Introduction and literature review

In many production processes, the quality of a product is better monitored by a linear relationship between the quality characteristic and one or more explanatory variables. This relationship is referred to as a profile. Mestek et al. (1994), Stover and Brill (1998), Kang and Albin (2000), Kim et al. (2003), and Mahmoud and Woodall (2004) are just a few researchers who worked on profile monitoring. In addition, Niaki et al. (2007), Saghaei et al. (2009), Zhang et al. (2009), Zhu and Lin (2010), Noorossana et al. (2010), Amiri et al. (2011) and Narvand et al. (2013) are some researchers who worked on Phase-II profile monitoring. Besides, Du et al. (2015a, b) investigated the cascade effects in multistage processes.

As the focus in this paper is Phase-I monitoring, some recent and relevant works are reviewed here. Mahmoud et al. (2007) introduced a change-point method for linear profiles in Phase I. Kazemzadeh et al. (2008) applied three methods, namely a change point, F statistics and T 2, to monitor polynomial profiles in Phase I. Other studies in Phase I include Jensen et al. (2008), Noorossana et al. (2009), Zou et al. (2007) and Khedmati and Niaki (2015a).

In some applications, it is necessary to monitor multistage processes. For example, there are three dependent stages in a production process of Nylon Yarn factory schematically depicted in Fig. 1. A textile industry is another three-stage process involving spinning, weaving and finishing. In this type of industry, there are two successive stages in the weaving process. In the first stage, the strength of the yarn is increased and checked. In the next stage, the strength of the textile in different parts is considered as a profile that is affected by the strength of the yarn (see Fig. 2).

Fig. 1
figure 1

A three-stage process for Nylon yarn production

Fig. 2
figure 2

A two-stage process of weaving

In multistage processes, the stages are generally correlated and the use of profile monitoring without paying attention to the relation between the stages causes monitoring errors. Phase-II monitoring of linear profiles in multistage processes has been investigated by authors including Esmaeeli and Sadeghieh (2013) and Eghbali Ghahyazi et al. (2014). Soleimani et al. (2009) studied the presence of within-profile autocorrelation in simple profile monitoring. Moreover, Atashgar et al. (2014) investigated the Phase-I monitoring problem of multistage processes using the T 2 scheme of Stover and Brill (1998), the T 2 control chart of Kang and Albin (2000), and the T 2 chart of Williams et al. (2007). They studied the effect of the cascade property on the test power factor by changing the slope and the intercept parameters. Moreover, Atashgar et al. (2015) investigated the effect of the cascade property when the T 2 chart of Williams et al. (2007) was used for Phase-I monitoring. In this study, the shifts were imposed on the slope and intercept of a simple linear profile. In another work, Khedmati and Niaki (2015b) considered Phase-I profile monitoring of general linear profiles in multistage processes. In addition, Khedmati and Niaki (2016) focused on profile monitoring of multistage processes using a EWMA control chart. Recently, Kalaei et al. (2016) proposed a methodology to first remove the effect of the cascade property in multistage processes. Then, they developed a control chart for Phase-I monitoring of simple linear profiles.

The review of the relevant studies indicates that Phase-I variability monitoring of profiles in multistage processes involving the cascade property has not been investigated yet. As the performance of a profile monitoring scheme is highly dependent on the standard deviation of the error term in a regression model being used, this paper focuses on Phase-I monitoring of the standard deviation of a simple linear regression profile in a multistage process with cascade property. To this aim, based on Du and Zhang (2016) who discussed the joint monitoring of input and output of systems using autoregressive disturbances of arbitrary orders, a two-stage process is first modeled in this paper by an autoregressive model of order one, i.e., AR(1). Then, the shifts are applied on the standard deviation of a simple linear profile. Similar to Atashgar et al. (2014), three methods in Phase-I profile monitoring including the T 2 control chart proposed by Stover and Brill (1998), the T 2 scheme of Kang and Albin (2000), and the T 2 chart of Williams et al. (2007) are employed to investigate the effect of the cascade property. Eventually a new control chart based on the U statistic is proposed for Phase-I monitoring of the standard deviation in multistage processes. This statistic has been shown to be very effective to remove the effect of the cascade property (Kalaei et al. 2016).

