all stakeholders throughout the planning process of the measures (#12: +2, +3, +4). “Without preliminary work with the local population, nothing gets done,” commented Participant 12 (LHW). Decision-makers also think that solely technical flood protection is no longer sufficient (#35: +2, +1, +2) and that the measures are outstanding in terms of nature conservation (#31: +2, +2, +2). There is also unanimity that the measures are not being implemented solely for ideological reasons (#33: − 2, − 2, − 3) or the water framework directive (#32: − 2, − 1, − 2). Additional benefits going beyond flood protection, such as nature conservation, deliver important arguments to justify the funding of the measures (#8: +2, +2, +1). The participants think the measures provide effective flood protection (#24: − 3, − 3, − 4), particularly in large catchment areas (#30, − 3, − 1, − 1), which “under appropriate conditions [] last forever,” (Participant 4, Lower Authority). The decision-makers are undecided on whether the implementation of the measures is dependent on committed individuals or not (#18: 0, − 1, 1). Decision-makers also believe that the presence of hydropower or sewage treatment plants does not threaten the measures’ implementation (#17: − 1, − 1, 0), a point of concern expressed in the interviews preceding this study.

Distinguishing points

The results show that there are seven statements, on which the participants of this study disagree. These are statements 2, 4, 14, 25, 26, 27 and 34.

The participants disagree on whether there is a lack of reliable data to evaluate the economic efficiency of the measures (#2: 0, +2, − 2). Whereas The Convinced have a neutral position toward the matter as “Economic efficiency in the sense of sustainability has never been investigated in this way” (Participant 7, LHW) The Concerned and The Evaluators are split on whether there is reliable data available.

Whether the state lacks the money to implement such measures (#4: 0, +3, − 2) is also disputed. The Convinced argue that “money is a matter of priorities not of abundance,” (Participant 5, LHW). The Concerned believe that “the state lacks the money. It is dependent on co-financing from the federal government and the EU,” (Participant 6, Lower Authority). The Evaluators are certain that financing the measures is not a problem at all since adequate funds are available. “Flood protection is not a matter of money, but effectiveness” says Participant 3 (LHW).

Further disagreement centers on whether the main problem with such measures is the availability of land (#14: +1, +3, − 2). The Convinced and The Concerned agree, but with different emphases. “When EU funding is used, we can’t spend more than 10% for acquiring land,” says Participant 12 (LHW). The Evaluators oppose. Participant 3 (LHW) says: “We have tools within the land reallocation procedure to solve this, and money solves many problems”.

Whether the measures improve the flood situation for downstream riparians (#25: +1, +2, − 3) polarizes even members of The Convinced. Participant 9 (MULE) argues that “there is a suction effect upstream only in close proximity of the measures, but not downstream” while Participant 12 (LHW) says “depending on the size of the measure, an improvement in the discharge conditions for the downstream riparians can be observed.” The Concerned are certain that the measures do improve the situation for downstream riparians. The Evaluators on the other hand believe that “from a purely technical point of view, dike relocation functions upstream and flood polders downstream. A polder cuts the flood wave so that the people downstream get the benefit. With dike relocation, the water simply flows into the retention space, which means that it is only beneficial for upstream riparians” (Participant 3, LHW).

Controversial opinions also arise on whether “the measures have a lower effect for flood protection, compared to controllable polders” (#26: 0, − 3, +2). The Convinced again have “two hearts beating in a chest. Polders, for the protection of the people, and dike relocation for protecting the environment,” says Participant 9 (MULE). The Concerned laud the effectiveness of the measures. “Depending on the size, polders are often not better than dike relocations” says Participant 15 (Lower Authority). The Evaluators promote the effectiveness of polders over the measures. “A polder effectively cuts the flood wave, so that the people downstream get the benefit” (Participant 3, LHW).

Views are divided over whether “the retention areas should remain free of large trees and bushes” (#27: − 4, − 2, 0). The Convinced reject this statement. “Bushes have a very positive effect since they slow down the runoff,” says Participant 7 (LHW). “There are only a few places where this is a problem, e.g., city locations or constrained areas,” adds Participant 1 (Biosphere Reserve Administration). The Concerned are more moderate. “Big trees do not pose a problem. The problem is when afforestation or planting occurs, which really hinders the runoff” argues Participant 6 (Lower Authority). Participant 11 (Lower Authority) says “this is a very hot topic, I personally disagree with the statement, but I know that there are other opinions as well.The Evaluators are undecided since, according to Participant 13 (LHW), “large trees are not a problem, extensive bushes, however, are.

