Abstract
A methodology is proposed for determining equipment loads in pipe-rolling departments over a specific period, within the framework of the available operating life of the equipment, on the basis of adequate technological information.
Similar content being viewed by others
Author information
Authors and Affiliations
Additional information
Original Russian Text © I.I. Mikhailovskaya, D.N. Lysov, V.S. Khazov, V.L. Pyatkov, N.T. Tikhontseva, S.M. Mikhailov, A.V. Belashov, 2011, published in “Stal’,” 2011, No. 2, pp. 69–71.
About this article
Cite this article
Mikhailovskaya, I.I., Lysov, D.N., Khazov, V.S. et al. Simulation of equipment loads in order fulfillment. Steel Transl. 41, 153–156 (2011). https://doi.org/10.3103/S0967091211020124
Published:
Issue Date:
DOI: https://doi.org/10.3103/S0967091211020124