Abstract
The Waste Framework Directive (WFD) proposes a Waste Hierarchy (WH), a list of waste management strategies ordered from the most to the least preferable and often illustrated as an inverted pyramid. Waste prevention is at the top of this pyramid, followed by preparing for reuse, recycling, and then other recovery activities such as waste to energy. At the bottom of this hierarchy, the waste management strategy to be avoided is waste disposal at landfills.
Although this hierarchy establishes a logical framework for waste management policies, case-by-case assessment shows many exceptions to the rules implicit in this structure. Indeed, depending on the materials and constructive solutions, the order proposed by the WFD can be modified by considering a detailed LCA. On the other hand, when performed on an element level, the results of LCA may not be viable to inform policymakers on the best course of action towards a more sustainable built environment. This paper proposes a multi-level approach – at a material, element and building level – combining the waste hierarchy with the 9R framework. Assessments of building refurbishment at the building or element level can yield vastly different results, which may be relevant when addressing questions posed by each type of stakeholder according to their scope of action.
You have full access to this open access chapter, Download conference paper PDF
Keywords
- Construction and Demolition Waste Management
- Construction
- Life Cycle Assessment (LCA)
- Refurbishment and Maintenance
- Waste Hierarchy (WH)
- 9R Framework
1 Introduction
A circular economy (CE) is restorative and regenerative by design and aims to keep products, components and materials at their highest utility and value at all times [1]. A CE approach helps to reduce environmental degradation and fosters resource efficiency. Ultimately, it minimises waste generation, thus enhancing sustainability [2]. Sustainability assessment is a field in continuous evolution in which the legal framework is crucial to push the adoption of sustainable principles. However, it is important to note that there is a disparity between legislation evolution and the ongoing scientific development and methodological approaches. This paper proposes a combination between the 9R framework (9R) [3] as a frequently used hierarchy and the Waste Hierarchy (WH), proposed by the Waste Framework Direct (WFD) [4], and its adaptation to the construction sector. Additionally, a framework is explored to guide various stakeholders’ decisions, using an approach focusing on the end-of-life (EoL) phase and based on currently available LCA data. A more comprehensive LCA approach is difficult to achieve due to the complexity of LCA studies and lack of research focusing on alternative EoL scenarios. This work responds to the research gap in the application of the WH and 9R to the construction sector by introducing a framework to guide decisions for refurbishment and maintenance purposes.
2 Literature Review
2.1 The Waste Hierarchy
The WFD [4] was initially published in 1975 and was revised in 1991, with the most recent version published in 2008. Since then, several authors proposed adaptations tailored to specific sectors, such as the Delft Ladder (2000) developed for application in the construction sector. This ladder recommends that, for optimal construction practices, the use of “hard-to-recycle materials” should be minimised and the separation of materials and building elements enhanced, stating that constructions should be designed for easy disassembly [5].
Table 1 contains the definitions of recycling and reuse from different sources, highlighting similitudes and differences among proposed definitions. The definitions in most of the documents presented [6,7,8,9] are in accordance with the WFD [4], however, the other documents define reuse acknowledging different purposes than the one for which it was initially conceived [10, 11]. The WFD was amended in 2018, but the definitions remain unaltered, and ‘reuse’ only encompasses the cases in which the product/component serves the same purpose for which they were conceived. The WFD also defines ‘preparing for reuse’ differentiating it from ‘reuse’. In the context of ‘reuse’, the material or object has not yet become waste. On the other hand, in the case of ‘preparing for reuse’, the material has already been designated as waste, and to be declassified as waste, specific actions such as checking, cleaning, or repairing are needed. These recovery operations ensure that products or components are prepared for reuse without requiring any additional pre-processing. The Ellen MacArthur Foundation definition of ‘reuse’ [12], which intends an international scope, seems to be partially in accordance with the WFD but seems to include ‘preparing for reuse’. Other definitions, such as repair, need to be further detailed in the waste hierarchy.
