1 Introduction

Dam engineering structures are widely used to raise the water level and thus secure safe retention and storage of water for a number of fundamental purposes, such as navigation, irrigation, water supply, hydroelectricity, regulation of rivers, flood control, etc.[1]. Weirs constitute a common type of hydraulic damming solutions that either form part of an embankment or a concrete dam, or are built as standalone structures. There is no universal type of a weir, as its configuration differs depending on the local requirements and technical capabilities. Weirs are constructed as sharp-crested and broad-crested structures. Sharp-crested weirs include rectangular, triangular, and trapezoidal notches. Broad-crested weirs are generally constructed as concrete blocks with a very broad sill. The weir section of a barrage may include weirs of different forms, such as a sloping weir, a vertical drop weir, an ogee weir, and a labyrinth weir with a zig–zag crest [1]. A fundamental function of a weir is to block a flowing stream of water and eventually force a hydraulic overflow over the weir crest. Safe and economic design of a weir requires determining the hydrodynamic loads acting on the structure to properly satisfy conditions of stability as well as recognising flow kinematics to ensure a necessary amount of water being discharged over the crest. Most of design works uses generally accepted standards and guidelines based on empirical formulas derived for typical geometries and types of weirs. However, the final engineering project is usually preceded by experimental modelling of admitted hydraulic solutions at a model scale in a hydraulic flume.

In Poland, a good example of a dam design process supported by laboratory experiments is the construction of the Włocławek barrage, which was built in 1962–1970 as the first element of a lower Vistula cascade originally planned as a set of eight low-head barrages [2, 3]. The total length of a 10-span concrete spillway section of the Włocławek dam is 200 m [4]. The weir crest elevation is 50.5 m a.s.l. The upstream and downstream beds are located at 42 and 41 m a.s.l., respectively. The normal damming level is 57.3 m a.s.l. The design values of maximum discharge rates Q1% and Q0.1%, corresponding to extreme hydrological events with return periods of 100 and 1000 years, are estimated as high as 9745 m3 s−1 and 12,514 m3 s−1. The design of the spillway section of the Włocławek barrage allowed for an important meteorological factor, which is the risk of ice formation upstream of the dam. Hence, the spillway section was designed to allow ice sheets to pass downstream over the head regulator gates of a plain vertical lift type. This involved a modification to the original ogee weir profile, resulting in the construction of an indentation behind the crest to hide the gates.

The construction of the Włocławek dam was preceded by an experimental model study of the hydraulic properties of the spillway section and water flow characteristics in the hydraulic laboratory of the Institute of Hydro-Engineering, Polish Academy of Sciences, Gdańsk in 1959. The investigations included testing of the original design of the weir using the 1:50 model scale, selected according to the Froude similarity law, and measurements of hydrodynamic loads at the 1:25 model scale. In the course of experiments, water flow velocities were measured using state-of-the-art Pitot tubes and surface markers (floaters). A number of velocity profiles were obtained along the streamwise direction of the downstream side of the weir. However, velocities in a direct vicinity of the weir model were not measured. Velocity data acquisition around the weir model would have been extremely long and laborious due to the limited number of Pitot tubes and a relatively large number of acquisition points necessary for a reasonable spatial resolution of a velocity vector field for engineering purposes.

Since the development of the PIV technique and its adaptation to fluid flows, effective measurements of the evolution of instantaneous velocity fields have become feasible [5]. Common problems of a coarse resolution and an intrusive character of single-point sensors (such as a Pitot tube) have been finally resolved. With respect to river flows, PIV techniques were widely applied to estimate water surface velocities using naturally occurring foam as a tracer [6]. This method, known as Large Scale Particle Image Velocimetry (LS-PIV), has become a popular field measuring technique for evaluating kinematics of surface river flows [7,8,9]. Successful implementation of PIV in river flow measurements encouraged researchers to derive a methodology based on PIV and Particle Tracking Velocimetry (PTV), which resulted in the first operational version of the RIVeR package (Rectification of Image Velocity Results) for large scale velocimetry [10].