The structure of the remainder of this paper is as follows. In Sect. 2, the problem is defined, the assumptions are made and the two-stage process is modeled. The investigation of the effect of the cascade property on the test power when the standard deviation is changed is performed in Sect. 3. The new control chart based on the U statistic is proposed in Sect. 4. Section 5 is about the performance evaluation of the new methodology. Section 6 as a final part is dedicated to the remarkable conclusions.

Problem definition, assumptions, and modeling

As mentioned above, quality characteristics of a multistage process in any stage are affected not only by the performance of that stage but also by the ones of the previous stages, implying the so-called cascade property. Ignoring this property and assuming independent stages leads into large Type-I errors.

To take into account the cascade property, a multistage process can be expressed by the following equations:

$$y_{ik1} = A_{0} + A_{1} x_{i} + \varepsilon_{ik1} \quad i = 1,2, \ldots ,n$$
(1)
$$y_{iks} = \emptyset y_{ik(s - 1)} + \alpha_{1s} + \alpha_{2s} x_{i} + \varepsilon_{iks} , \quad s = 2,3, \ldots ,S,$$
(2)

where for the kth sample, \((x_{i} ,y_{ik1} )\) and \((x_{i} ,y_{iks} )\) are the ith observation for the first and the sth stages, respectively. In addition, \(A_{0}\) and \(A_{1}\) are the intercept and the slope of the first simple linear profile, respectively, and \(x_{i}\) is an independent variable with constant values such as 0, 0.2, 0.4, 0.6, 0.8, 1, 1.2, 1.4, 1.6 and 1.8 (Mahmoud and Woodall 2004). Moreover, \(\alpha_{1s}\) and \(\alpha_{2s}\) are the special effects of stage s on the intercept and slope, respectively, \(\emptyset\) is the autocorrelation parameter, and \(\varepsilon_{ik1}\) and \(\varepsilon_{iks}\) are the random error terms with normal distribution having mean 0 and variances \(\sigma_{1}^{2}\) and \(\sigma_{s}^{2}\) for the first and the sth stages, respectively. For simplicity \(\sigma_{1}^{2} = \sigma_{s}^{2} = \sigma^{2}\) is considered.

As a Phase-I profile monitoring of multistage processes is considered in this paper, it is necessary to estimate the process parameters. Due to the independency of the first stage, \(A_{0}\) and \(A_{1}\). are estimated, respectively, by \(a_{0k1}\) and \(a_{1k1}\) using the least squares method. Then, the estimates of the intercept and the slope in the second stage, i.e., \(a_{0k2}\) and \(a_{1k2}\), are obtained based on Eqs. (1) and (2) as

$$a_{0k2} = \emptyset a_{0k1} + \alpha_{1} + \varepsilon_{k1}^{{{\prime \prime }}}$$
(3)
$$a_{1k2} = \emptyset a_{1k1} + \alpha_{2} + \varepsilon_{k1}^{'} ,$$
(4)

where,

$$\varepsilon_{k1}^{{{\prime \prime }}} = \frac{{\mathop \sum \nolimits_{i = 1}^{n} \varepsilon_{ik2} }}{n} - \bar{x}\varepsilon_{1}^{{\prime }}$$
(5)

and

$$\varepsilon_{k1}^{'} = \frac{{\mathop \sum \nolimits_{i = 1}^{n} (x_{i} - \bar{x})\varepsilon_{ik2} }}{{s_{xx} }}$$
(6)

have a normal distribution with mean zero and variance \(\sigma^{2} \left( {\frac{1}{n} + \frac{{\bar{x}^{2} }}{{s_{xx} }}} \right)\) and \(\frac{{\sigma^{2} }}{{s_{xx} }}\), respectively. This leads into the mean and the variance of the estimator of the intercept in the second stage as

$$E(a_{0k2} ) = \emptyset A_{0} + \alpha_{1}$$
(7)
$${\text{Var}}(a_{0k2} ) = (1 + \emptyset^{2} ).\sigma^{2} \left( {\frac{1}{n} + \frac{{\bar{x}^{2} }}{{s_{xx} }}} \right).$$
(8)

