Weather Risk in Offshore Projects

  • Case-Oriented Paper
  • Published:
Journal of the Operational Research Society

Abstract

Risk analysis tools have been used to help manage various projects. This paper describes a case study in which an extension to the stochastic project network model was developed for a risk analysis of an oil platform installation, quantifying the possible impact of the weather on the project's schedule. Examination of the weather data suggested the use of a Markov weather model combined with a separate residence time distribution for key states. The weather model was incorporated into the stochastic project network allowing the interactions of the various project uncertainties to be examined. While the weather introduced a significant additional risk to the project, analysis of management's options indicated that much of the risk might be avoided. In particular, the analysis quantified the benefits of scheduling the project start to take advantage of the seasonal variations and hiring heavy duty equipment to operate in more arduous conditions.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bowers, J., Mould, G. Weather Risk in Offshore Projects. J Oper Res Soc 45, 409–418 (1994). https://doi.org/10.1057/jors.1994.59

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1057/jors.1994.59

Keywords

Navigation