Abstract
This paper presents a simulated annealing algorithm for resource constrained project scheduling problems with the objective of minimising makespan. In the search algorithm, a solution is represented with a priority list, a vector of numbers each of which denotes the priority of each activity. In the algorithm, a priority scheduling method is used for making a complete schedule from a given priority list (and hence a project schedule is defined by a priority list). The search algorithm is applied to find a priority list which corresponds to a good project schedule. Unlike most of priority scheduling methods, in the suggested algorithm some activities are delayed on purpose so as to extend search space. Solutions can be further improved by delaying certain activities, since non-delay schedules are not dominant in the problem (the set of non-delay schedules does not always include an optimal solution). The suggested algorithm is flexible in that it can be easily applied to problems with an objective function of a general form and/or complex constraints. The performance of the simulated annealing algorithm is compared with existing heuristics on problems prepared by Patterson and randomly generated test problems. Computational results showed that the suggested algorithm outperformed existing ones.
Similar content being viewed by others
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Cho, JH., Kim, YD. A simulated annealing algorithm for resource constrained project scheduling problems. J Oper Res Soc 48, 736–744 (1997). https://doi.org/10.1057/palgrave.jors.2600416
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1057/palgrave.jors.2600416