Abstract

In this research an integrated production-distribution inventory model is developed for a single-vendor single-buyer supply chain system with the consideration of quality inspection errors at the buyer’s end, the buyer’s warehouse has limited capacity and there is an upper bound on the purchase of products. Mathematical modeling is employed in this study for optimizing the replenishment lot-size and total number of deliveries from the vendor to the buyer in one production run with the objective of minimizing integrated expected total cost of the system while satisfying the constraints. We show that the model of this problem is a constrained non-linear programme and propose a simple Lagrangian multiplier algorithmic technique to solve it. The computational effort and time are small for the proposed algorithm and it is simple to implement. A numerical example is given to demonstrate the application and the performance of the proposed methodology. In addition, sensitivity analysis has been carried out to illustrate the behaviors of the proposed model and some managerial insights are also included.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Arora, V., Chan, F.T.S., Tiwari, M.K.: An integrated approach for logistic and vendor managed inventory in supply chain. Expert Systems with Applications 37, 39–44 (2010)

    Article  Google Scholar 

  2. Ben-Daya, M., Rahim, A.: Optimal lot-sizing, quality improvement and inspection errors for multistage production systems. International Journal of Production Research 41, 65–79 (2003)

    Article  MATH  Google Scholar 

  3. Ben-Daya, M., Raouf, A.: On the constrained multi-item single period inventory problem. International Journal of Production Management 13, 104–112 (1993)

    Article  Google Scholar 

  4. Bennett, G.K., Case, K.E., Schmidt, J.W.: Economic effects of inspection error on attribute sampling plans. Naval Research Logistics 21, 431–443 (1974)

    Article  MATH  Google Scholar 

  5. Duffuaa, S.O.: Impact of inspection errors on the performance measures of a complete repeat inspection plan. International Journal of Production Research 34, 2035–2049 (1996)

    Article  MATH  Google Scholar 

  6. Glock, C.H.: The joint economic lot size problem: A review. Int. J. Prod. Econ. 135, 671–686 (2012)

  7. Goyal, S.K., Cardenas-Barron, L.E.: Note on: economic production quantity model for items with imperfect quality-a practical approach. International Journal of Production Economics 77, 85–87 (2002)

    Article  Google Scholar 

  8. Goyal, S.K., Huang, C.K., Chen, H.K.: A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning & Control 14, 596–602 (2003)

    Article  Google Scholar 

  9. Goyal, S.K., Nebebe, F.: Determination of economic production-shipment policy for a single-vendor single-buyer system. European Journal of Operations Research 121, 175–178 (2000)

    Article  MATH  Google Scholar 

  10. Hsu, J.T., Hsu, L.F.: A note on An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Industrial Engineering Computations 3, 695–702 (2012)

    Article  Google Scholar 

  11. Hsu, J.T., Hsu, L.F.: Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns. Computers & Industrial Engineering 64, 389–402 (2013)

    Article  Google Scholar 

  12. Huang, C.K.: An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Production Planning and Control 13, 355–361 (2002)

    Article  Google Scholar 

  13. Huang, C.K.: An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. International Journal of Production Economics 91, 91–98 (2004)

    Article  Google Scholar 

  14. Khan, M., Jaber, M.Y., Abdul-Rahim, A.: An integrated supply chain model with errors in quality inspection and learning in production. Omega 42, 16–24 (2014)

    Article  Google Scholar 

  15. Khan, M., Jaber, M.Y., Bonney, M.: An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics 133, 113–118 (2011)

    Article  Google Scholar 

  16. Maddah, B., Jaber, M.Y.: Economic order quantity for items with imperfect quality: revisited. International Journal of Production Economics 112, 808–815 (2008)

    Article  Google Scholar 

  17. Pandey, A., Masin, M., Prabhu, V.: Adaptive logistic controller for integrated design of distributed supply chains. Journal of Manufacturing Systems 26, 108–115 (2007)

    Article  Google Scholar 

  18. Pasandideh, S.H.R., Niaki, S.T.A., Yeganeh, J.A.: A parameter-tuned genetic algorithm for multi-product economic production quantity model with space constraint, discrete delivery orders and shortages. Advances in Engineering Software 41, 306–314 (2010)

    Article  MATH  Google Scholar 

  19. Pasandideh, S.H.R., Niaki, S.T.A., Nia, A.R.: A genetic algorithm for vendor managed inventory control system of multi-product multi-constraint economic order quantity model. Expert Systems with Applications 38, 2708–2716 (2011)

    Article  Google Scholar 

  20. Salameh, M.K., Jaber, M.Y.: Economic production quantity model for items with imperfect quality. International Journal of Production Economics 64, 59–64 (2000)

    Article  Google Scholar 

  21. Sana, S.S.: A production-inventory model of imperfect quality products in a three-layer supply chain. Decision Support Systems 50, 539–547 (2011)

    Article  Google Scholar 

  22. Sarkar, B., Sana, S. S., Chaudhuri, K.: An imperfect production process for time varying demand with inflation and time value of money - An EMQ model. Expert Systems with Applications 38, 13543–13548 (2011)

    Google Scholar 

  23. Taleizadeh, A.A., Niaki, S.T.A., Barzinpour, F.: Multiple-buyer multiple-vendor multi-product multi-constraint supply chain problem with stochastic demand and variable lead-time: A harmony search algorithm. Applied Mathematics and Computation 217, 9234–9253 (2011)

    Article  MATH  MathSciNet  Google Scholar 

  24. Uthayakumar, R., Priyan, S.: Permissible delay in payments in the two-echelon inventory system with controllable setup cost and lead time under service level constraint. Int. J. Inf. Manag. Sci. 24, 193–211 (2013)

    MathSciNet  Google Scholar 

  25. Uthayakumar, R., Priyan, S.: Pharmaceutical supply chain and inventory management strategies: Optimization for a pharmaceutical company and a hospital. Oper. Res. Health Care 2, 52–64 (2013)

    Article  Google Scholar 

  26. Wang, C.H.: Integrated production and product inspection policy for a deteriorating production system. International Journal of Production Economics 95, 123–134 (2005)

    Article  Google Scholar 

  27. Wee, H.M., Widyadana, G.A.: A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule. Omega 41, 941–954 (2013)

    Article  Google Scholar 

  28. Yan, C., Banerjee, A., Yang, L.: An integrated production-distribution model for a deteriorating inventory item. International Journal of Production Economics 133, 228–232 (2011)

    Article  Google Scholar 

  29. Yan, C., Liao, Y., Banerjee, A.: Multi-product lot scheduling with backordering and shelf-life constraints. Omega 41, 510–516 (2013)

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to S. Priyan.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Priyan, S., Uthayakumar, R. Mathematical Modeling and Computational Algorithm to Solve Multi-Echelon Multi-Constraint Inventory Problem with Errors in Quality Inspection. J Math Model Algor 14, 67–89 (2015). https://doi.org/10.1007/s10852-014-9258-8

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10852-014-9258-8

Keywords

Navigation