This paper provides a complete framework to consider manufacturing, inspection and rework activities in two-stage transfer-line production systems. The purpose of this paper is to analyse some of the transient state characteristics of a two-stage production system subject to an initial buffer of infinite capacity, inspection at both the inter- and end-stages and rework. The first stage of the system is never starved and the second stage is never blocked. A stochastic model is developed to analyse the system and explicit analytical expressions for some of the system characteristics have been obtained using the state-space method and regeneration point technique. All the random variables involved in the analysis are assumed to be arbitrary (general). Numerical illustrations have also been presented for some particular cases.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Gopalan, M., Kannan, S. Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and Rework. J Oper Res Soc 45, 797–805 (1994). https://doi.org/10.1057/jors.1994.123

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1057/jors.1994.123

Keywords

Navigation