Abstract.

Engineering Process Controllers (EPC) are frequently based on parametrized models. If process conditions change, the parameter estimates used by the controllers may become biased, and the quality characteristics will be affected. To detect such changes it is adequate to use Statistical Process Control (SPC) methods. The run length statistic is commonly used to describe the performance of an SPC chart. This paper develops approximations for the first two moments of the run length distribution of a one-sided Shewhart chart used to detect two types of process changes in a system that is regulated by a given EPC scheme: i) changes in the level parameter; ii) changes in the drift parameter. If the drift parameter shifts, it is further assumed that the form of the drift process changes from a linear trend under white noise (the in-control drift model) into a random walk with drift model. Two different approximations for the run length moments are presented and their accuracy is numerically analyzed.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Received: August 1998

Rights and permissions

Reprints and permissions

About this article

Cite this article

Göb, R., Del Castillo, E. & Dräger, K. Run length analysis of Shewhart charts applied to drifting processes under an integrative SPC/EPC model. Metrika 50, 137–161 (1999). https://doi.org/10.1007/s001840050041

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s001840050041

Navigation