Risk Management Application-Level Analysis in South Korea Construction Companies Using a Generic Risk Maturity Model

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

Risk can be defined as the effect of uncertainty on the achievement of objectives. All organizations are exposed to risk and uncertainty, and organized risk management is highly regarded in the construction industry. The Generic Risk Maturity Model (GRMM) is a tool for evaluating and identifying the current level, weaknesses, strengths, and areas that need improvement in construction companies. The purpose of this study is to diagnose and analyze domestic construction companies’ risk management maturity and status using the GRMM and to suggest areas for improvement. In this research, domestic construction companies were analyzed using GRMM by targeting 25 companies that ranked in the top 100 in terms of the 2019 South Korean construction evaluation. An online survey was conducted through e-mail and a total of 131 responses from 18 construction companies were collected and analyzed. As a result, the average maturity score (MS) of domestic construction companies was 5.6 but ambition score (AS) became 7.9 points. As a result of evaluating the risk system and execution level, the risk system (RS) score was 6.0, which was higher than the risk execution (RE) score of 5.3, indicating that the risk execution power was lower than that of the risk system. Therefore, in order to improve the level of risk management of Korean construction companies, it is necessary to improve the ability to execute risk management.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Adeleke AQ, Nasidi Y, Bamgbade JA (2016) Assessing the extent of effective construction risk management in nigerian construction companies. Journal of Advanced Research in Business and Management Studies 3(1):1–10

    Google Scholar 

  • Batenburg R, Neppelenbroek M, Shahim A (2014) A maturity model for governance, RM and compliance in hospitals. Journal of Hospital Administration 3(4):43, DOI: https://doi.org/10.5430/jha.v3n4p43

    Article  Google Scholar 

  • Bhosale AS, Ravi K, Patil S (2017) A conceptual model of RM maturity for road construction project. International Journal of Research and Scientific Innovation (IJRSI) IV(IX)

  • Caiado RGG, Lima GBA, Nascimento DLdM, Vieira Neto J, De Oliveira RAM (2016) Guidelines to risk management maturity in construction projects. Brazilian Journal of Operations and Production Management 13(3):372, DOI: https://doi.org/10.14488/BJOPM.2016.v13.n3.a14

    Article  Google Scholar 

  • Carcary M (2013) IT risk management: A capability maturity model perspective. Electronic Journal of Information Systems Evaluation 16(1):3–13

    Google Scholar 

  • Choudhry RM, Iqbal K (2013) Identification of risk management system in construction industry in Pakistan. Journal of Management in Engineering 29(1):42–49, DOI: https://doi.org/10.1061/(asce)me.1943-5479.0000122

    Article  Google Scholar 

  • Elmaallam M, Kriouile A (2012) Model ISR3M for assessing maturity of IS risk management process: Case study. 2012 colloquium in information science and technology, October 22–24, Fez, Morocco

  • Hoseini E, Hertogh M, Bosch-Rekveldt MB (2019) Developing a generic risk maturity model (GRMM) for evaluating risk management in construction projects. Journal of Risk Research 1–20, DOI: https://doi.org/10.1080/13669877.2019.1646309

  • Hwang BG, Zhao X, Toh LP (2014) Risk management in small construction projects in Singapore: Status, barriers and impact. International Journal of Project Management 32(1):116–124, DOI: https://doi.org/10.1016/j.ijproman.2013.01.007

    Article  Google Scholar 

  • Iqbal S, Choudhry RM, Holschemacher K, Ali A, Tamošaitienė J (2015) Risk management in construction projects. Technological and Economic Development of Economy 21(1):65–78

    Article  Google Scholar 

  • Jia G, Ni X, Chen Z, Hong B, Chen Y, Yang F, Lin C (2013) Measuring the maturity of risk management in large-scale construction projects. Automation in Construction 34:56–66, DOI: https://doi.org/10.1016/j.autcon.2012.10.015

    Article  Google Scholar 

  • Krasuski A (2014) A framework for dynamic analytical risk management at the emergency scene. From tribal to top down in the risk management maturity model. 2014 federated conference on computer science and information systems, September 7–10, Warsaw, Poland, DOI: https://doi.org/10.15439/2014F371

  • Lyons T, Skitmore M (2004) Project risk management in the Queensland engineering construction industry: A survey. International Journal of Project Management 22(1):51–61, DOI: https://doi.org/10.1016/s0263-7863(03)00005-x

    Article  Google Scholar 

  • Oliva FL (2016) A maturity model for enterprise risk management. International Journal of Production Economics 173:66–79, DOI: https://doi.org/10.1016/j.ijpe.2015.12.007

    Article  Google Scholar 

  • Proenca D, Estevens J, Vieira R, Borbinha J (2017) Risk management: A maturity model based on ISO 31000. 2017 IEEE 19th conference on business informatics (CBI), July 24–27, Thessaloniki, Greece

  • Serpella A, Ferradab X, Rubioa L, Arauzo S (2015) Evaluating risk management practices in construction organizations. Procedia — Social and Behavioral Sciences 194:201–210, DOI: https://doi.org/10.1016/j.sbspro.2015.06.135

    Article  Google Scholar 

  • Shah L, Siadat A, Vernadat F (2009) Maturity assessment in risk management in manufacturing engineering. 2009 3rd annual IEEE systems conference, March 23–26, Vancouver, BC, Canada

  • Unger CJ, Lechner AM, Kenway J, Glenn V, Walton A (2015) A jurisdictional maturity model for risk management, accountability and continual improvement of abandoned mine remediation programs. Resources Policy 43:1–10, DOI: https://doi.org/10.1016/j.resourpol.2014.10.008

    Article  Google Scholar 

  • Wahlgren G, Kowalski S (2014) Evaluation of escalation maturity model for IT security risk management: A design science work in progress. Proceeding of 2014 IFIP 8.11/11.13 Dewald Roode information security research workshop, Newcastle upon Tyne, UK

  • Xianbo Z, Gang HB, Pheng LS (2012) Implementing enterprise risk management in a Chinese construction firm based in Singapore. WProceedings of the world construction conference 2012: Global challenges in construction industry, June 28–30, Colombo, Sri Lanka

  • Yeo KT, Ren Y (2009) Risk management capability maturity model for complex product systems (CoPS) projects. Systems Engineering 12(4):275–294, DOI: https://doi.org/10.1002/sys.20123

    Article  Google Scholar 

Download references

Acknowledgments

This research was supported by the National Research Foundation of Korea (NRF) and funded by the Korea Government (MSIT), grant number: NRF-2021R1A2C1014267.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Byung-Soo Kim.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Karunarathne, B.V.G., Kim, BS. Risk Management Application-Level Analysis in South Korea Construction Companies Using a Generic Risk Maturity Model. KSCE J Civ Eng 25, 3235–3244 (2021). https://doi.org/10.1007/s12205-021-2277-x

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-021-2277-x

Keywords

Navigation