It is thus surprising that the new capabilities of the PIV method are only seldom applied to the classical scientific problem of flow over a weir. Most of research still relies on Acoustic Doppler Velocimetry (ADV) point measurements. For instance, ADV was used to measure flow velocities for streamlined weirs [11] and labyrinth weirs [12]. Moreover, numerical techniques were also used because of the modest availability of measuring equipment to investigate weir flows [13] and other important problems of river hydraulics (see e.g. [14].). Application of PIV to specific problems of weir hydraulics is relatively scarce. A few examples are studies of flow over a stepped spillway [15, 16] or the oscillating behaviour of a liquid nappe [17]. Recently, an interesting problem of flow over an ogee spillway crest was investigated by laboratory techniques based on Bubble Image Velocimetry (BIV) [18], where bubbles were used as tracers for the PIV analysis. Another recent example of application of imaging techniques used to investigate flow characteristics is the study on horizontal dense flow spreading in ambient water driven by inclined and convergent surface jets [19]. In this study, a system of two cameras captured spreading patterns of horizontal dense flow of the coloured jet fluid in an experimental flume with Plexiglas walls.

In view of the above, the present study deals with physical tests of water flowing over a submerged damming structure and PIV measurements in a wave–current flume for two weir models corresponding to model scales of 1:25 and 1:50. The weir model under investigation is based on a real engineering solution, which is a part of the spillway section of the Włocławek dam. Weir flow kinematics are determined by a PIV system comprising a high-speed camera and a laser. The information on the spatial characteristics of velocity vector fields under various parameters of flow is used to study the intrinsic features of water flowing in the vicinity of the damming structure. Previous laboratory investigations of flow characteristics covered only time-averaged velocity profiles at some distance from the weir model. The present experimental study provides a comprehensive description of the kinematics of flow directly over the weir model of the Włocławek dam at discharges corresponding to hydrological events with return periods of 100 and 1000 years. The resulting comprehensive database of experimental velocity measurements may serve as a basis for validation of the available numerical models of computational fluid dynamics used for simulations and predictions of a flow field in flow–structure interaction problems.

2 Materials and Methods

2.1 Experimental Setup

Experimental tests are carried out in the hydraulic laboratory of the Institute of Hydro-Engineering, Polish Academy of Sciences (IHE PAS). A major part of the laboratory consists of a wave–current flume, which is a glass-sided basin filled with water of length l = 64 m and width b = 0.6 m. The height of the flume walls is 1.4 m. The operational water depth (h) varies between 0.2 m and 0.8 m. The flume is equipped with a piston-type wavemaker driven by an electric motor and a set of two 50 Hz FLYGT PP 4640 hydraulic pumps installed independently inside two tanks at both ends of the flume. Under the flume bottom, a 0.5 m diameter steel pipe is installed for recirculation of water, together with a Techmag FM 300 electro-magnetic flowmeter, which allows the net discharge Q to be monitored during laboratory tests with 0.5% accuracy. The laboratory flume environment makes it possible to test physical models by standard measuring procedures as well as by measuring methods based on imaging techniques, such as PIV (see e.g. [20,21,22].). A general scheme of a wave–current flume with a wave–current generating system is presented as a side view in Fig. 1.

Fig. 1
figure 1

A schematic side view of the IHE PAS wave–current flume

In the present study, only the flow-generating function of the wave–current generating system is used. The wavemaker plate is removed from the flume to ensure free flow of water (Fig. 1). Only the system of pumps is used to generate a steady current in the flume. Hence, the most important factors determining the capabilities of the flow-generating system are the minimum and maximum discharges of the pumps, which are 0.03 m3 s−1 and 0.33 m3 s−1, respectively, for working pump frequencies fpump of 20 Hz and 50 Hz. However, due to energy losses along the flume and the pipe, the maximum net discharge is lower. Depending on the operational water depth, the pumps are capable of producing net discharges ranging from 0.08 m3 s−1 to 0.19 m3 s−1 for h = 0.3 m and from 0.09 m3 s−1 to 0.24 m3 s−1 for h = 0.6 m, corresponding to average flow velocities ranging from 0.44 m s−1 to 1.05 m s−1 for h = 0.3 m and from 0.25 m s−1 to 0.67 m s−1 for h = 0.6 m. In Fig. 2, the net discharge generated by pump 2 is presented as a function of the pump working frequency. It may be seen from the graph that increasing the working frequency of pump 2 results in a nearly linear increase in discharge. However, some small deviations from the linear Qfpump dependency are apparent for the highest working frequencies of the pump and for the lower water depth h = 0.3 m because of the incomplete submergence of the pump in the flume tank.