Several concerns within the WH were pointed out in the literature, such as: “not distinguishing between different forms of recycling” and even though it presents a “solid strategy for avoiding landfill, there is doubt about the merits of the hierarchy concerning minimising environmental impacts and natural resource use”. Some of these issues can be overcome by providing stricter guidance on WH implementation [13].
2.2 The 9R Framework
Parallelly to the WH, the 9R proposed by Potting also defines one hierarchy to reduce environmental impacts and boost the circular economy from the most preferable approach: refuse; to the least preferable one: recover [14].
Previously to the 9R framework, a wide variety of n-R approaches was found in literature varying not only the numbers of Rs (3Rs, 4Rs or 6Rs), but also assigning different attributes and meanings to each R. Notably, the number of Rs tends to increase in recent contributions, published after 2010 [15].
Potting recognises exceptions for his framework and advises that the examination of rebound or secondary effects is advisable, but, in general, increased circularity in a product chain results in reduced consumption of natural resources and materials. This, in turn, leads to fewer environmental effects within that product chain and related chains. Although the hierarchy ranks the most to the least favourable strategy, there is still a great need to consider the best solution approach applicable to each case within each specific context [16].
2.3 Life Cycle Assessment Approach
LCA studies are one methodological approach to assess the impacts associated with each activity, product, or material. LCA studies should have a holistic approach, focusing on all the stages of the life cycle of a product, including the EoL. Therefore, LCA could be used to determine the best course EoL strategy, if not for their complexity and time-consuming nature [13].
Neither of the hierarchies that were previously presented, WH and 9R, consider the different characteristics of the different materials. For example, steel structures with demountable connections and prefabricated assemblies comprise mostly reusable materials, while concrete structures may generate recyclable materials [17]. Because different materials require different EoL strategies, sorting is considered a preliminary and essential step before the appropriate waste treatment [18]. Separation allows for action on a smaller level, allowing the preparation for reuse to reduce material consumption or adopting a more appropriate EoL strategy based on the specific material.
LCA studies results, focusing on EoL strategies, would be an important data source but, unfortunately, are hard to compare for various reasons: i) lack of transparency in the definition of the system boundary, ii) uncertainty about life cycle inventory (LCI) data origin; or iii) sensitivity analysis of the assumptions made [19, 20]. Adding to this complexity, different locations have differences in climate, energy mix or the local market available, meaning the same product will have incomparable results [21].
The paper aims to combine the two hierarchies, WH and 9R, adapt them to the construction sector, and create a guideline to help stakeholders choose the preferable EoL strategy.
3 Methodology
3.1 Combination of the 9R Framework and Waste Hierarchy
As previously stated, the WH’s main goal is the generation of less waste, not necessarily the minimisation of environmental impacts. As for the 9R, it presents exceptions in the form of rebound or secondary effects. The main proposition of this paper is the association of the two frameworks, as presented in the WH and 9R [3, 22,23,24], Fig. 1, and their application to the construction sector, presenting some practical examples in Table 2.
3.2 Framework
A building is very different from a usual industrial product, as it contains many different components, made with different materials, with different impacts.
Circular construction supports easy component separation and accessibility, enabling substitutions throughout a structure’s lifetime. However, much of the built environment does not align with these principles. In addition, neglecting minor damages, like infiltrations, can result in significant issues if left untreated. Opting to refuse may lead to greater impacts over time, challenging the effectiveness of established hierarchies.
In light of the specified requirements of the construction sector, the Framework for refurbishment and maintenance in Fig. 2, introduces a proposed framework aiming to implement the Waste Hierarchy (WH) and the 9Rs (Reduce, Reuse, Recycle, etc.) in the construction industry, with the primary objective of minimising environmental impacts. This framework offers stakeholders decision support for refurbishing and maintenance of existing buildings. It is based on the Delft ladder [5], but Circular Economy goals are added to waste reduction targets. It includes a multi-level approach considering the building, component, and material level. This framework is yet limited at the material level due to a lack of results from comparative LCA studies assessing different EoL strategies for each material.
4 Discussion
Compared to most other sectors, the construction industry is unique, particularly due to the extensive consumption of resources, the use of different materials, and the prolonged lifespan of buildings. As a result, managing maintenance activities and end-of-life processes within the built environment poses unique challenges.
