Abstract
A new scheduling model for the bulk ore blending process in iron-making industry is presented, by converting the process into an assembly flow shop scheduling problem with sequence-depended setup time and limited intermediate buffer, and it facilitates the scheduling optimization for this process. To find out the optimal solution of the scheduling problem, an improved genetic algorithm hybridized with problem knowledge-based heuristics is also proposed, which provides high-quality initial solutions and fast searching speed. The efficiency of the algorithm is verified by the computational experiments.
Similar content being viewed by others
References
Michael R G, David S J. Computers and Intractability: A Guide to the Theory of NP-Completeness [M]. New York: W H Freeman and Co, 1990.
Al-Anzi F S, Allahverdi A. A Self-Adaptive Differential Evolution Heuristic for Two-Stage Assembly Scheduling Problem to Minimize Maximum Lateness With Setup Times [J]. European Journal of Operational Research, 2007, 182(1): 80.
Reeves C R, Yamada T. Genetic Algorithms, Path Relinking, and the Flowshop Sequencing Problem [J]. Evol Comput, 1998, 6(1): 45.
Bagchi T P, Gupta J N D, Sriskandarajah C. A Review of Tsp Based Approaches for Flowshop Scheduling [J]. European Journal of Operational Research, 2006, 169(3): 816.
Zbigniew M. Genetic Algorithms + Data Structures= Evolution Programs [M]. 3rd ed. New York: Springer-Verlag, 1996.
Reeves C R. A Genetic Algorithm for Flowshop Sequencing [J]. Computers and Operations Research, 1995, 22(1): 5.
Murata T, Ishibuchi H, Tanaka H. Genetic Algorithms for Flowshop Scheduling Problems [J]. Computers and Industrial Engineering, 1996, 30(4): 1061.
Author information
Authors and Affiliations
Corresponding author
Additional information
Foundation Item: Item Sponsored by National Key Technology Research and Development Program in 11th Five-Year Plan of China (2006AA04Z184); National Natural Science Foundation of China (60974023)
Rights and permissions
About this article
Cite this article
Song, Cy., Hu, Kl. & Li, P. Modeling and Scheduling Optimization for Bulk Ore Blending Process. J. Iron Steel Res. Int. 19, 20–28 (2012). https://doi.org/10.1016/S1006-706X(13)60004-7
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1016/S1006-706X(13)60004-7