Assessment of the seismic damage and usability of the building stock started a few days after the L’Aquila earthquake in order to evaluate the safety conditions of the buildings concerned. Several ordinances of the Prime Minister were issued to regulate the reconstruction process. In particular, based also on damage level, the procedures for repair, strengthening or demolition/reconstruction of residential buildings were established with the definition of relevant state funding. For each damaged building, practitioners engaged by property owners designed repair and strengthening interventions and then computed the corresponding costs. These projects were the technical basis for funding applications that owners submitted to the government. Technical and financial information collected during the approval procedure of such applications allowed compilation of a database regarding 5775 residential buildings damaged by the L’Aquila earthquake. The present study examines the restoration policy and the procedures regulating the reconstruction process of residential property outside city centres. In particular, the data related to the first phase of the reconstruction process (the so-called “light damage” reconstruction) to recover the usability of slightly damaged buildings are illustrated. The discussion focuses on the time-to-approval of funding applications and on the public contributions granted for repair and local strengthening works.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Fig. 16
Fig. 17

Similar content being viewed by others

References

  • Annex to OPCM no. 3790 (2009) Guidelines for the implementation of the measures relative to the Ordinance of the President of the Council of Ministers no. 3790. Indirizzi per l’esecuzione degli interventi di cui all’Ordinanza del Presidente del Consiglio dei Ministri n. 3790 del 9 luglio 2009 (in Italian)

  • Annex to OPCM no. 3779 (2009) Guidelines for the implementation of the measures relative to the Ordinance of the President of the Council of Ministers no. 3779. Indirizzi per l’esecuzione degli interventi di cui all’Ordinanza del Presidente del Consiglio dei Ministri n. 3779 del 6 giugno 2009 (in Italian)

  • Baggio C, Bernardini A, Colozza R, Di Pasquale G, Dolce M, Goretti A, Martinelli A, Orsini G, Papa F, Zuccaro G, Pinto AV, Taucer F (2007) Field manual for post-earthquake damage and safety assessment and short term countermeasures (AeDES). EUR 22868 EN, Joint Research Centre, ISPRA, Italy

  • Circular no. 617 February 2 (2009) Instructions for new construction technical standards in DM 14.01.2008. Istruzioni per l’Applicazione Nuove Norme Tecniche Costruzioni di cui al D.M. 14.01.2008 (in Italian)

  • Decree Law D.L. n. 180 (1998) Converted by amendment into a Law March 30, 1998—”Urgent interventions for the quake-hit areas of the Marche and Umbria regions and other areas affected by natural disasters”. D.L. 30 gennaio 1998, n. 180 convertito con modificazioni in legge 30 marzo 1998, n.61”Ulteriori interventi urgenti in favore delle zone terremotate delle regioni Marche e Umbria e di altre zone colpite da eventi calamitosi” (in Italian)

  • Decree of the Regional Government DGR no. 2153/1998 Methods and procedures for the contributions provided by Art. 4 of Law no. 61/1998 coordinated with the amendments made by the DGR. D.G.R. n.2153/1998 - “Modalità e procedure per la concessione dei contributi previsti dall’art. 4 della L. n. 61/1998 coordinato con le modifiche ed integrazioni apportate dalle D.G.R.” (in Italian)

  • Del Vecchio C, Di Ludovico M, Balsamo A, Prota A, Manfredi G, Dolce M (2014) Experimental investigation on exterior RC beam-column joints retrofitted with FRP systems. ASCE J Compos Constr 18(4):04014002-1–04014002-13

  • Del Vecchio C, Di Ludovico M, Prota A, Manfredi G (2015) Analytical model and design approach for FRP strengthening of non-conforming RC corner beam—column joints. Eng Struct 87(2015):8–20

    Article  Google Scholar 

  • Di Ludovico M, Manfredi G, Mola E, Negro P, Prota A (2008a) Seismic behavior of a full-scale RC structure retrofitted using GFRP laminates. ASCE J Struct Eng 134(5):810–821

    Article  Google Scholar 

  • Di Ludovico M, Prota A, Manfredi G, Cosenza E (2008b) Seismic strengthening of an under-designed RC structure with FRP. Earthq Eng Struct Dyn 37:141–162

    Article  Google Scholar 

  • Di Ludovico M, Prota A, Moroni C, Manfredi G, Dolce M (2016) Reconstruction process of damaged residential buildings outside historical centres after the L’Aquila earthquake—part II: “Heavy Damage” Reconstruction. Bull Earthq Eng (under review)

  • Dolce M, Di Pasquale G, Albanese V, Benetti D, Bramerini F, Coppari S, Corina A, De Rosa G, De Sortis A, Emili P, Ferlito R, Filippi L, Giordano F, Goretti A, Lo Presti T, Lucantoni A, Mercuri M, Moroni C, Orlandi N, Paoli G, Papa F, Pizza A, Procida F, Rinaldelli M, Sergio S, Severino M, Speranza E, Veschi A, Zambonelli E, Manfredi G, Di Ludovico M, Palermo G, Prota A, Verderame G, Corazza L, Cifani G, Mannella A, Martinelli A (2009) Quick surveys: post-earthquake usability inspections. Progettazione Sismica, no. 3

  • DPC (Civil Protection Department) and ReLUIS (Laboratories University Network of Seismic Engineering) (2011) Guidelines for repair and strengthening of structural elements, infill and partitions by Dolce M, Manfredi G. Doppiavoce Dec. 2011, ISBN 978-88-89972-29-8. Linee guida per riparazione e rafforzamento di elementi strutturali, tamponature e partizioni (in Italian)

