Abstract
Key points of this chapter: The tunnel construction technology with NATM as the core has gradually matured. TBM has been rapidly developed in various fields of engineering construction due to its advantages of rapidity, high quality, high efficiency, safety, environmental protection and automation. The main constraint of TBM application is the poor adaptability to adverse geological conditions, limiting its rapid development and promotion to a certain extent.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2023 China Communications Press Co., Ltd
About this chapter
Cite this chapter
Chen, K., Jiao, S., Wang, J. (2023). TBM Construction in Special Stratum. In: TBM Design and Construction. Springer, Singapore. https://doi.org/10.1007/978-981-99-0059-6_7
Download citation
DOI: https://doi.org/10.1007/978-981-99-0059-6_7
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-99-0058-9
Online ISBN: 978-981-99-0059-6
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)