Disagreement is also documented on whether these measures only make sense if the flood risk can be reduced by them (#34: − 3, − 1, +1). The Convinced disagree “because sometimes it can also make sense for reasons of nature conservation alone” (Participant 12, LHW). The Concerned agree with The Convinced to a certain extent. “The measures make sense, even if they do not reduce the flood risk” says Participant 11 (Lower Authority). The Evaluators think that the measures only make sense if the risk of flooding is reduced significantly.

Discussion

We identified three viewpoints that reflect decision-makers attitudes toward dike relocation with floodplain restoration in Saxony-Anhalt. The analysis further revealed consensus and disagreement between them, which allows us to draw conclusions on what decision-makers believe are barriers to successful implementation.

The first viewpoint, The Convinced, comprises decision-makers with a positive attitude toward the measures. This perspective is grounded in the expected multifunctional outcomes and synergies with objectives other than flood protection. In their opinion, synergies and ecological co-benefits make the measures advantageous over purely technical flood protection measures. While the costs for planning and building technical measures are high, they believe that emphasizing NWRM might come at an even higher cost and effort. However, they believe that the multiple benefits outweigh the additional resources required and that these benefits are an excellent selling point for funding.

The second viewpoint, The Concerned, is skeptical whether the current funding schemes and institutional support networks are sufficient to realize these large-scale measures. Generally, they are in favor of the measures and do not doubt their effectiveness. They believe that the measures are as effective as actively managed polders, provide benefits to upstream and downstream users, increase ecosystem resilience and contribute to nature conservation. All the benefits, however, do not outweigh the perceived obstacles. These obstacles reflect experiences and expectations related to implementation failure associated with a lack of funding, insufficient data available to measure efficiency, and the limited availability of land.

The third viewpoint, The Evaluators, take a neutral perspective in which dike relocation with floodplain restoration need to prove their contextual effectiveness and efficiency relative to all other available measures. While The Convinced and The Concerned believe that increasing retention space also improves the situation downstream, The Evaluators do not share that position. They are generally less critical regarding potential barriers such as funding, land availability and stakeholder opinion. They emphasize the importance of involving those who are affected by measures’ implementation. Their understanding of active stakeholder involvement is, however, unclear. The Evaluators viewpoint is indicative for representatives of the LHW, a subordinate state authority of the Saxony-Anhalt Ministry for Environment, Agriculture and Energy. As members of a subordinate unit of the ministry, we expected them to follow the ministry's three-pillar agenda for engaging the public. The agenda consists of informative, consultative, and cooperative participation (MULE 2020b).

Across the three viewpoints, we found a general agreement among decision-makers that the measures provide co-benefits and adequate flood protection. There is, however, some dispute about the size and direction of the effect. General disagreement exists about whether the measures benefit downstream riparians, upstream riparians, or both. The converging opinions on the effectiveness of the measures are consistent with scientific findings (e.g., Grossmann et al. 2010; Kok and Grossmann 2010; Klijn et al. 2018; Ruangpan et al. 2020). It is surprising that decision-makers generally agree about the measures’ effectiveness despite the uncertainty pinning down the measures’ concrete effect size in hydrological models (Busch and Hammer 2006). Studies assessing the acceptance of natural flood management measures among different stakeholder groups found similar results for public sector representatives and academics (Iacob et al. 2014; Wilkinson et al. 2019; Bark et al. 2021). The positive evaluation of effectiveness in our sample may depend on the specific context of our study, where decision-makers are already familiar with dike relocation and floodplain restorations. In consequence, they might have gained positive experiences regarding the effectiveness of the measure. This is in line with Venkataramanan's et al. (2020) findings that the willingness to implement GI varies and strongly depends on context.

The expected co-benefits for nature conservation and the Water Framework Directive seem to be critical arguments to justify the measures. This may be explained by institutions in place for the synergistic implementation of the Water Framework Directive and the Floods Directive in the German states (LAWA 2013). Also, funding requirements of the federal government’s National Flood Protection Program may influence the focus on co-benefits and synergies. Positive scores for effectiveness and synergies with the Water Framework Directive, nature conservation and climate change mitigation are criteria for measures to receive funding through the National Flood Protection Program (LAWA 2014).

