Skip to main content
Log in

Understanding the underlying reasons behind time overruns of government building projects in Ghana

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

Time overruns are common occurrences in the Ghanaian Construction Industry (GCI), inevitably resulting in budget overruns and eventual project abandonment. This paper presents the findings of a survey which aimed at exploring the severity, frequency and significant Critical Failure Factors (CFF) engendering time overruns in public building projects in Ghana. Thirty CFF were identified based on a two-tier strategy - extensive review of extant literature and exploratory interviews. A total of 240 structured questionnaires were administered to the three key stakeholders within the GCI - clients, consultants and contractors. Based on a response rate of 55%, the five most important factors that engender time overruns have been identified - recurrent default of interim payment by government, government’s refusal to pay local for interest on delayed payments, lengthy payment processes resulting in delays, difficulty in arranging for extra funds when projects exceed their initial budget and interference, bribery and conflict of interest in the selection of contractors. The results of a Spearman’s rank correlation test showed no difference in the viewpoints of the key respondents. The results of this paper have highlighted the widely held belief that most government contracts are poorly planned in the mist of government’s fiscal constraints. It is expected that the findings will provide deeper insight into the underlying factors influencing time overruns and provide pointers towards averting project delays.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Abbey, C., Azeem, V. A., and Kuupiel, C. B. (2010). “Tracking the ghana district assemblies common fund.” Demanding Governance, The World Bank, pp. 71–88.

    Google Scholar 

  • Abdul-Rahman, H., Berawi, M. A., Berawi, A. R., Mohamed, O., Othman, M., and Yahya, I. A. (2006). “Delay mitigation in the Malaysian construction industry.” Journal of Construction Engineering and Management, Vol. 132, No. 2, pp. 125–133, DOI: 10.1061/ASCE0733-93642006132:2125.

    Article  Google Scholar 

  • Adams, O. (1997). “Contractor development in Nigeria: Perceptions of contractors and professionals.” Construction Management and Economics, Vol. 15, No. 1, pp. 95–108.

    Article  Google Scholar 

  • Aibinu, A. A. and Odeyinka, H. A. (2006). “Construction delays and their causative factors in Nigeria.” Journal of Construction Engineering and Management, Vol. 132, No. 7, pp. 667–677, DOI: 10.1061/ASCE0733-93642006132:7667.

    Article  Google Scholar 

  • Ameyaw, C., Mensah, S., and Osei-Tutu, E. (2012). “Public procurement in Ghana: The implementation challenges to the public procurement law 2003 (Act 663).” International Journal of Construction Supply Chain Management, Vol. 2, No. 2, pp. 55–65. DOI: 10.14424/ijcscm202012-55-65

    Article  Google Scholar 

  • Amoah, P., Ahadzie, D. K., and Dansoh, A. (2011). The factors affecting construction performance in Ghana: the perspective of small-scale building contractors.

    Google Scholar 

  • Anvuur, A., Kumaraswamy, M., and Male, S. (2006). “Taking forward public procurement reforms in Ghana.” CIB W107 Construction in Developing Countries International Symposium, Santiago, Chile.

    Google Scholar 

  • Apolot, R., Alinaitwe, H., and Tindiwensi, D. (2011). “An investigation into the causes of delay and cost overrun in Uganda’s public sector construction projects.” In Second International Conference on Advances in Engineering and Technology, pp. 305–311.

    Google Scholar 

  • Asiedu, R. O. and WAlfen, H. (2014). “Factors engendering cost misrepresentation of public sector projects in Ghana.” International Journal of Sustainable Construction Engineering and Technology, Vol. 5, No. 2, pp. 13–24.

    Google Scholar 

  • Assaf, S. A. and Al-Hejji, S. (2006). “Causes of delay in large construction projects.” International Journal of Project Management, Vol. 24, No. 4, pp. 349–357, DOI: 10.1016/j.ijproman.2005.11.010.

