Skip to main content

Advertisement

Log in

Concurrent scheduling of manufacturing cells considering sequence-dependent family setup times and intercellular transportation times

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

This paper deals with the problem of scheduling operations in cellular manufacturing systems. A concurrent approach is proposed for job shop cell scheduling while the objective is to minimize the makespan. An integer linear programming model is developed by considering exceptional elements, intercellular moves, intercellular transportation times, and sequence-dependent family setup times. A modification of the model with reduced number of functional constraints is then presented to enhance the efficiency of the model in terms of computational time. In order to efficiently solve real-size problems in a reasonable amount of time, a heuristic approach based on the genetic algorithm (GA) is also developed. The proposed GA is enhanced with problem-specific knowledge of the search space by using a specialized repair strategy, a decoding procedure based on the concept of active schedules and a problem-specific mutation operator which prevents the algorithm from searching redundant solutions. Results reveal that the modified mixed integer linear programming model significantly reduces the computational time and the proposed GA is capable of providing promising solutions to large-scale problems.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Arkat J, Farahani MH, Ahmadizar F (2012) Multi-objective genetic algorithm for cell formation problem considering cellular layout and operations scheduling. Int J Comput Integr Manuf 25(7):625–635

    Article  Google Scholar 

  2. Behnamian J, Zandieh M, Fatemi Ghomi SMT (2010) Due windows group scheduling using an effective hybrid optimization approach. Int J Adv Manuf Technol 46:721–735

    Article  Google Scholar 

  3. Celano G, Costa A, Fichera S (2010) Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times. Int J Adv Manuf Technol 46:695–705

    Article  Google Scholar 

  4. Chen YC, Lee CE (2001) A bottleneck-based group scheduling procedure for job-shop cells. J Chin Inst Ind Eng 18(5):1–12

    Google Scholar 

  5. Elmi A, Solimanpour M, Topaloglu S, Elmi A (2011) A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts. Comput Ind Eng 61:171–178

    Article  Google Scholar 

  6. França PM, Gupta JN, Mendes AS, Moscato P, Veltink KJ (2005) Evolutionary algorithms for scheduling a flow shop manufacturing cell with sequence dependent family setups. Comput Ind Eng 48(3):491–506

    Article  Google Scholar 

  7. Frazier GV (1996) An evaluation of group scheduling heuristics in a flow-line manufacturing cell. Int J Prod Res 34(4):959–976

    Article  MATH  MathSciNet  Google Scholar 

  8. Hamed Hendizadeh S, Faramarzi H, Mansouri SA, Gupta JN, ElMekkawy T (2008) Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times. Int J Prod Econ 111(2):593–605

    Article  Google Scholar 

  9. Haupt RL, Haupt SE (2004) Practical genetic algorithms. 2nd edition, Wiley

  10. Hitomi K, Ham I (1976) Operations scheduling for group technology applications. Annals CIRP 25(1):419–422

    Google Scholar 

  11. Karimi N, Zandieh M, Karamooz HR (2010) Bi-objective group scheduling in hybrid flexible flowshop: a multi-phase approach. Expert Syst Appl 37:4024–4032

    Article  Google Scholar 

  12. Lin SW, Ying KC, Lee ZJ (2009) Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times. Comput Oper Res 36(4):1110–1121

    Article  MATH  Google Scholar 

  13. Mahmoodi F, Dooley KJ (1991) A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell. Int J Prod Res 29(9):1923–1939

    Article  MATH  Google Scholar 

  14. Mahmoodi F, Martin GE (1997) A new shop-based and predictive scheduling heuristic for cellular manufacturing. Int J Prod Res 35(2):313–326

    Article  MATH  Google Scholar 

  15. Mahmoodi F, Dooley KJ, Starr PJ (1990) An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell. Int J Prod Res 28(9):1695–1711

    Article  Google Scholar 

  16. Naderi B, Fatemi Ghomi SMT, Aminnayeri M, Zandieh M (2010) A contribution and new heuristics for open shop scheduling. Comput Oper Res 37:213–221

    Article  MATH  MathSciNet  Google Scholar 

  17. Paydar MM, Saidi-Mehrabad M, Kia R (2013) Designing a new integrated model for dynamic cellular manufacturing systems with production planning and intra-cell layout. Int J Appl Deci Sci 6(2):117–143

    Google Scholar 

  18. Pinedo M (2002) Scheduling: theory, algorithms, and systems. Prentice Hall, New Jersey

    Google Scholar 

  19. Reddy V, Narendran TT (2003) Heuristics for scheduling sequence-dependent set-up jobs in flow line cells. Int J Prod Res 41(1):193–206

    Article  MATH  Google Scholar 

  20. Renna P, Ambrico M (2014) Design and reconfiguration models for dynamic cellular manufacturing to handle market changes. Int J Comput Integr Manuf. doi:10.1080/0951192X.2013.874590

    Google Scholar 

  21. Ruben RA, Mosier CT, Mahmoodi F (1993) A comprehensive analysis of group scheduling heuristics in a job shop cell. Int J Prod Res 31(6):1343–1369

    Article  Google Scholar 

  22. Salmasi N, Logendran R, Skandari MR (2010) Total flow time minimization in a flowshop sequence-dependent group scheduling problem. Comput Oper Res 37:199–212

    Article  MATH  MathSciNet  Google Scholar 

  23. Schaller J (2000) A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell. Int J Prod Res 38(2):287–308

    Article  MATH  Google Scholar 

  24. Schmidt CW, Grossmann IE, Blau GE (1998) Optimization of industrial scale scheduling problems in new product development. Comput Chem Eng 22:1027–1030

    Article  Google Scholar 

  25. Shankar R, Vrat P (1998) Post design modeling for cellular manufacturing system with cost uncertainty. Int J Prod Econ 55(1):97–109

    Article  Google Scholar 

  26. Skorin-Kapov A, Vakharia J (1993) Scheduling a flow-line manufacturing cell: a tabu search approach. Int J Prod Res 31(7):1721–1734

    Article  Google Scholar 

  27. Solimanpur M, Elmi A (2013) A tabu search approach for cell scheduling problem with makespan criterion. Int J Prod Econ 141:639–645

    Article  Google Scholar 

  28. Sridhar J, Rajendran C (1993) Scheduling in a cellular manufacturing system: a simulated annealing approach. Int J Prod Res 31(12):2927–2945

    Article  Google Scholar 

  29. Sridhar J, Rajendran C (1996) Scheduling in flowshop and cellular manufacturing systems with multiple objectives—a genetic algorithm approach. Prod Plan Control 7(4):374–382

    Article  Google Scholar 

  30. Tavakkoli-Moghaddam R, Javadian N, Khorrami A, Gholipour-Kanani Y (2010) Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system. Expert Syst Appl 37:2661–2669

    Article  Google Scholar 

  31. Wemmerlov U, Hyer NL (1986) Procedures for the part family, machine group identification problem in cellular manufacturing. J Oper Manag 6(2):125–147

    Article  Google Scholar 

  32. Zandieh M, Dorri B, Khamseh AR (2009) Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops. Int J Adv Manuf Technol 43:767–778

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Kourosh Halat.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Halat, K., Bashirzadeh, R. Concurrent scheduling of manufacturing cells considering sequence-dependent family setup times and intercellular transportation times. Int J Adv Manuf Technol 77, 1907–1915 (2015). https://doi.org/10.1007/s00170-014-6511-2

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-014-6511-2

Keywords

Navigation