Moreover, the mean and the variance of the estimator of the slope in the second stage are

$$E(a_{1k2} ) = \emptyset A_{1} + \alpha_{2}$$
(9)
$${\text{Var(}}a_{1k1} )= (1 + \emptyset^{2} )\frac{{\sigma^{2} }}{{s_{xx} }}.$$
(10)

Furthermore, the co-variance estimator is

$${\text{Cov(}}a_{0k2} ,a_{1k2} )= - (1 + \emptyset^{2} )\frac{{\bar{x}\sigma^{2} }}{{s_{xx} }}.$$
(11)

Interested readers are referred to Eghbali Ghahyazi et al. (2014) for more details on Eqs. (7)–(11).

Evaluating the cascade effect on the test power of the control scheme

The effect of the cascade property on the out-of-control signal detection of a monitoring chart is investigated in this section by assessing the test power when the standard deviation parameter is changed. Three control schemes are considered here; the T 2 chart of Kang and Albin (2000), the T 2 scheme of Stover and Brill (1998), and the T 2 chart of Williams et al. (2007). Table 1 contains the statistics used in these methods.

Table 1 Statistics for T 2 of Kang and Albin (2000), T 2 of Stover and Brill (1998), and T 2 of Williams et al. (2007) (Kalaei et al. 2016)

Suppose the two regression models shown in Eqs. (12) and (13) have been defined for the first- and the second-stage profiles in a two-stage process, respectively.

$$y_{ik1} = 3 + 2x_{i} + \varepsilon_{ik1}$$
(12)
$$y_{ik2} = (3\emptyset + \alpha_{1} ) + (2\emptyset + \alpha_{2} )x_{i} + \emptyset \varepsilon_{ik1} + \varepsilon_{ik2} .$$
(13)

Let x i  = [0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8], \((3\emptyset + \alpha_{1} ) = 2\), and \((2\emptyset + \alpha_{2} ) = 1\) (Eghbali Ghahyazi et al. 2012), where \(\varepsilon_{ik1}\) and \(\varepsilon_{ik2}\) follow the normal distribution with mean zero and variance 1. Then, Table 2 and Figs. 3, 4 and 5 show the detection probability of the out-of-control signal for the shifts in the standard deviation of the first-stage profile from \(\sigma\) to \(\sigma \lambda\) based on various values of the autocorrelation parameter. The estimates are obtained using 10,000 simulation runs, where \(\alpha\) (type one error) is assumed 0.01, and \(\lambda = 1.2, 1.4, 1.6, 1.8, 2.0, 2.2, 2.4, 2.6, 2.8, 3. 0\). In this analysis, the standard deviation of the process is shifted in the first stage and the test power is obtained for the second stage.

Fig. 3
figure 3

Test power of T 2 of Kang and Albin (2000) chart under the shifts in the standard deviation of Stage 1 from \(\sigma\) to \(\sigma \lambda\)

Fig. 4
figure 4

Test power of T 2 of Stover & Brill (1998) scheme under the shifts in the standard deviation of Stage 1 from \(\sigma\) to \(\sigma \lambda\)

Fig. 5
figure 5

Test power of T2 of Williams et al. (2007) chart under the shifts in the standard deviation of Stage 1 from \(\sigma\) to \(\sigma \lambda\)

Table 2 The values of the test power for the change in the standard deviation from \(\sigma\) to \(\lambda \sigma\)

