Abstract
The tasks imposed on the control of the GTE-110 gas turbine unit are considered together with the results of experiments carried out at a test rig and on the PGU-325 combined-cycle power plant at the Ivanovo district power station.
Similar content being viewed by others
References
A. Ya. Kopsov, A. P. Livinskii, V. V. Lysko, et al., “The Automated Process Control System of the Rig for Testing the GTE-110 Unit,” Elektr. Stn., No. 7, 27–31 (2003).
I. Z. Chernomzav and K. A. Nefedov, “Improvement of Automatic Control Systems for Large-Capacity Steam Turbines,” Teploenergetika, No. 10, 27–33 (2008) [Therm. Eng., No. 10 (2008)].
A. G. Sviderskii and Kh. Kherpel’, “New Technical Facilities for Equipping Power Industry Plants with Automatic Control Systems,” Teploenergetika, No. 10, 9–13 (2008) [Therm. Eng., No. 10 (2008)].
Author information
Authors and Affiliations
Additional information
Original Russian Text © I.Z. Chernomzav, D.A. Zhezherya, R.V. Mukharryamov, A.A. Perezhogina, 2008, published in Teploenergetika.
Rights and permissions
About this article
Cite this article
Chernomzav, I.Z., Zhezherya, D.A., Mukharryamov, R.V. et al. The system for automatically controlling the processes in a GTE-110, Russia’s first high-temperature large-capacity gas turbine. Therm. Eng. 55, 877–885 (2008). https://doi.org/10.1134/S004060150810008X
Published:
Issue Date: