Single-minute exchange of die (SMED): a state-of-the-art literature review

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

Competitive companies which are guided by the productivity enhancement employ the lean tools such as single-minute exchange of die (SMED) to reduce the setup time. This study presents a review of the state-of-the-art literature including 130 articles related to single-minute exchange of die and proposes a classification and analysis of the reviewed works. The classification was based on categories, areas, research methods, tools, implementation, results, and countries. This review emphasizes lean tools within the single-minute exchange of die technique. To this end, the study allows dissemination of the knowledge gained from the literature on single-minute exchange of die, and it presents the classified articles that used the Shingo stages in the implementation of the setup reduction.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Shingo S (1985) A revolution in manufacturing. In: The SMED System. Productivity Press, Cambridge, MA

    Google Scholar 

  2. Gest G, Culley SJ, McIntosh RI, Mileham AR, Owen GW (1995) Review of fast tool change systems. Computer Integrated Manufacturing Systems 8(3):205–210

    Article  Google Scholar 

  3. Dave Y, Sohani N (2012) Single minute exchange of dies: literature review. Int J of Lean Thinking 3(2):1–11

    Google Scholar 

  4. Joshi RR, Naik GR Reduction in setup time by SMED. A literature review. Int J of Modern Eng Res (IJMER) 2(1):442–444

  5. Godina R, Pimentel C, Silva FJG, Matias JCO (2018) A structural literature review of the single minute exchange of die: the latest trends. Procedia Manuf 17:783–790

    Article  Google Scholar 

  6. Jain A, Bhatti R, Singh H (2014) Total productive maintenance (TPM) implementation practice. A literature review and directions. Int J of Lean Six Sigma 5(3):293–323

    Article  Google Scholar 

  7. Lage Junior M, Godinho Filho M (2010) Variations of the kanban system: literature review and classification. Int J Prod Econ 125:13–21

    Article  Google Scholar 

  8. Rowley J, Slack F (2004) Conducting a literature review. Management Research News 27(6):31–39

    Article  Google Scholar 

  9. Tranfield DR, Denyer D, Smart P (2003) Towards a methodology for developing evidence-informed management knowledge by means of systematic review. British J of Manag 14:207–222

    Article  Google Scholar 

  10. Godinho Filho M, Saes EV (2013) From time-based competition (TBC) to quick response manufacturing (QRM): the evolution of research aimed at lead time reduction. Int J Adv Manuf Technol 64(5–8):1177–1191

    Article  Google Scholar 

  11. Bhamu J, Sangwan KS (2014) Lean manufacturing: literature review and research issues. Int J Oper Prod Manag 34(7):876–940

    Article  Google Scholar 

  12. Abraham A, Ganapathi KN, Motwani K (2012) Setup time reduction through SMED technique in a stamping production line. Sas Tech Journal 11(2):47–52

    Google Scholar 

  13. Adanna IW, Shantharam A (2013) Improvement of setup time and production output with the use of single minute exchange of die principles (SMED). Int J Eng Res (4):274–277

  14. Afshar-Nadjafi B, Mahyar Majles M (2014) Resource constrained project scheduling problem with setup times after preemptive processes. Comput Chem Eng 69:16–25

    Article  Google Scholar 

  15. Allahverdi A, Gupta JND, Aldowaisana T (1999) A review of scheduling research involving setup considerations, Omega. Int J Mgmt Sci 27:219–239

    Google Scholar 

  16. Almomani MA, Aladeemy M, Abdelhadi A, Mumani A (2013) A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques. Comput Ind Eng 66:461–469

    Article  Google Scholar 

  17. Alp O, Huh WT, Tan T (2015) Inventory control with multiple setup costs. M&SOM 16(1):89–103

    Article  Google Scholar 

  18. Alves JM, Reis MEP (2005) Proposal of a method to use the DMAIC to reduce the setup time. Inst Tec de Aeronáutica:1–9

  19. Arnaout JP (2014) Rescheduling of parallel machines with stochastic processing and setup times. J Manuf Syst 33:376–384

    Article  Google Scholar 

  20. Balon P, Buchtová J (2015) Application of SMED methodology in deep drawn stamping. Metal Brno Czech Republic 1:1–7

    Google Scholar 

  21. Benjamin SJ, Murugaiah U, Marathamuthu MS (2013) The use of SMED to eliminate small stops in a manufacturing firm. J Manuf Technol Manag 24(5):792–807

    Article  Google Scholar 

  22. Bevilacqua M, Ciarapica FE, De Sanctis I, Mazzuto G, Paciarotti CA (2015) Changeover time reduction through an integration of lean practices: a case study from pharmaceutical sector. Assem Autom 35(1):22–34

    Article  Google Scholar 

  23. Bharath R, Lokesh AC (2008) Lead time reduction of component manufacturing through quick changeover (QCO). Sas Tech Journal 7(2):13–19

    Google Scholar 

  24. Cakmakci M (2009) Process improvement: performance analysis of the setup time reduction-SMED in the automobile industry. Int J Adv Manuf Technol 41:68–179

    Article  Google Scholar 

  25. Cakmakci M, Karasu MK (2007) Set-up time reduction process and integrated predetermined time system MTM-UAS: A study of application in a large size company of automobile industry. Int J Adv Manuf Technol 33:334–344

    Article  Google Scholar 

  26. Chiarini A (2014) Sustainable manufacturing-greening processes using specific lean production tools: an empirical observation from European motorcycle component manufacturers. J Clean Prod 85:226–233

    Article  Google Scholar 

  27. Conceição SV, Rodrigues IA, Azevedo AA, Almeida JF, Ferreira F, Morais A (2009) Development and implementation of a SMED methodology in contract manufacturing environments. Gest Prod 16(3):357–369

    Article  Google Scholar 

  28. Culley SJ, Owen GW, Mileham AR, McIntosh RI (2003) Sustaining changeover improvement. Proc Inst Mech Eng B J Eng Manuf 217(10):1455–1470

    Article  Google Scholar 

  29. Dave Y, Sohani N (2010) Reducing setup time through single minute exchange of dies: a case study. Int J of Eng Research & Ind Appls 3(3):125–134

    Google Scholar 

  30. Dave Y, Sohani N (2015) Reducing setup time through Kobetsu Kaizen and SMED methodology: a case study. The Journal for Practising Managers 39(2):47–54

    Google Scholar 

  31. Deif AM, ElMaraghy H (2014) Impact of dynamics capacity policies on WIP level in mix leveling lean environment. Procedia CIRP 17:404–409

    Article  Google Scholar 

  32. Deros BM, Mohamad D, Idris MHM, Rahman MNA, Ghani JA, Ismail AR (2011a) Cost saving in an automotive battery assembly line using setup time reduction. Recent Researches in Multimedia Systems, Signal Processing, Robotics, Control and Manufacturing Technology 1:144–148

    Google Scholar 

  33. Deros BM, Mohamad D, Idris MHM, Rahman MNA, Ghani JA, Ismail AR (2011b) Setup time reduction in an automotive battery Assembly Line. AIJSTPME 4(2):9–13

    Google Scholar 

  34. Desai MS, Rawani AM (2017) Productivity improvement of shaping division of an automobile industry by using single minute exchange of die (SMED) methodology ARPN. J Eng Appl Sci 12(8):2615–2629

    Google Scholar 

  35. Dhake R, Rajebhosale V (2013) Setup time reduction on solder printing machine: a case study. Int J of Lean Thinking 4(1):90–97

    Google Scholar 

  36. Dhankhar A, Kumar S (2016) Improving line efficiency & SMED study. International Journal of Engineering Research & Technology 5(05):134–138

    Google Scholar 

  37. Díaz-Reza JR, García-Alcaraz JL, Martínez-Loya V, Blanco-Fernández J, Jiménez-Macías E, Avelar-Sosa L (2016) The effect of SMED on benefits gained in maquiladora industry. Sustainability 8(1237):1–18

    Google Scholar 

  38. Faccio M (2015) Setup time reduction: SMED-balancing integrated model for manufacturing systems with automated transfer. IJET 5(5):4075–4084

    Google Scholar 

  39. Ferradás PG, Salonitis K (2013) Improving changeover time: a tailored SMED approach for welding Cells. Procedia CIRP 7:598–603

