Grouting is one of the most popular methods used to control water leakage in dam constructions. The geological and engineering geological properties of the rock/soil to be grouted are important parameters influencing the design of the grouting. In this study, the geotechnical properties of Deriner Dam’s foundation rock and the grouting procedure used for it were investigated to ascertain its suitability for grouting. Detailed investigations were conducted to unravel the reasons for and types of foundation grouting applications used on the main rock in Deriner Dam. The materials used in the grouting and the grouting pressures employed were investigated onsite, and the results obtained are presented in this paper.

Résumé

Jointoiement est une des méthodes les plus populaires utilisés pour contrôler les fuites d'eau dans les constructions de barrages. Les propriétés géologiques géologiques et d'ingénierie de la roche / sol à cimentés sont des paramètres importants qui influent sur la conception de l'injection. Dans cette étude, les propriétés géotechniques de la roche de fondation Deriner Dam et la procédure coulis utilisé pour cela ont été étudiés pour déterminer son aptitude pour le jointoiement. Des enquêtes approfondies ont été menées pour éclaircir les causes et les types d'applications utilisées coulis fondation sur le rocher principal barrage Deriner. Les matériaux utilisés pour les joints et les pressions d'injection utilisés ont été étudiés sur place, et les résultats obtenus sont présentés dans le présent document

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1

Similar content being viewed by others

References

  • Alkaya D, Yesil B (2011) Grouting applications of grout curtains in Cindere dam and hydroelectric power plant. Sci Res Essays 6(19):4039–4047

    Google Scholar 

  • Basarir H, Ozsan A, Karakus M (2005) Analysis of support requirements for a shallow diversion tunnel at Guledar dam site, Turkey. Eng Geol 81:131–145

    Article  Google Scholar 

  • Cekerevac C, Wohnlich A, Bellwald PH (2008) Deriner hydropower scheme—geotechnical Issues and the particular case of the spillway tunnels design and construction. Stucky Ltd., Renens

  • Deriner Dam and HEPP Engineers Consortium (2010) Deriner Dam and HEPP: dam foundation and curtain grouting report no. 1. Deriner Dam and HEPP Engineers Consortium,

  • DOLSAR Engineering Ltd., Electrowatt Engineering Services Ltd. (1991) Deriner Dam and Hydroelectric Power Plant (design report), vol. 1–2–3. DOLSAR Engineering Ltd./Electrowatt Engineering Services Ltd., Ankara/Riyadh

  • DSI (1993) Boring and grout technical specifications. General Directorate of State Hydraulic Works (DSI), Ankara

  • DSI (2006) Letter no. B.15.1.DSI.1.26.01.00-515-112-1553, dated 9 Feb 2006. General Directorate of State Hydraulic Works (DSI), Ankara

  • DSI (2008) Letter no. B.18.1.DSI.1.26.06.01-604-10064, dated 19 Feb 2008. General Directorate of State Hydraulic Works (DSI), Ankara

  • DSI (2009) Letter no. B.18.1.DSI.1.26.06.01-114.02.01-36321, dated 30 April 2009. General Directorate of State Hydraulic Works (DSI), Ankara

  • EIEI (1991) Aşağı Coruh havzası Deriner barajı yeri mühendislik jeolojisi raporu. EIEI, (in Turkish)

  • Electrowatt Engineering Services Ltd. (1989) Deriner dam and hydroelectric power plant, Zurih Rapor no. 89-28. Electrowatt Engineering Services Ltd., Riyadh

  • Erg Engineering Ltd. (2008) Letter no. DER:17.20/7033-19254: Method statement for drilling and grouting works, rev. 01. Erg Engineering Ltd.,

  • Erg Engineering Ltd. (2009) Letter no. DER:17.20/8227-22441: Method statement for contact and consolidation grouting from galleries, 180.50 and 190.50. Erg Engineering Ltd.,

  • Gattinger TE (1955) Bericht über geologische aufnahmearbeiten im gebiete zwischen Coruh und Erzurum, Nordost Turkei. Rep. no. 2379. MTA., Ankara

  • Gattinger TE (1956) Bericht über geologische aufnahmeerganzungs und revisionsarbeiten in den ostpontiden im bereich von vilayet Trabzon, Rize, Gumushane, Erzurum, Artvin und Kars. Rep. no. 2380. MTA, Ankara

  • Ghobadi MH, Khanlari GR, Djalali H (2005) Seepage problems in the right abutment of the Shahid Abbaspour Dam, southern Iran. Eng Geol 82:119–126

    Article  Google Scholar 

  • Kocbay A, Kilic R (2006) Engineering geological assessment of the Obruk dam site (Corum, Turkey). Eng Geol 87:141–148

    Article  Google Scholar 

  • Muller O (2009) Open air excavations at Deriner dam. Int Water Power Dam Constr (17 Mar):18–22

  • Nusier OK, Alawneh AS, Malkawi AH (2002) Remedial measures to control seepage problems in the Kafrein Dam, Jordan. Bull Eng Geol Environ 16:145–152

    Google Scholar 

  • Romanov D, Gabrovsek F, Dreybrodt W (2003) Dam sites in soluble rocks: a model of increasing leakage by dissolution widening of fractures beneath a dam. Eng Geol 70:17–35

    Article  Google Scholar 

  • Stucky Consulting Engineers Ltd (2001) Deriner dam and hydroelectric power plant project Turkey. Stucky Ltd., Renens

  • Stucky Consulting Engineers Ltd. (2006) Dam consolidation grouting and grout curtain design method of work and site installations. Stucky Ltd., Renens

  • Stucky Consulting Engineers Ltd. (2006) Dam and appurtenant structures foundation grouting. Stucky Ltd., Renens

  • Tekson Engineering Ltd. (2007) Deriner barajı perde enjeksiyonu test calısmaları. Tekson Engineering Ltd., (in Turkish)

  • Turkmen S (2003) Treatment of the seepage problems at Kalecik Dam (Turkey). Eng Geol 68:159–169

    Article  Google Scholar 

  • Uromeihy A, Barzegari G (2007) Evaluation and treatment of seepage problems at Chapar-Abad Dam, Iran. Eng Geol 91:219–228

    Article  Google Scholar 

  • Uromeihy A, Farrokhi R (2012) Evaluating groutability at the Kamal-Saleh dam based on Lugeon tests. Bull Eng Geol Environ 71:215–219

    Article  Google Scholar 

  • Wieland M, Aemmer M, Ruoss R (2008) Design aspects of Deriner dam. Int Water Power Dam Constr 60(7):19–23

    Google Scholar 

Download references

Acknowledgments

The author wishes to thank the owner of the Deriner Dam Project, the General Directorate of State Hydraulic Works (DSI), the Ministry of Environment and Forestry of Turkey, Dolsar Engineering Ltd., Erg Engineering Ltd., Electrowatt Engineering Services Ltd., Stucky Consulting Engineers Ltd., and TEKSON engineers for providing the field data.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mehmet Özçelik.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Özçelik, M. Foundation consolidation grouting applications in Deriner Dam and Hydroelectric Power Plant (Artvin, Turkey). Bull Eng Geol Environ 73, 493–498 (2014). https://doi.org/10.1007/s10064-013-0547-7

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10064-013-0547-7

Keywords

Mots clés

Navigation