While other studies found that decision-makers lack knowledge on NbS co-benefits (Wells et al. 2020; Solheim et al. 2021), our findings cannot confirm these results. Decision-makers are aware of NbS co-benefits, although not of the full range of co-benefits. As in other studies, we find a strong focus on functional benefits such as nature conservation and flood protection (Venkataramanan et al. 2020). However, synergistic effects of dike relocation with floodplain restoration need not be limited to ecological aspects but can also create benefits for tourism or provide other ecosystem services (Brouwer and van Ek 2004; Posthumus et al. 2008; Schindler et al. 2014; Klijn et al. 2018). Regarding these types of co-benefits, the three viewpoints are relatively indifferent. Only The Evaluators stand out by denying that the measures deliver such touristic benefits. To implement NbS in practice, their co-benefits should be stressed and communicated (Han and Kuhlicke 2019; O’Donnell et al. 2020). Especially, decision-makers need to be more informed.

The decision-makers’ perception of benefits for flood risk reduction and co-benefits for nature conservation seems to shape their attitudes toward dike relocation with floodplain restoration. Once decision-makers acknowledge these co-benefits, they tend to hold a positive attitude toward the NbS in question (Han and Kuhlicke 2019). Attitudes toward NbS have been found to influence behavior and decision-making related to NbS implementation in different actor groups (Allred and Gary 2019; Santoro et al. 2019; Venkataramanan et al. 2020). For riparian landowners, attitudes and previous behavior were found to be solid predictors for implementation of buffer strips along streams (Allred and Gary 2019). It seems that a similar pattern occurs in our sample. The generally positive attitude for the measures and positive past experiences suggest high willingness for support or implementation (Ajzen 1991).

Disagreement between viewpoints is predominantly about the significance of implementation barriers such as land availability and funding. The Concerned believe that land availability and the current funding instruments are significant barriers, whereas The Evaluators disagree and do not believe so. That divide between the two viewpoints may be based on the participants' different backgrounds. The Concerned viewpoint primarily represents the opinions of county-level administrators, whereas The Evaluators viewpoint represents the opinions of state-level administrators. The responsibility for implementing large-scale measures such as dike relocation lies exclusively with state-level agencies such as the LHW. Therefore, the LHW administrators have more practical experience with different regulatory tools available for land acquisition than county-level administrators. Also, state-level authorities have more knowledge about and access to federal and EU funding, such as the National Flood Protection Program, the Joint Task for the Improvement of Agricultural Structures and Coastal Protection, the European Agricultural Fund for Rural Development (EAFRD) and the European Regional Development Fund (ERDF) (Christ 2018; BMEL 2020). County-level administrators rely on financial resources distributed by state agencies. Nevertheless, the strong disagreement over the lack of funding between the viewpoints is surprising. Other studies find that the available budget for flood risk management measures does not seem to be a major constraint for decision-makers (Albrecht and Hartmann 2021).

Generally, limited land availability is a common constraint for implementing NWRM (BMUB 2015; Hartmann et al. 2019; Löschner et al. 2021). However, the controversy among the viewpoints focuses less on whether the land needed for dike relocation is available and more on how the land can be acquired. This is in line with findings by Albrecht and Hartmann (2021), who show that there are various instruments available for land acquisition for dike relocation, but that water management authorities have so far been reluctant to apply these instruments because of the potential administrative burden. Due to the comparatively high amount of dike relocations underway in Saxony-Anhalt, we believe that decision-makers in the state are less reluctant to apply land acquisition measures (MULE 2020b). The state also has more favorable conditions that reduce the administrative burden for agencies when exercising pre-emption rights in land acquisitions (Albrecht and Hartmann 2021).

Compared to other methods, Q-methodology allowed us to collect critical expert reflections upon the debate on using dike relocations with floodplain restoration for flood prevention and at the same time quantify their viewpoints, which were supported by the qualitative interview data.

However, some limitations need to be noted regarding the present study. While Q-methodology is suitable for identifying prevailing viewpoints and attitudes among a selected target group, the results do not allow conclusions about the distribution of viewpoints among the targeted group. Also, the scope of the results is mostly case study dependent, as the quantified attitudes are driven mainly by stakeholder experience. Therefore, the results only reflect the attitudes of decision-makers from Saxony-Anhalt in Germany.

Even though the participant sample is not representative for Germany, the selected statements are. The statements were developed based on semi-structured interviews with flood risk management experts from different German states. Therefore, we assume that the statements reflect the full breadth of the debate and are therefore relevant for all decision-makers in the field in Germany. Despite Saxony-Anhalt being a pioneer state in applying these measures, possibly implicating a certain bias, different viewpoints indicating a nuanced spectrum of scepticism was documented. The “pioneer” effect may be visible in the distribution of participants between the three viewpoints. Seven out of 15 participants are assigned to the viewpoint “Convinced,” only three and two are assigned to “Concerned” and “Evaluators.” It is true that including participants from other states in the sample would change the distribution of participants between viewpoints, and new categories might occur.