    Article  Google Scholar 

  40. Fogliatto FS, Fagundes PRM (2003) Rapid exchange of tools: method steps and case study. Gest Prod 10(2):163–181

    Article  Google Scholar 

  41. Gade PA, Chavan RG, Dhananjay N, Bhavsar DN (2016) Reduction in setup time by single minute exchange of dies (SMED) methodology. Int J Sci Technol Res 5(6):364–366

    Google Scholar 

  42. Gaikwad SP, Avhad SS, Pawar SS, Thorat PR (2015) Reduction in setup time on rubber moulding machine using SMED technique. Int Journal of Scientific & Technology Research 4(4):169–173

    Google Scholar 

  43. Gavali R, Chavan S, Dongre GG (2016) Set-up time reduction of a manufacturing line using SMED technique. Int J Res Eng Technol 3(7):1748–1750

    Google Scholar 

  44. Gilmore M, Smith DJ (1996) Set-up reduction in pharmaceutical manufacturing: an action research study. IJOPM 16(3):4–17

    Article  Google Scholar 

  45. Hales, DN, Chakravorty, SS (2008) An implementation of the Shingo system, College of Business Administration University of Rhode Island, 1–28

  46. Jagtap NS, Ugale VD, Kadam MM, Kamble SS, Salve AV (2015) Setup time reduction of machine using SMED technique and lean manufacturing. Tecn Research Organizational India 1(2):6202–6216

    Google Scholar 

  47. Joshi RR, Naik GR (2012) Application of SMED methodology- a case study in small scale industry. IJSRP 2(8):2250–3153

    Google Scholar 

  48. Karasu MK, Cakmakci M, Cakiroglu MB, Ayva E, Demirel-Ortabas N (2014) Improvement of changeover times via Taguchi empowered SMED/case study on injection molding production. Measurement 47:741–748

    Article  Google Scholar 

  49. Karim R (2013) Impact of changeover time on productivity: a case study. IJET 13(06):46–52

    Google Scholar 

  50. Karwasz A, Chabowski P (2016) Productivity increase through reduced changeover time. Journal of Machine Engineering 16(2):61–70

    Google Scholar 

  51. Kentli A, Dal V, Alkaya AF (2013) Minimizing machine changeover time in product line in an apparel industry. Tekstil Konfeksiyon 23(2):159–167

    Google Scholar 

  52. King PL (2009) SMED in the process industries. Industrial Engineering Mag:1–8

  53. Kumar V, Bajaj A (2015) The implementation of single minute exchange of die with 5’S in machining processes for reduction of setup time. Int J on Recent Technologies in Mechanical and Electrical Engineering 2(2):32–39

    Google Scholar 

  54. Kumaresan KS, Saman MZM (2011) Integration of SMED and Triz in improving productivity at semiconductor industry. Jurnal Mekanikal 33:40–55

    Google Scholar 

  55. Low S, Chong S, Sim H, Razalli S, Kamaruddin S (2014) Measurement of overall performance effectiveness in setup improvement. J Ind Eng 2014:1–7

    Google Scholar 

  56. Lozano J, Saenz-Díez JC, Martínez E, Jiménez E, Blanco J (2017) Methodology to improve machine changeover performance on food industry based on SMED. Int J Adv Manuf Technol 90:3607–3618

    Article  Google Scholar 

  57. McIntosh R, Culley S, Gest G, Mileham T, Owen G (1996) An assessment of the role of design in the improvement of changeover performance. Int J Oper Prod Manag 16(9):5–22

    Article  Google Scholar 

  58. McIntosh R, Culley S, Gest G, Mileham T, Owen G (2000) A critical evaluation of Shingo’s ‘SMED’ (single minute exchange of die) methodology. Int J Prod Res 38(11):2377–2395

    Article  MATH  Google Scholar 

  59. McIntosh R, Owen G, Culley S, Mileham T (2001) Changeover improvement: a maintenance perspective. Int J Prod Econ 73:153–163

    Article  Google Scholar 

  60. McIntosh R, Owen G, Culley S, Mileham T (2007) Changeover improvement: reinterpreting Shingo’s “SMED” methodology. IEEE Trans Eng Manag 54(1):98–110

    Article  Google Scholar 

  61. Morales Méndez JD, Silva Rodríguez R (2016) Set-up reduction in an interconnection axle manufacturing cell using SMED. Int J Adv Manuf Technol 84:1907–1916

    Article  Google Scholar 

  62. Mezentsev MY, Shabis AG (2014) The repairs project as a tool for improving the productivity of equipment. Metallurgist 58(5–6):545–548

    Article  Google Scholar 

  63. Mileham AR, Culley SJ, McIntosh RI, Gest GB, Owen GW (1997) Set-up reduction (SUR) beyond total productive maintenance (TPM). Proc Inst Mech Eng B J Eng Manuf 211(4):253–260

    Article  Google Scholar 

  64. Mileham AR, Culley SJ, Owen GW, McIntosh RI (1999) Rapid changeover a pre-requisite for responsive manufacture. IJOPM 19(8):785–796

    Article  Google Scholar 

  65. Mileham AR, Culley SJ, Owen GW, Newnes LB, Giess MD, Bramley AN (2004) The impact of run-up in ensuring rapid changeover. CIRP Ann Manuf Technol 53(1):407–410

    Article  Google Scholar 

  66. Mohamad EB, Ito T (2013) Integration of e-learning and simulation to user training programme of SMED. IJIMS 3(2):121–125

    Article  Google Scholar 

  67. Moreira AC, Pais GCS (2011) Single minute exchange of die. A case study implementation. J Technol Manag Innov 6(1):129–146

    Article  Google Scholar 

  68. Moxham C, Greatbanks R (2001) Prerequisites for the implementation of the SMED methodology. A study in a textile processing Environment. Int J of Quality & Reliability Manag 18(4):404–414

    Article  Google Scholar 

  69. Natholia R, Gupta HK, Mishra P, Mishra Y (2017) Study of SMED methodology and its systematic procedure of implementation. Int Journal of Interdisciplinary Research 3(1):1–5

    Google Scholar 

  70. Neumann CSR, Ribeiro JLD (2004) Supply chain development: a case study applying the single minute exchange of die technique. Revista Produção 14(1):44–53

    Google Scholar 

  71. Nithin S, Ganapathi KN (2001) Reducing setup time through SMED technique in a die casting production line. Sas Tech 10(2):63–69

    Google Scholar 

  72. Patel M, Kapadia R, Joshi G (2016) Improvement of overall equipment effectiveness of CNC lathe machine. IJESC 6(11):3491–3494

    Google Scholar 

  73. Patel S, Shaw P, Dale BG (2001) Set-up time reduction and mistake proofing methods. A study of application in a small company. BPMJ 7(1):65–75

    Google Scholar 

  74. Pawar GJ, Sirdeshpande NS, Atram AB, Patil PR (2014) Reduction in setup change time of a machine in a bearing manufacturing plant using SMED and ECRS. Int J Engine Res 3(5):321–323

    Article  Google Scholar 

  75. Perinic M, Ikonic M, Maricic S (2009) Die casting process assessment using single minute exchange of dies (SMED) method. Metabk 48(3):199–202

    Google Scholar 

  76. Pinjar MVN, Shivakumar S, Patil GV (2015) Productivity improvement through single minute exchange of die (SMED) technique. IJSRP 5(7):1–9

    Google Scholar 

  77. Posteucă A, Zapciu M (2015) Setup time and cost reduction in conditions of low volume and overcapacity. UPB Sci Bull 77(4):325–336

    Google Scholar 

  78. Pratsini E (1998) Learning complementarity and setup time reduction. Computers Ops Res 25(5):397–405

    Article  MATH  Google Scholar 

  79. Priyanka S, Shilpa M (2015) Single minute exchange of die in coil manufacturing unit. IJSETR 4(6):2174–2178

    Google Scholar 

  80. Raikar N (2015) A reduction in setup time by SMED methodology: a case study. International Journal of Latest Trends in Engineering and Technology 5(4):56–60

    Google Scholar 

  81. Ram K, Kumar S, Singh DP (2015) Industrial benefits from a SMED methodology on high speed press in a punching machine: a review. Adv Appl Sci Res 6(9):38–41

