Implications of Cost Overruns and Time Delays on Major Public Construction Projects

  • Conference paper
  • First Online:
Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate

Abstract

For decades, the construction industry has been characterized by costs exceeding budgetary limits and completion times reaching further than what was set out initially. This has been particularly noticeable for large public construction projects where cost overruns and time delays have long been regarded a common occurrence. Due to the magnitude and frequency of these overruns, they have come to pose a significant financial risk to both clients and contractors, in addition to the impact exerted on the sustainability of the project. In dealing with this, researchers, auditors and practitioners have suggested a broad range of solutions, ranging from technical and economical to psychological and political approaches. In doing so, the contractor’s role has been emphasized whereas the role of the client organization has often been overlooked. This paper which is based on a literature review investigates the occurrence of and the explanations for cost overruns and time delays in major construction projects from the public client’s perspective. It also explores the implications of cost overruns and time delays; the purpose of which is to offer an extended understanding of the relationship between the client’s actions and effects on cost, time and sustainability parameters.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Abdelgawad M, Fayek A (2010) Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. J Constr Eng Manage 136(9):1028–1036

    Article  Google Scholar 

  • Akinci B, Fischer M (1998) Factors affecting contractors’ risk of cost overburden. J Manage Eng 14(1):67–76

    Article  Google Scholar 

  • Altshuler AA, Luberoff D (2003) Mega-projects: the changing politics of urban public investment. Brookings Institution Press, Washington, United States

    Google Scholar 

  • Anastasopoulos P, Labi S, Bhargava A, Mannering F (2012) Empirical assessment of the likelihood and duration of highway project time delays. J Constr Eng Manage 138(3):390–398

    Article  Google Scholar 

  • Arditi D, Pattanakitchamroon T (2006) Selecting a delay analysis method in resolving construction claims. Int J Project Manage 24(2):145–155

    Article  Google Scholar 

  • Baloi D, Price AD (2003) Modelling global risk factors affecting construction cost performance. Int J Project Manage 21(4):261–269

    Google Scholar 

  • Bhargava A et al (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. J Constr Eng Manage 136(11):1207–1218

    Article  Google Scholar 

  • Bordat C, McCullouch B, Sinha K (2004) An analysis of cost overruns and time delays of INDOT projects. Joint Transportation Research Program, Indiana, USA

    Book  Google Scholar 

  • Brunes F, Lind H (2014) Explaining cost overruns in infrastructural projects: a new framework with applications to Sweden. S-WoPEc 14(1):1–40

    Google Scholar 

  • Cantarelli CC, Flyvbjerg B, Molin EJ, van Wee B (2010) Cost overruns in large-scale transportation infrastructure projects: explanations and their theoretical embeddedness. EJTIR 10(1):5–18

    Google Scholar 

  • Chan DW, Kumaraswamy MM (1997) A comparative study of causes of time overruns in Hong Kong construction projects. Int J Project Manage 15(1):55–63

    Article  Google Scholar 

  • Federal Highway Administration (2004) Megaprojects—they are a different breed. Public Roads 68(1):2–9

    Google Scholar 

  • Flyvbjerg B (2004) Megaprojects and risk: a conversation with Bent Flyvbjerg. Crit Plann 11:51–63

    Google Scholar 

  • Flyvbjerg B (2007) Cost overruns and demand shortfalls in urban rail and other infrastructure. Transport Plan Tech 30(1):9–30

    Google Scholar 

  • Flyvbjerg B, Garbuio M, Lovallo D (2009) Delusion and deception in large infrastructure projects: two models for explaining and preventing executive disaster. Calif Manag Rev 51(2):170–193

    Article  Google Scholar 

  • Flyvbjerg B, Skamris Holm MK, Buhl SL (2003) How common and how large are cost overruns in transport infrastructure projects? Transport Rev 23(1):71–88

