Correction: Protection and Control of Modern Power Systems (2022) 7:51 https://doi.org/10.1186/s41601-022-00271-w


Following the publication of original article [1], the below duplicate content mistakenly appeared in two other places due to a typesetting error.


where O means the set of operating generation units at the cth control interval, and Rj(c) is the downward ramp rate of the jth generation unit. \(\Delta {\text{P}}_{{\text{j}}}^{\min } \left( c \right)\) represents the minimum active output of the jth generation unit in the cth control interval, and PD(c + 1) means the total active power demand of the power grid at the (c + 1)th interval.

The original article [1] has been corrected. The publisher apologizes for the inconvenience caused.