    Google Scholar 

  82. Reik MP, Mcintosh RI, Culley SJ, Mileham AR, Owen GW (2006a) A formal design for changeover methodology. Part 1: methodology and case study. Proc Inst Mech Eng B J Eng Manuf 220(8):1225–1235

    Article  Google Scholar 

  83. Reik MP, Mcintosh RI, Culley SJ, Mileham AR, Owen GW (2006b) A formal design for changeover methodology. Part 2: methodology and case study. Proc Inst Mech Eng B J Eng Manuf 220(8):1237–1247

    Article  Google Scholar 

  84. Reik MP, Mcintosh RI, Culley SJ, Mileham AR, Owen GW (2006c) Design for changeover (DFC): enabling the design of highly flexible, highly responsive manufacturing processes. International Series in Operations Research and Management Science 87:111–136

    Article  Google Scholar 

  85. Reis MEP, Alves JM (2010) A method for the calculation of economic benefits and development of setup time reduction strategies. Gest Prod 17(3):579–588

    Article  Google Scholar 

  86. Restrepo Correa JH, Medina VPD, Cruz TE (2009) A. How to reduce setup time. Scientia Et Technica xv(41):177–180

    Google Scholar 

  87. Ribeiro D, Braga F, Sousa R, Carmo-Silva S (2011) An application of the SMED methodology in an electric power controls company. Romanian Review Precision Mechanics, Optics and Mecatronics 40:115–122

    Google Scholar 

  88. Saravanan R, Mothilal K (2015) Coalesce of automation and SMED to enhance SUR–a case study. Int J of Science and Research 6(5):1–5

    Google Scholar 

  89. Shinde S, Jahagirdar S, Sane S, Karandikar V (2014) Set-up time reduction of a manufacturing line using SMED technique. Int J Adv Man Tech 2(2):50–53

    Google Scholar 

  90. Singh BJ, Khanduja D (2010) Reflective practice SMED: for quick changeovers in foundry SMEs. Int J Product Perform Manag 59(1):98–116

    Article  Google Scholar 

  91. Smalley A (2007) Brief history of set-up reduction how the work of many people improved modern manufacturing. Art of Lean:1–11

  92. Sousa RM, Lima RL, Carvalho JD, Alves AC (2009) An industrial application of resource constrained scheduling for quick changeover. IEEE 4244:189–193

    Google Scholar 

  93. Stadnicka D (2015) Setup analysis: combining SMED with other tools. Management and Production Engineering Review 6(1):36–50

    Article  Google Scholar 

  94. Sugai M, McIntosh RI, Novaski O (2007) Shingo’s methodology (SMED): critical evaluation and case study. Gest Prod 14(2):323–335

    Article  Google Scholar 

  95. Trovinger SC, Bohn RE (2005) Setup time reduction for electronics assembly: combining simple (SMED) and IT-based methods. Prod Oper Manag 14(2):1–15

    Google Scholar 

  96. Ulutas B (2011) An application of SMED methodology, World Academy of Science, Engineering and Technology. International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering 5(7)

  97. Van Goubergen D, Van Landeghem H (2002) Rules for integrating fast changeover capabilities into new equipment design. Robot Comput Integr Manuf 18:205–214

    Article  Google Scholar 

  98. Boran S, Ekincioğlu C (2017) A novel integrated SMED approach for reducing setup time. Int J Adv Manuf Technol 92:3941–3951

    Article  Google Scholar 

  99. Braglia M, Frosolini M, Gallo M (2017) SMED enhanced with 5-whys analysis to improve set-up reduction programs: the SWAN approach. Int J Adv Manuf Technol 90:1845–1855

    Article  Google Scholar 

  100. Ibraim MA, Mohamad E, Arzmi MH, Rahman AAA, Saptari A, Shibghatullah AS, Sulaiman MA, Ali MAM (2015) Enhancing efficiency of die exchange process through single minute of exchanging die at a textile manufacturing company in Malaysia. J Appl Sci 15(3):456–464

    Article  Google Scholar 

  101. Lintilä J, Takala J (2013) Reducing time losses in operational actions of a food production lines. Manag Prod Eng Rev 4(2):78–88

    Google Scholar 

  102. Garg G, Gupta A, Mor RS, Trehan R (2016) Execution of single minute exchange of die on corrugation machine in cardboard box manufacturing company: a case study. Int J Lean Enterp Res 2(2):133–145