    Article  Google Scholar 

  • Bondinuba, F. K. (2012). “Exploring the challenges and barriers in accessing financial facilities by small and medium construction firms in Ghana.” Civil and Environmental Research, Vol. 2, No. 6, pp. 25–35.

    Google Scholar 

  • Chan, A. P. and Chan, D. W. (2004). “Developing a benchmark model for project construction time performance in Hong Kong.” Building and Environment, Vol. 39, No. 3, pp. 339–349.

    Article  Google Scholar 

  • Chan, D. W. and Kumaraswamy, M. M. (1997). “A comparative study of causes of time overruns in Hong Kong construction projects.” International Journal of Project Management, Vol. 15, No. 1, pp. 55–63, DOI: 10.1016/S0263-7863(96)00039-7.

    Article  Google Scholar 

  • Chan, D. W. and Kumaraswamy, M. M. (2002). “Compressing construction durations: Lessons learned from Hong Kong building projects.” International Journal of Project Management, Vol. 20, No. 1, pp. 23–35.

    Article  Google Scholar 

  • Chan, D. W., Chan, A. P., Lam, P. T., Yeung, J. F., and Chan, J. H. (2011). “Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry.” International Journal of Project Management, Vol. 29, No. 6, pp. 751–763, DOI: 10.1016/j.ijproman.2010.08.003.

    Article  Google Scholar 

  • Chileshe, N. and Yirenkyi-Fianko, A. B. (2011). “Perceptions of threat risk frequency and impact on construction projects in Ghana: Opinion survey findings.” Journal of Construction in Developing Countries, Vol. 16, No. 2, pp. 115–149.

    Google Scholar 

  • Creedy, G. D., Skitmore, M., and Wong, J. K. (2010). “Evaluation of risk factors leading to cost overrun in delivery of highway construction projects.” Journal of Construction Engineering and Management, Vol. 136, No. 5, pp. 528–537.

    Article  Google Scholar 

  • Doloi, H. (2013). “Cost overruns and failure in project management: understanding the roles of key stakeholders in construction projects.” Journal of Construction Engineering and Management, Vol. 139, No. 3, pp. 267–279, DOI: 10.1061/(ASCE)CO.1943-7862.

    Article  Google Scholar 

  • Eyiah, A. K. and Cook, P. (2003). “Financing small and medium-scale contractors in developing countries: A Ghana case study.” Construction Management and Economics, Vol. 21, No. 4, pp. 357–367. DOI: 10.1080/0144619032000111241.

    Article  Google Scholar 

  • Faridi, A. S. and El-Sayegh, S. M. (2006). “Significant factors causing delay in the UAE construction industry.” Construction Management and Economics, Vol. 24, No. 11, pp. 1167–1176, DOI: 10.1080/01446190600827033.

    Article  Google Scholar 

  • FIDIC (2005). Conditions of contract for construction for building and engineering works designed by employer, Geneva: International Federation of Consulting Engineers.

    Google Scholar 

  • Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.” International Journal of Project Management, Vol. 21, No. 5, pp. 321–326, DOI: 10.1016/S0263-7863(02)00055-8.

    Article  Google Scholar 

  • Fugar, F. D. and Agyakwah-Baah, A. B. (2010). “Delays in building construction projects in Ghana.” Australasian Journal of Construction Economics and Building, Vol. 10, Nos. 1-2, pp. 103–116.

    Article  Google Scholar 

  • Gibson, R. (2008). Construction delays: Extensions of time and prolongation claims, Taylor and Francis Group.

  • Gill, J. and Johnson, P. (2010). Research methods for managers, Sage.

    Google Scholar 

  • Gkritza, K. and Labi, S. (2008). “Estimating cost discrepancies in highway contracts: Multistep econometric approach.” Journal of Construction Engineering and Management, Vol. 134, No. 12, pp. 953–962.

    Article  Google Scholar 

  • Harris, F. and McCaffer, R. (2013). Modern construction management, John Wiley and Sons.