    Article  Google Scholar 

  • Gilchrist A, Allouche EN (2005) Quantification of social costs associated with construction projects: state-of-the-art review. Tunn Undergr Space Technol 20(1):89–104

    Article  Google Scholar 

  • Han SH et al (2009) Analyzing schedule delay of mega project: lessons learned from Korea train express. Engineering Management, IEEE Transactions on, 56(2), 243-256. IEEE Trans Eng Manage 56(2):243–256

    Article  Google Scholar 

  • Jahren CT, Ashe AM (1990) Predictors of cost-overrun rates. J Constr Eng Manage 116(3):548–552

    Article  Google Scholar 

  • Josephson PE, Larsson B, Li H (2002) Illustrative benchmarking rework and rework costs in Swedish construction industry. J Manage Eng 18(2):76–83

    Article  Google Scholar 

  • KPMG 2012 Cities infrastructure: a report on sustainability, s.l.: KPMG International Cooperative

    Google Scholar 

  • Kraiem ZM, Diekmann JE (1987) Concurrent delays in construction projects. J Constr Eng Manage 113(4):591–602

    Article  Google Scholar 

  • Kumaraswamy MM, Chan DW (1998) Contributors to construction delays. Constr Manage Econ 16(1):17–29

    Article  Google Scholar 

  • Majid MA, McCaffer R (1998) Factors of non-excusable delays that influence contractors’ performance. J Manage Eng 14(3):42–49

    Article  Google Scholar 

  • Morris S (1990) Cost and time overruns in public sector projects. Econ Political weekly 25(47):154–168

    Google Scholar 

  • Mosey D (2009) Early contractor involvement in building procurement: contracts, partnering and project management. Wiley, UK

    Book  Google Scholar 

  • Odeck J (2004) Cost overruns in road construction—what are their sizes and determinants? Transp Policy 11(1):43–53

    Article  Google Scholar 

  • OECD (2007) Infrastructure to 2030: Mapping policy for electricity, water and transport, vol 2. OECD Publishing, Paris

    Google Scholar 

  • Raftery J (2003) Risk analysis in project management. s.l.:Routledge

    Google Scholar 

  • Randolph DA, Rajendra K, Campfield JJ (1987) Using risk management techniques to control contract costs. J Manage Eng 3(4):314–324

    Article  Google Scholar 

  • Rubin AR (1983) Construction claims: analysis, presentation, defense. Van Nostrand Reinhold, New York

    Google Scholar 

  • Shen LY, Li Hao J, Tam VWY, Yao H (2007) A checklist for assessing sustainability performance of construction projects. J Civil Eng Manage 13(4):273–281

    Google Scholar 

  • Shrestha P, Burns LA, Shields DR (2013) Magnitude of construction cost and schedule overruns in public work projects. J Constr Eng (Article ID 935978)

    Google Scholar 

  • Siemiatycki M (2009) Academics and auditors comparing perspectives on transportation project cost overruns. J Plann Edu Res 29(2):142–156

    Article  Google Scholar 

  • Skamris MK, Flyvbjerg B (1997) Inaccuracy of traffic forecasts and cost estimates on large transport projects. Transport Policy 4(3):141–146

    Google Scholar 

  • The Swedish National Audit Office (2010) Cost control of large road investments? Stockholm, Sweden: RiR 2010:25

    Google Scholar 

  • Wachs M (1989) When planners lie with numbers. J American Plann Assoc 55(4):476–479

    Google Scholar 

  • World Bank (2012) Construction Sector Transparency Program Goes Global. [Online]. Available at: http://www.worldbank.org/en/news/feature/2012/11/08/construction-sector-transparency-program-goes-global. Accessed 14 Aug 2014

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Abderisak Adam .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Adam, A., Josephson, PE., Lindahl, G. (2015). Implications of Cost Overruns and Time Delays on Major Public Construction Projects. In: Shen, L., Ye, K., Mao, C. (eds) Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-46994-1_61

Download citation

Publish with us

Policies and ethics