The figures clearly show that the test power has an increasing trend in all methods and for all autocorrelation coefficients. In other words, when the shift size in the standard deviation of the first stage increases, the power of detecting an out-of-control signal in the second stage increases for all levels of \(\emptyset\). This increase occurs faster for bigger values of \(\emptyset\), implying that for a given shift in the standard deviation of the first stage, the cascade property that is enhanced when \(\emptyset\) increases leads into an undesired higher Stage-2 detection power. The results in Table 1 as well as in Figs. 3, 4 and 5 also show that the T 2 of Knag and Albin (2000) has the best performance, as the cascade property has the least effect on its test power.

The U method to remove the cascade property

As mentioned, the cascade property of a multistage process affects the test power of a control scheme to rise undesirably. Thus, removing this property may lead into a test power that is a good indicative of the performance of a stage, no matter what happened in its previous stage.

To eliminate or to reduce the cascade property, a control plan is modified using the U statistic proposed by Hauck et al. (1999). For the jth profile in the first stage of a multistage process, in this plan we have

$$U_{j1} = A_{1} .$$
(14)

In addition for stage s we have:

$$U_{js} = A_{s} - \sum\limits_{s(s - 1)} \sum\limits_{(s - 1)(s - 1)}^{ - 1} A_{(s - 1)} ,$$
(15)

where \(A_{{{\text{s}} - 1}}\) and \(A_{\text{s}}\) are the vector estimators of the intercept and slope parameters in stage \(s - 1\) and \(s\), respectively, \(\mathop \sum \nolimits_{s(s - 1)}\) is the covariance matrix of the parameters between stage \(s\) and stage \(s - 1\), and \(\mathop \sum \nolimits_{(s - 1)(s - 1)}\) is variance–covariance matrix of the estimators at stage \(s - 1\) (see Hauck et al. 1999 for more details).

The mean vector and the covariance matrix for the U transformation in the first and sth stage are obtained, respectively, as follows:

$$\mu_{{U_{j1} }} = \mu_{{A_{1} }}$$
(16)
$$\varSigma_{{U_{j1} }} = \varSigma_{{A_{1} }} = \varSigma_{11}$$
(17)
$$\mu_{{U_{js} }} = \mu_{{A_{s} }} - \sum\limits_{s(s - 1)} \sum\limits_{(s - 1)(s - 1)}^{ - 1} \mu_{{A_{(s - 1)} }}$$
(18)
$$\varSigma_{{U_{js} }} = \sum\limits_{ss} - \sum\limits_{s(s - 1)} \sum\limits_{(s - 1)(s - 1)}^{ - 1} \sum\limits_{(s - 1)s} .$$
(19)

Then, the U-transformation when employed for the T 2 of Kang and Albin (2000) scheme for example, the statistic becomes:

$$T_{{U_{js} }}^{2} = (U_{js} - \mu_{{U_{s} }} )\sum\limits_{{U_{s} }}^{ - 1} {(U_{js} - \mu_{{U_{s} }} )^{\text{T}} .}$$
(20)

The upper control limit for this statistic in each stage is \(\chi_{\alpha ,2}^{2}\). (Mahmoud and Woodall 2004). Although similar statistics can be obtained for the other two schemes as well, since the aim is to investigate the performance of the U statistic, they are not discussed in this paper.

Performance evaluation of U method

In this section, the performance of the U method for Phase-I monitoring of simple linear profiles when used for two-stage process is investigated. Kalaei et al. (2016) investigated similar performances when slope and intercept parameters were subject to changes. In this paper, however, the performance of the U method is investigated for the shift in the standard deviation in two cases:

  1. 1.

    Different shifts in the standard deviation involved in the first stage and

  2. 2.

    Different shifts in the standard deviation involved in the first and in the second stages of the process, simultaneously.