    Google Scholar 

  • Laryea, S. (2010). “Challenges and opportunities facing contractors in Ghana.” In West Africa Built Environment Research (WABER) conference, p. 215.

    Google Scholar 

  • Le-Hoai, L., Dai Lee, Y., and Lee, J. Y. (2008). “Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries.” KSCE Journal of Civil Engineering, Vol. 12, No. 6, pp. 367–377, DOI: 10.1007/s12205-008-0367-7.

    Article  Google Scholar 

  • Memon, A. H., Abdul Rahman, I., Abdullah, M. R., Aziz, A., and Asmi, A. (2011). “Time overrun in construction projects from the perspective of Project Management Consultant (PMC).” Journal of Surveying, Construction and Property (JSCP), Vol. 2, No. 1, pp. 54–66.

    Google Scholar 

  • Odeck, J. (2004). “Cost overruns in road construction-what are their sizes and determinants?.” Transport Policy, Vol. 11, No. 1, pp. 43–53, DOI: 10.1016/S0967-070X(03)00017-9.

    Article  Google Scholar 

  • Ofori, G. (1990). The construction industry: Aspects of its economics and management. NUS Press.

    Google Scholar 

  • Ogunsemi, D. R. and Jagboro, G. O. (2006). “Time-cost model for building projects in Nigeria.” Construction Management and Economics, Vol. 24, No. 3, pp. 253–258.

    Article  Google Scholar 

  • Osei-Tutu, E., Badu, E., and Owusu-Manu, D. (2010). “Exploring corruption practices in public procurement of infrastructural projects in Ghana.” International Journal of Managing Projects in Business, Vol. 3, No. 2, pp. 236–256, DOI: 10.1108/17538371011036563.

    Article  Google Scholar 

  • Rosenfeld, Y. (2013). “Root-cause analysis of construction-cost overruns.” Journal of Construction Engineering and Management, Vol. 140, No. 1, pp. 1–10, DOI: 10.1061/(ASCE)CO 1943-7862.0000789.

    Google Scholar 

  • Sambasivan, M. and Soon, Y. W. (2007). “Causes and effects of delays in Malaysian construction industry.” International Journal of Project Management, Vol. 25, No. 5, pp. 517–526, DOI: 10.1016/j.ijproman. 2006.11.007.

    Article  Google Scholar 

  • Scott, S. (1993). “The nature and effects of construction delays.” Construction Management and Economics, Vol. 11, No. 5, pp. 358–369, DOI: 10.1080/01446199300000040.

    Article  Google Scholar 

  • Tavakol, M. and Dennick, R. (2011). “Making sense of Cronbach’s alpha.” International Journal of Medical Education, Vol. 2, No. 1, p. 53, DOI: 10.5116/ijme.4dfb.8dfd.

    Article  Google Scholar 

  • Trauner, T. J. (2009). Construction delays: Understanding them clearly, analyzing them correctly. Butterworth-Heinemann.

    Google Scholar 

  • Tuuli, M. M., Baiden, B. K., and Badu, E. (2007). “Assessment and enforcement of liquidated damages in construction contracts in Ghana.” Structural Survey, Vol. 25, No. 3/4, pp. 204–219, DOI: 10.1108/02630800710772809.

    Article  Google Scholar 

  • UNCHS (1996). Policies and Measures for Small-Contractor Development in the Construction Industry.

    Google Scholar 

  • Westring, G. (1997). “Ghana public procurement reform, an audit report prepared for the World Bank.” Advokatfirman Cederquist KB, Stockholm.

    Google Scholar 

  • World Bank (2003). Ghana 2003 country procurement assessment Report, Washington, DC.: Ghana Country Department, The World Bank.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Richard O. Asiedu.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Asiedu, R.O., Alfen, H.W. Understanding the underlying reasons behind time overruns of government building projects in Ghana. KSCE J Civ Eng 20, 2103–2111 (2016). https://doi.org/10.1007/s12205-015-0544-4

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-015-0544-4

Keywords

Navigation