An experimental investigation of the effect of coatings and cutting parameters on the dry drilling performance of aluminium alloys A. RiveroG. AramendiL.N. López de Lacalle Original Article 13 April 2005 Pages: 1 - 11
Indexing and retrieval in case-based process planning for multi-stage non-axisymmetric deep drawing W.Y. ZhangS.B. TorG.A. Britton Original Article 02 March 2005 Pages: 12 - 22
Multi-objective optimization of forming parameters for tube hydroforming process based on the Taguchi method Bing LiT.J. NyeDon R. Metzger Original Article 13 April 2005 Pages: 23 - 30
Selections of working conditions for creep feed grinding. Part(III): avoidance of the workpiece burning by using improved BP neural network Shih-Bin WangChih-Fu Wu Original Article 03 November 2004 Pages: 31 - 37
Selections of working conditions for creep feed grinding. Part(II): workpiece temperature and critical grinding energy for burning Shih-Bin WangHong-Sen Kou Original Article 03 November 2004 Pages: 38 - 44
Numerical analysis of projection welding on auto-body sheet metal using a coupled finite element method W.-F. ZhuZ.-Q. LinA.-H. Luo Original Article 01 June 2005 Pages: 45 - 52
Integrated simulation of the injection molding process with stereolithography molds Huamin ZhouDequn Li Original Article 06 April 2005 Pages: 53 - 60
Automated surface finishing of plastic injection mold steel with spherical grinding and ball burnishing processes Fang-Jung ShiouChao-Chang A. ChenWen-Tu Li Original Article 30 March 2005 Pages: 61 - 66
Taguchi and Gauss elimination method: A dual response approach for parametric optimization of CNC wire cut EDM of PRAlSiCMMC A. MannaB. Bhattacharyya Original Article 13 April 2005 Pages: 67 - 75
An investigation of the surface contours in laser grooving Ching-Chuan MaiJehnming Lin Original Article 30 March 2005 Pages: 76 - 81
Verification of NC machining processes using swept volumes Jingzhou YangKarim Abdel-Malek Original Article 29 June 2005 Pages: 82 - 91
Repairing incomplete measured data with a deformable model under constraints of feature shapes Huang YunbaoWang QifuWu Jianjie Original Article 20 April 2005 Pages: 92 - 100
Development of Web-based CAM system Yoonho SeoDae-Young KimSuk-Hwan Suh Original Article 04 May 2005 Pages: 101 - 108
Integration of process planning and scheduling in a job shop environment Manish KumarSunil Rajotia Original Article 30 March 2005 Pages: 109 - 116
Towards the integration of process and production planning: an optimisation model for cutting parameters Elsa Henriques Original Article 30 March 2005 Pages: 117 - 128
Hybrid approach to production scheduling using genetic algorithm and simulation Suk Jae JeongSeok Jin LimKyung Sup Kim Original Article 30 March 2005 Pages: 129 - 136
A grid-based scheduling system of manufacturing resources for a virtual enterprise Deng HongChen LiDeng Qianni Original Article 02 March 2005 Pages: 137 - 141
A hybrid control scheme to enhance the detection ability of process mean shifts Sheng Su ChengFong-Jung Yu Original Article 13 April 2005 Pages: 142 - 148
Evaluating process centering with large samples – an approximate lower bound on the accuracy index G.H. Lin Original Article 30 March 2005 Pages: 149 - 153
Predicting engine reliability by support vector machines Wei-Chiang HongPing-Feng Pai Original Article 16 March 2005 Pages: 154 - 161
Web-based remote monitoring and fault diagnosis system Xing WuJin ChenFucai Li Original Article 01 June 2005 Pages: 162 - 175
An agent-based collaborative assembly process planning system Sang Hoon KongSang Do NohKyo Il Lee Original Article 13 April 2005 Pages: 176 - 183
Active stereovision-based robot learning control for object tracking, fixating and grasping Xiao Nan-Feng Original Article 23 February 2005 Pages: 184 - 189
Re-analysis of the degree-of-freedom configuration of the platforms in spatial parallel mechanisms with constraints spaces Jing-Shan ZhaoZhi-Jing FengDe-Wen Jin Original Article 02 March 2005 Pages: 190 - 196
The innovative conveying device application for transferring articles between two-levels of a multi-story building T.-S. ChangH.-P. FuR.-C. Hsu Original Article 17 August 2005 Pages: 197 - 204
Evolutionary optimisation of hedging points for unreliable manufacturing systems P.Y. MokB. Porter Original Article 09 March 2005 Pages: 205 - 214
Estimating product development cycle time using Petri nets S. KumananO.V. Krishnaiah Chetty Original Article 06 April 2005 Pages: 215 - 220