    Article  Google Scholar 

  103. Sayem A, Islam MA, Khan M (2014) Productivity enhancement through reduction of changeover time by implementing SMED technique – in furniture industry. Int J Ind Syst Eng 17(1):15–33

    Google Scholar 

  104. Singh BJ, Khanduja D (2011) Design for set-ups: a step towards quick changeovers in foundries. Int J Sustain Des 1(4):402–422

    Google Scholar 

  105. Singh BJ, Khanduja D (2012) Risk management in complex changeovers through CFMEA: an empirical investigation. Int J Ind Syst Eng 10(4):470–494

    Google Scholar 

  106. Bartz T, Siluk JCM, Riffel ET (2013) Use of single-minute exchange of die – SMED – as a strategy to increase productivity in a plastic bottle labeler. Tecno-Lóg 16(2):71–77

    Google Scholar 

  107. Hashemzadeh G, Khoshtarkib M, Hajizadeh S (2014) Identification and weighting factors influencing the establishment of a single minute exchange of dies in plastic injection industry using VIKOR and Shannon entropy. Manag Sci Lett 4(5):977–984

    Article  Google Scholar 

  108. Ibrahim MA, Mohamad E, Arzmi MH, Rahman MAA (2015) Enhancing efficiency of die exchange process through single minute of exchanging die at a textile manufacturing company in Malaysia. J Appl Sci 15(3):456–464

    Article  Google Scholar 

  109. Jan F (2016) The single minute exchange of die methodology in a high-mix processing line. J Compet 8(2):59–69

    MathSciNet  Google Scholar 

  110. Ani MNBC, Shafei MSSB (2014) The effectiveness of the single minute exchange of die (SMED) technique for the productivity improvement. Appl Mech Mater 465–466:1144–1148

    Google Scholar 

  111. Braglia M, Frosolini M, Gallo M (2016) Enhancing SMED: changeover out of machine evaluation technique to implement the duplication strategy. Prod Plan Control 27(4):328–342

    Article  Google Scholar 

  112. Das B, Venkatadri U, Pandey P (2014) Applying lean manufacturing system to improving productivity of air conditioning coil manufacturing. Int J Adv Manuf Technol 71(1–4):307–323

    Article  Google Scholar 

  113. Roriz C, Nunes E, Sousa S (2017) Application of lean production principles and tools for quality improvement of production processes in a carton company. Procedia Manuf 11:1069–1076

    Article  Google Scholar 

  114. Lipiak J (2017) Methodology for assessing the factors affecting the quality and efficiency of flexographic printing process. Procedia Eng 182:403–411

    Article  Google Scholar 

  115. Esa MM, Rahman NAA (2015) Jamaludin, M Reducing high setup time in assembly line: a case study of automotive manufacturing company in Malaysia. Procedia Soc Behav Sci 211:215–220

    Article  Google Scholar 

  116. Azizi A, Manoharan T (2015) Designing a future value stream mapping to reduce lead time using SMED-a case study. Procedia Manuf 2:153–158

    Article  Google Scholar 

  117. Simões A, Tenera A (2010) Improving setup time in a press line – application of the SMED methodology. IFAC Proc 43(17):297–302

    Article  Google Scholar 

  118. Brito M, Ramos AL, Carneiro P, Gonçalves MA (2017) Combining SMED methodology and ergonomics for reduction of setup in a turning production area. Procedia Manuf 13:1112–1119

    Article  Google Scholar 

  119. Ahmad R, Soberi MSF (2018) Changeover process improvement based on modified SMED method and other process improvement tools application: an improvement project of 5-axis CNC machine operation in advanced composite manufacturing industry. Int J Adv Manuf Technol 94(1–4):433–450

    Article  Google Scholar 

  120. Oliveira J, Sá JC, Fernandes A (2017) Continuous improvement through ‘lean tools’: an application in a mechanical company. Procedia Manuf 13:1082–1089

    Article  Google Scholar 

  121. Kurdve M, Sjögren P, Gåsvaer D, Widfeldt M, Wiktorsson M (2016) Production system change strategy in lightweight manufacturing. Procedia CIRP 50:160–165

    Article  Google Scholar 

  122. Karasu MK, Salum L (2018) FIS-SMED: a fuzzy inference system application for plastic injection mold changeover. Int J Adv Manuf Technol 94(1–4):545–559

    Article  Google Scholar 

  123. Rosa C, Silva FJG, Ferreira LP, Campilho R (2017) SMED methodology: the reduction of setup times for steel wire-rope assembly lines in the automotive industry. Proc Manuf 13:1034–1042

    Google Scholar 

  124. Lanza G, Jondral A, Drotleff U (2012) Valuation of increased production system performance by integrated production systems. Prod Eng 6(1):79–87

    Article  Google Scholar 

  125. Chen S, Fan S, Xiong J, Zhang W (2017) The design of JMP/SAP based six sigma management system and its application in SMED. Procedia Eng 174:416–424

    Article  Google Scholar 

  126. Gungor ZE, Evans S (2015) Eco-effective changeovers; changing a burden into a manufacturing capability. Procedia CIRP 26:527–532

    Article  Google Scholar 

  127. Warkhedkar RM, Desai MS (2011) Productivity enhancement by reducing adjustment time and setup change. Int J of Mech Eng & Ind Eng :37–42

  128. Arief RK, Nurlaila Q, Armila A (2018) Comparative study of conventional and quick die change stamping process: the issue of setup time and storage. InT J Eng Mat Man 3(4):216–223

    Google Scholar 

  129. Sousa E, Silva FJG, Ferreira LP, Pereira MT, Gouveia S, RRP (2018) Applying SMED methodology in cork stoppers production. Procedia Manuf 17:611–622

    Article  Google Scholar 

  130. Martins M, Godina R, Pimentel C, Silva FJG (2018) A practical study of the application of SMED to electron-beam machining in automotive industry. Procedia Manuf 17:647–654

    Article  Google Scholar 

  131. Kutschenreiter-Praszkiewicz I (2018) Machine learning in SMED. J Machine Eng 18(2):31–40

    Article  Google Scholar 

  132. Otur B, Yildirim IS, Ayhan MB (2018) Single minutes exchange of die (SMED) applications at the color changeover process of plastic bottles. Press Academia Procedia 7(40):233–236

    Google Scholar 

  133. Syafei MY (2018) Improving work system by reducing setup time activity in drying room in pharmaceutical industry with single minutes exchange die (SMED). IJIEPR 3(1):50–58

    Google Scholar 

  134. López-Molina MG, Suarez GA (2018) Simulator for lean manufacturing applications: quick change case. Int J for Innovation Education and Research 6(2):274–284

    Google Scholar 

  135. Jain S, Vaishya RO (2018) Applying SMED to reduce changeover time and improve system performance. Int Journal of Technical Innovation in Modern Engineering & Science 4(7):505–509

    Google Scholar 

  136. Maurya D, Yadav Y, Pandey D, Deshmukh RS (2018) Change over time reduction using SMED: an industrial case study. Int J Sci Eng Res 9(3):13–17

    Google Scholar 

  137. Soberi MSF, Ahmad R (2017) Integration of SMED with AHP: a case study in an aerospace company. Journal of Engineering Research and Education 9:41–52

    Google Scholar 

  138. Slack N (2013) Brandon-Jones, A., and Johnston, R. Operations management, 7th edn. Pearson, Edinburgh, UK

    Google Scholar 

  139. Fernando D, Duque M (2007) Lean manufacturing measurement: the relationship between lean activities and lean metrics. Estudios Gerenciales 23(105):69–83

    Article  Google Scholar 

  140. Anvari A, Zulkifli N, Yusuff RM (2013) A dynamic modeling to measure lean performance within lean attributes. Int J Adv Man Tech 66(5–8):663–677

    Article  Google Scholar 

  141. Meredith J (1998) Building operations management theory through case and field research. J Oper Manag 16(4):441–454

    Article  Google Scholar 

  142. Thiollent M (1998) The action research methodology. Cortez, São Paulo

    Google Scholar 

  143. Creswell JW (1994) Research design – qualitative & quantitative approaches. Sage, London

    Google Scholar 

  144. Hammersley M, Atkisnon P (2007) Ethnography: principles in practice, 3rd edn. Routledge, New York

    Book  Google Scholar 

  145. Burgue S (2015) An overview of the soft systems methodology. Burgue Hughes Walsh:1–14

  146. Stone KB (2012) Four decades of lean: a systematic literature review. International Journal of Lean Six Sigma 3(2):112–132