The association between WFD and 9R, presented in Fig. 1 was previously proposed by Zhang [23]. However, according to the definitions provided by the WFD (a European regulation applied within this geographical boundary), repurposing would be more adequate within recycling due to the change of original purpose. The definitions of the European Union are vague, mainly focusing on waste reduction, raising some concerns about its effective minimisation of environmental impacts. This combination between WH and 9R is suggested to further define and detail the WFD and adapt it to the construction sector, with practical examples.
The proposed framework in Fig. 2, addresses the second goal of this paper, defining a decision framework to guide stakeholders throughout refurbishment and maintenance. LCA results and generic data play a very important role within this framework, better informing about the preferable EoL strategy for each material. However, not all LCAs results meet the requirements because of a general lack of transparency in defining system boundaries, undisclosed origin of inventory data, and absence of sensitivity analysis of assumptions, making them impossible to compare [19]. Another important aspect of LCA results is that they usually cannot be compared due to the assumptions and choices made about the EoL of a product or material. This means that within a certain product’s LCA, an EoL strategy, such as recycling, will be considered, but not an alternative EoL strategy, such as reuse or incineration. This absence of comparisons creates uncertainty about the impacts of alternatives, lacking clear guidance on the best EoL strategy for each material, backed by statistical data.
5 Conclusion
Due to the complexity inherent to LCA studies, the WH and 9R seem to be the streamlined approaches to inform decision-makers about the preferable approach aligned with CE principles. Nevertheless, neither approach considers the differences in the impacts of different materials. For that reason, a new framework was proposed to support stakeholders in deciding refurbishing or maintenance alternatives on multiple levels: at the building, component, and material. Four main conclusions can be drawn together:
-
The WHD does not discriminate the different types of action contained within, indicating that it might need a new update.
-
Separation (of components and materials) should always be considered to enhance the reuse of components and recycling of materials.
-
Interventions in the built environment should be preventive and strictly necessary, extending the life cycle of the components and of the building, minimising the need for new materials, and reducing impacts.
Finally, it is important to highlight that comparative LCA at a building scale seems to be difficult, but at the material scale, the assessment could inform about the preferable strategy at the EoL. This paper identifies the need for comparative studies focusing on the EoL of the different materials to support deviation from the WH and inform what the best EoL strategies for each material are.
References
International Organization for Standardization (2017) Sustainable procurement—Guidance.(ISO 20400:2017). https://www.iso.org/obp/ui/#iso:std:iso:20400:ed-1:v1:en. Accessed 16 May 2023
Kannikar Khaw-ngern et al (2021) The 9Rs strategies for the circular economy 3.0. Psychol Educ J 58:1440–1446. https://doi.org/10.17762/pae.v58i1.926
Potting J, Hekkert M, Worrell E, Hanemaaijer A (2017) Circular economy: measuring innovation in the product chain. PBL Netherlands Environ Assess Agency 42
Council of the European Union (2020) Directive 2008/98/EC of the European Parliament and the Council. Fundam Texts Eur Priv Law 3–30. https://doi.org/10.5040/9781782258674.0028
Hendricks C, Dorsthorst BJH (2001) Re-use of constructions at different levels: construction, element or material. CIB World Build Congr 1–11
Ecorys (2016) Protocolo de Gestão de Resíduos de Construção e Demolição da UE 1–59
European Commission (2020) Circular Economy Principles for buildings design
Decreto-Lei n.o 102-D/2020, de 10 de dezembro, Presidência do Conselho de Ministros, Regime geral da gestão de resíduos (RGGR)
Level(s). https://environment.ec.europa.eu/topics/circular-economy/levels_en. Accessed 17 Apr 2023