  • Frascadore R, Di Ludovico M, Prota A, Verderame GM, Manfredi G, Dolce M, Cosenza E (2015) Local strengthening of RC structures as a strategy for seismic risk mitigation at regional scale. Earthq Spectra 31(2):1083–1102

    Article  Google Scholar 

  • Law L. n.32 (1992) Provisions for reconstruction in areas covered by the Law for the interventions in the areas of Campania, Basilicata, Puglia and Calabria affected by the earthquake of November 1980, February 1981 and March 1982, approved by Legislative Decree 30 March, 1990, no. 76. L. 23 gennaio 1992, n. 32. “Disposizioni in ordine alla ricostruzione nei territori di cui al testo unico delle leggi per gli interventi nei territori della Campania, Basilicata, Puglia e Calabria colpiti dagli eventi sismici del novembre 1980, del febbraio 1981 e del marzo 1982”, approvato con decreto legislativo 30 marzo 1990, n. 76 (in Italian)

  • Legislative Decree D.Lgs no. 76 (1990) Law for the interventions in the areas of Campania, Basilicata, Puglia and Calabria affected by the earthquake of November 1980, February 1981 and March 1982. D.Lgs 30 marzo 1990, n. 76“Testo unico delle leggi per gli interventi nei territori della Campania, Basilicata, Puglia e Calabria colpiti dagli eventi sismici del novembre 1980, del febbraio 1981 e del marzo 1982 (in Italian)

  • Ministerial Decree D.M. (2008) New Technical Standards for Construction. D.M. 14.01.2008 “Norme Tecniche per le Costruzioni” (in Italian)

  • Ordinance of the President of the Council of Ministers, OPCM no. 3779 (2009) Urgent interventions to deal with seismic events occurring in the Abruzzo region on April 6, 2009 and other urgent civil protection provisions, published in the Official Journal no. 132 of 10 June 2009. OPCM n. 3779 del 6 giugno 2009”Ulteriori interventi urgenti diretti a fronteggiare gli eventi sismici verificatisi nella regione Abruzzo il giorno 6 aprile 2009 e altre disposizioni urgenti di protezione civile”, Pubblicata nella Gazzetta Ufficiale n. 132 del 10 giugno 2009” (in Italian)

  • Ordinance of the President of the Council of Ministers, OPCM no. 3790 (2009) Urgent interventions to deal with seismic events occurring in the Abruzzo region on April 6, 2009 and other urgent civil protection provisions, published in the Official Journal no. 166 of 20 July 2009. OPCM n. 3790 del 9 luglio” Ulteriori interventi urgenti diretti a fronteggiare gli eventi sismici verificatisi nella regione Abruzzo il giorno 6 aprile 2009 e altre disposizioni urgenti di protezione civile”, Pubblicata nella Gazzetta Ufficiale n. 166 del 20 luglio 2009 (in Italian)

  • Ordinance of the President of the Council of Ministers, OPCM no. 3803 (2009) Urgent interventions to deal with seismic events occurring in the Abruzzo region on April 6, 2009 and other urgent civil protection provisions, published in the Official Journal no. 193 of 21 August 2009. OPCM no. 3803 of 15 August 2009”Ulteriori interventi urgenti diretti a fronteggiare gli eventi sismici verificatisi nella regione Abruzzo il giorno 6 aprile 2009 e altre disposizioni urgenti di protezione civile”, Pubblicata nella Gazzetta Ufficiale n. 193 del 21 Agosto 2009 (in Italian)

  • Ordinance of the President of the Council of Ministers, OPCM no. 3827 (2009) 2009—Urgent interventions to deal with seismic events occurring in the Abruzzo region on April 6, 2009 and other urgent civil protection provisions, published in the Official Journal no. 284 of 5 December 2010. OPCM n. 3827 del 27 novembre 2009”Ulteriori interventi urgenti diretti a fronteggiare gli eventi sismici verificatisi nella regione Abruzzo il giorno 6 aprile 2009 e altre disposizioni urgenti di protezione civile”, Pubblicata nella Gazzetta Ufficiale n. 284 del 5 Dicembre 2009 (in Italian)

  • Ordinance of the President of the Council of Ministers, OPCM no. 3881 (2010) Urgent interventions to deal with seismic events occurring in the Abruzzo region on April 6, 2009 and other urgent civil protection provisions, published in the Official Journal no. 142 of 24 June 2010. OPCM n. 3881 del 11 giugno 2010”Ulteriori interventi urgenti diretti a fronteggiare gli eventi sismici verificatisi nella regione Abruzzo il giorno 6 aprile 2009 e altre disposizioni urgenti di protezione civile”, Pubblicata nella Gazzetta Ufficiale n. 142 del 24 Giugno 2010 (in Italian)

  • Severino M, Di Pasquale G (2002) Procedures for the post-earthquake reconstruction: analysis and proposals. Alinea. Procedure per la ricostruzione post-sisma: analisi e proposte (in Italian)

Download references

Acknowledgments

The activity reported in the paper were carried out in the framework of contracts between ReLUIS and the Government Institutions in charge of the reconstruction of L’Aquila and other municipalities hit by the earthquake of April 6, 2009. The collaboration of Fintecna and Cineas is acknowledged as partners of ReLUIS in the activities described in the paper. This study was partially performed in the framework of the PE 2014–2016 joint programme DPC-ReLUIS.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Marco Di Ludovico.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Di Ludovico, M., Prota, A., Moroni, C. et al. Reconstruction process of damaged residential buildings outside historical centres after the L’Aquila earthquake: part I—"light damage" reconstruction. Bull Earthquake Eng 15, 667–692 (2017). https://doi.org/10.1007/s10518-016-9877-8

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10518-016-9877-8

Keywords

Navigation