The different governance systems of flood management in Germany and other EU countries suggest that a similar study would reveal further or different viewpoints of decision-makers, which calls for further research in the field. The study is further limited by only addressing a subsection of NbS in flood protection. The ongoing discussion and different interpretations of the term did not allow us to ask decision-makers specifically about NbS. Instead, dike relocation with floodplain restoration was selected as an example to serve as a known model of NbS. Therefore, it must be acknowledged that this study reveals more about decision-makers' attitudes toward familiar concepts than the term NbS.

In retrospect, the 41 statements could have been phrased more concisely to cause stronger heterogeneity among the participants. The broad consensus of this study might be due to a too gentle formulation of the statements. The unanimity complicates clear differentiation between the viewpoints. Nevertheless, Q-method proved to be a valuable tool for the extraction of opinions under the condition that the statements represent a wide range of views. Sticking to the collection of interviews, which form the basis for this study, did not generate more polarizing statements. A stronger polarization could have caused more contradicting results within the viewpoints. At times, there are diverging opinions within a viewpoint, yet the statistical results put them into the same category. On the other hand, this bias can be interpreted as typically human.

Regarding the Q-sort, we could have incorporated more statements to better understand decision-makers views on stakeholder participation and funding. For funding, we did not include information on transaction costs for information, planning and design, meetings, communication, participation processes, negotiations, conflict resolution, and implementation (Meyer et al. 2012). For stakeholder participation, we can only state that decision-makers agree on its importance, but not whether this participation goes beyond informing the stakeholders.

Finally, Q-methodology reveals prevailing attitudes among a selected group of people. It does not unveil the quantitative weighting of the observed attitudes among the examined group. For this study, the majority of the participants are The Convinced. However, this finding does not imply that most decision-makers in Saxony-Anhalt share that viewpoint. It is possible that the same study, undertaken with other participants, could have resulted in a majority of The Concerned or The Evaluators. Therefore, it would be interesting to use the results for a follow-up study to determine which of the viewpoints prevail among decision-makers in Saxony-Anhalt and the other German States.

Conclusion

This study set out to investigate administrative decision-makers' attitudes on NbS for flood prevention in Saxony-Anhalt. To identify these attitudes, we applied Q-methodology. In our case, the previous experiences of the administration of Saxony-Anhalt with dike relocations and floodplain restoration are overall positively reflected in the attitude of the respondents towards such measures for flood risk management. We, therefore, suggest that positive experiences of decision-makers and success stories of previous NbS projects should be shared and integrated into future decision-making processes to encourage decision-makers of other states or EU countries taking more initiative to implement NbS for flood risk management. While our findings cannot be generalized beyond our case study, the study could be replicated with institutions for flood risk management in other German states or different countries and with different NbS measures. Although the decision-makers agree that the application of pure technical solutions is no longer sufficient for flood risk management, they emphasized different concerns about dike relocation and floodplain restoration. We found three significant viewpoints among the experts: (1) The Convinced, (2) The Concerned and, (3) The Evaluators. The Convinced are generally in favor of the measures, emphasizing the various benefits that justify implementation. The Concerned are worried about a lack of funding and space needed for the measures and possible pollutants on the resulting floodplains. The Evaluators call for a balanced evaluation of all available measures for planning flood prevention measures.

Our study results show that varying beliefs associated with expected outcomes and potential implementation challenges define viewpoints. We did not measure the degree of each belief on a decision-maker’s willingness to implement NWRM. However, we identified potential intervention points to influence willingness to implement NWRM positively. For example, states and the federal government should address the need for county-level decision-makers to have easier access to funding for NWRM on second- and third-order waters. Also, the lack of knowledge about the land acquisition toolbox or the apprehension to use it could be addressed with targeted dissemination measures. NWRMs’ position in formal evaluation processes needs to be strengthened. Therefore, well-documented demonstration projects and explorations of their outcomes in evaluation processes are necessary.

Future research could include these results into a quantitative survey to get insights on how representative they are for a wider group of decision-makers and distinguish the governance level of the decision-makers. Such further development of our study would be another critical step toward closing research and implementation gaps on NbS for flood risk management.