    Article  Google Scholar 

  147. Carvalho CP, Gomes FM, Silva JPM, Silva MB (2017) Lean manufacturing in continuous manufacturing systems: a literature review. Int J of Research Studies in Science, Engineering and Technology 4(7):19–31

    Google Scholar 

  148. Bortolotti T, Romano P (2012) Lean first, then automate: a framework for process improvement in pure service companies. A case study. Production Planning & Control PPC 23(7):513–522

    Article  Google Scholar 

  149. Eaves FF, Bostwick J, Nahai F (1995) Instrumentation and setup for endoscopic plastic surgery. Clin Plast Surg 22(4):591–603

    Google Scholar 

  150. Catchpole KR, Leval MR, Mcewan A, Pigott N, Elliott MJ, McQuillan A, MacDonald C, Goldman AJ (2007) Patient handover from surgery to intensive care: using Formula 1 pit-stop and aviation models to improve safety and quality. Pediatr Anesth 17:470–478

    Article  Google Scholar 

  151. Schultz A (2017) Integrating lean and visual management in facilities management using design science and action research. Built Environment Project and Asset Management 7(3):300–312

    Article  Google Scholar 

  152. Kovach JV, Cudney EA, Elrod CC (2011) The use of continuous improvement techniques: a survey-based study of current practices. Int J Eng Sci Technol 3(7):89–100

    Google Scholar 

  153. Jasti NVK, Kodali R (2015) Lean production: literature review and trends. Int J Prod Res 53(3):867–885

    Article  Google Scholar 

  154. Saurin TA, Ribeiro JLD, Vidor G (2012) A framework for assessing poka-yoke devices. J Manuf Syst 31(3):358–366

    Article  Google Scholar 

  155. Shah MK, Deshpande VA, Patil RM (2015) A review on lean tools & techniques: continuous improvement in industry. International Journal of Advance Industrial Engineering 3(4):200–207

    Google Scholar 

  156. Anvari A, Zulkifli N, Arghish O (2014) Application of a modified VIKOR method for decision-making problems in lean tool selection. Int J Adv Manuf Technol 71(5–8):829–841

    Article  Google Scholar 

  157. Pavnaskar SJ, Gershenson JK, Jambekar AB (2003) Classification scheme for lean manufacturing tools. Int J Prod Res 41(13):3075–3090

    Article  Google Scholar 

  158. Bosdogan, K (2010) Towards an integration of the lean enterprise system, total quality management, six sigma and related enterprise process improvement methods. In Manufacturing and lean technologies of Vol.6 – environmental impact and manufacturing, encyclopedia of aerospace engineering, Wiley

  159. Sundar R, Balaji AN, SatheeshKumar RM (2014) Review on lean manufacturing implementation techniques. Procedia Engineering 97:1875–1885

    Article  Google Scholar 

  160. Marodin GA, Saurin TA (2013) Implementing lean production systems: research areas and opportunities for future studies. Int J Prod Res 51(22):6663–6680

    Article  Google Scholar 

  161. Panizzolo R, Garengo P, Sharma MK, Gore A (2012) Lean manufacturing in developing countries: evidence from Indian SMEs. Prod Plan Control 23(10–11):769–788

    Article  Google Scholar 

  162. Anvari A, Ismail Y, Hojjati SMH (2011) A study on total quality management and lean manufacturing: through lean thinking approach. World Applied Sci Journal 12(9):1585–1596

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Iris Bento da Silva.

Ethics declarations

Conflict of interest

The authors declare that they have no conflict of interest.

Additional information

Publisher’s note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

da Silva, I.B., Godinho Filho, M. Single-minute exchange of die (SMED): a state-of-the-art literature review. Int J Adv Manuf Technol 102, 4289–4307 (2019). https://doi.org/10.1007/s00170-019-03484-w

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-019-03484-w

Keywords

Navigation