European Commission (2018) Guidelines for the waste audits before demolition and renovation works of buildings EU Construction and Demolition Waste Management
International Organization for Standardization (2020) Sustainability in buildings and civil engineering works-design for disassembly and adaptability-principles, requirements and guidance (ISO 20887: 2020) https://www.iso.org/standard/69370.html Accessed 16 May 2023
Ellen MacArthur Foundation Finding a common language - the circular economy glossary. https://ellenmacarthurfoundation.org/topics/circular-economy-introduction/glossary. Accessed 28 Apr 2023
Van Ewijk S, Stegemann JA (2016) Limitations of the waste hierarchy for achieving absolute reductions in material throughput. J Clean Prod 132:122–128. https://doi.org/10.1016/j.jclepro.2014.11.051
Okorie O, Salonitis K, Charnley F, Moreno M, Turner C, Tiwari A (2018) Digitisation and the circular economy: a review of current research and future trends. Energies 11. https://doi.org/10.3390/en11113009
Reike D, Vermeulen WJV, Witjes S (2018) The circular economy: new or refurbished as CE 3.0?—exploring controversies in the conceptualization of the circular economy through a focus on history and resource value retention options. Resour Conserv Recycl 135:246–264. https://doi.org/10.1016/j.resconrec.2017.08.027
Kabirifar K, Mojtahedi M, Changxin Wang C, Vivian WYT (2020) A conceptual foundation for effective construction and demolition waste management. Clean Eng Technol 1:100019. https://doi.org/10.1016/j.clet.2020.100019
Akanbi LA et al (2018) Salvaging building materials in a circular economy: a BIM-based whole-life performance estimator. Resour Conserv Recycl 129:175–186. https://doi.org/10.1016/j.resconrec.2017.10.026
Althaus HJ, Kellenberger D, Doka G, Künniger T (2005) Manufacturing and disposal of building materials and inventorying infrastructure in ecoinvent. Int J Life Cycle Assess 10:35–42. https://doi.org/10.1065/lca2004.11.181.4
Bovea MD, Powell JC (2016) Developments in life cycle assessment applied to evaluate the environmental performance of construction and demolition wastes. Waste Manag 50:151–172. https://doi.org/10.1016/j.wasman.2016.01.036
Mulya KS, Zhou J, Phuang ZX, Laner D, Woon KS (2022) A systematic review of life cycle assessment of solid waste management: Methodol Trends Prospects. Sci. Total Environ. 831
Hauschild MZ, Rosenbaum RK, Olsen S (2018) Life cycle assessment theory and practice
Kirchherr J, Reike D, Hekkert M (2017) Conceptualizing the circular economy: an analysis of 114 definitions. Resour Conserv Recycl 127:221–232. https://doi.org/10.1016/j.resconrec.2017.09.005
Zhang C, Hu M, Di Maio F, Sprecher B, Yang X, Tukker A (2022) An overview of the waste hierarchy framework for analyzing the circularity in construction and demolition waste management in Europe. Sci Total Environ 803:149892. https://doi.org/10.1016/j.scitotenv.2021.149892
Jonker J, Faber N, Haaker T (2022) Quick Scan circular business models
Acknowledgements
The authors of this paper would like to thank the European Union for funding and COST (European Cooperation in Science and Technology) for supporting the COST Action CircularB CA21103 (www.circularb.eu).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Open Access This chapter is licensed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
The images or other third party material in this chapter are included in the chapter's Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the chapter's Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder.
Copyright information
© 2024 The Author(s)
About this paper
Cite this paper
Burmester, I., Tavares, V., Martins, J.P. (2024). Framework for a Multi-level Approach for Testing the Construction Demolition Waste Hierarchy. In: Ungureanu, V., Bragança, L., Baniotopoulos, C., Abdalla, K.M. (eds) 4th International Conference "Coordinating Engineering for Sustainability and Resilience" & Midterm Conference of CircularB “Implementation of Circular Economy in the Built Environment”. CESARE 2024. Lecture Notes in Civil Engineering, vol 489. Springer, Cham. https://doi.org/10.1007/978-3-031-57800-7_58
Download citation
DOI: https://doi.org/10.1007/978-3-031-57800-7_58
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-031-57799-4
Online ISBN: 978-3-031-57800-7
eBook Packages: EngineeringEngineering (R0)