Table 3 and Fig. 6 show the probability of detecting an out-of-control situation in the second stage of the process for a shift on the standard deviation of the first stage from \(\sigma\) to \(\sigma \lambda\) when the U method is employed (Case 1 above). The estimates are obtained based on 10,000 simulation runs, assuming \(\alpha = 0.01\) and \(\lambda = 1.2, 1.4, 1.6, 1.8, 2.0, 2.2, 2.4, 2.6, 2.8,\;{\text{and}}\;3.0\).

Table 3 Test power of the U method under the shifts in standard deviation of Stage 1 from \(\sigma\) to \(\sigma \lambda\)
Fig. 6
figure 6

Test power of the U method under the shifts in standard deviation of Stage 1 from \(\sigma\) to \(\sigma \lambda\)

As seen in Fig. 6, when the U method is applied the test power values are not influenced by the value of \(\emptyset\) and are distributed randomly. It means that the performance of the U method for different \(\emptyset\) values is unchanged. On the other hand, Fig. 6 shows that the values of the test power are between 0.12 and 0.14 for different \(\emptyset\) values. It indicates that the proposed approach has the robust property to monitor a simple linear profile in a multistage process.

A similar investigation is performed on the performance of the U methods in Case 2, when simultaneous shifts are imposed on the standard deviations of both stages. Table 4 contains the probabilities of detecting an out-of-control condition when the standard deviations of the first and the second stage of the process are changed from \(\sigma_{1}\) to \(\lambda_{1} \sigma_{1}\) and from \(\sigma_{2}\) to \(\lambda_{2} \sigma_{2}\), respectively, where \(\lambda_{1} = \lambda_{1} = 1.2, 1.4, 1.6, 1.8, 2.0, 2.2, 2.4, 2.6, 2.8, {\text{and}}\; 3.0\). Again, the estimates are obtained based on 10,000 simulation runs and \(\alpha = 0.01\). Figure 7 is a plot of the test power results when the shift value of first stage is \(1.2\sigma_{1}\). The other plots for the other values of \(\lambda_{1}\) show a similar pattern.

Table 4 Test powers of the U method under the shifts in standard deviations of the first and the second stages of the process from \(\sigma_{1}\). to \(\lambda_{1} \sigma_{1}\) and from \(\sigma_{2}\) to \(\lambda_{2} \sigma_{2}\), respectively
Fig. 7
figure 7

Test powers of the U method under the shifts in standard deviations of Stage 1 from \(\sigma_{1}\) to \(\lambda_{1} \sigma_{1}\) \((\lambda_{1} = 1.2)\) and Stage 2 from \(\sigma_{2}\) to \(\lambda_{2} \sigma_{2}\)

As seen in Fig. 7, when simultaneous shifts of the standard deviations are imposed in both stages, the values of the test power are increased significantly between 0.4 and 1 (compared to the test powers in Case 1). This is due to the fact that the shifts are also considered in the second stage and the test powers are calculated in that stage as well. In this case, as the magnitude of the standard deviation shifts in the second stage of the process increases, the U statistic is able to detect an out-of-control condition with a higher probability as desired.

Conclusion

The cascade property involved in multistage processes has a significant effect on the performances of the control charts designed to monitor these processes. In this paper, this effect was first investigated for three control schemes proposed for Phase-I linear profile monitoring, namely T 2 of Kang and Albin (2000), T 2 of Stover and Brill (1998) and T 2 of Williams et al. (2007). Then, to remove or reduce the cascade property, a method using the U transformation was developed for Phase-I monitoring of linear profiles in multistage processes. Two cases of the shifts in the standard deviations of a two-stage process were considered. The first case involved changes in the standard deviation of the first stage and the second case involved the changes in the standard deviations of both the first and the second stages, simultaneously. Next, the test powers of the developed method in detecting an out-of-control condition of the second stage of the process were investigated. Simulation studies showed a proper performance of the proposed method in removing the cascade property.

The use of a soft computing approach such as artificial neural network and decision tree is recommended for Phase-I monitoring of linear regression profiles in multistage processes.