Fig. 2
figure 2

Net discharge characteristics of pump 2

Weir models of two different physical scales, 1:50 and 1:25, are installed in the flume. The models are made of waterproof plywood painted with matte black paint. The shape and physical dimensions of the models correspond to the geometry of a segment of a narrow-crested spillway section of the existing Włocławek dam. In Fig. 3, a schematic cross section of the model is presented with dimensions corresponding to the 1:25 scale. The upstream vertical wall of the two scale models coincides with the z axis (x = 0 m) and is located 39 m away from the inflow boundary of pump 1 (Fig. 3).

Fig. 3
figure 3

A schematic cross section of a weir corresponding to the 1:25 model scale

The spillway wall faces are vertical with an offset upstream and a small rounded edging at the top of the crest downstream. The crest is relatively narrow. The weir and the associated water flow are characterised by the following parameters: the upstream water depth hu, the downstream water depth hd, the crest height C, and the head of water above the crest H. The head height and upstream/downstream water depths depend on the initial water depth in the flume (at the hydrostatic state) and the net discharge produced by the pumping system.

2.2 PIV Measurements

The instantaneous velocity fields of flow over the weir are recorded by a state-of-the-art 2D Flowmaster PIV system comprising a high-speed camera with a charge-coupled device (CCD) having a resolution of 1280 × 1024 pixels and a neodymium-doped yttrium–aluminium-garnet (Nd:YAG) 50 mJ dual laser-head system operating at a maximum repetition rate of 50 Hz. Hollow glass spheres are suspended in water and used as seeding tracer particles. They are illuminated by a pulsed sheet of laser light and recorded as a pair of two single-exposure images by a camera. The two camera exposures are separated by an interval of 1.8 ms. Based on the time interval between images and the average displacement of the seeding material, the velocity vector is determined in selected subareas called interrogation windows. More information on the principle of PIV measurements and analysis of results may be found in papers on the use of PIV techniques in experimental fluid mechanics (see e.g. [5, 23].). Velocity measurements are performed in a plane parallel to the direction of flow and the glass walls of the flume. The PIV camera traces particle displacements by recording pairs of images in a 0.369 m × 0.295 m field of view with a fixed sampling frequency fPIV. The PIV coverage for the two model scales is depicted in Fig. 4

Fig. 4
figure 4

PIV coverage area of flow over the weir: a scale factor 1:50, b scale factor 1:25

A double frame/double exposure method, based on the cross correlation of two images, is used to calculate the spatial distribution of velocity vectors at consecutive time instants. A multi-pass method with a decreasing interrogation window size is used with a 50% overlap. The size of the starting window is 128 by 128 pixels, and the size of the resulting window is 32 by 32 pixels. Moreover, a geometric mask is applied to a sequence of images to increase the accuracy of calculations in the vicinity of the water surface and the physical model edges. Quiver velocity graphs presenting PIV measurements and complementary line plots are derived using the Golden Software Grapher 11 package.

2.3 Test Cases

The measurements are carried out for three initial water depths corresponding to hydrostatic conditions for the model scale of 1:25 and one water depth for the 1:50 model scale. Three net discharges for each case are produced by pump 2. Two series of measurements are carried out for each fixed initial depth and net discharge to provide 1200 instantaneous velocity fields at 10 Hz and 50 Hz sampling frequencies. The data collected at the 10 Hz sampling frequency are used to study the steady state characteristics of flow over the weir, while the 50 Hz sampling rate is used to analyse the formation and propagation of vortex structures in a region adjacent to the weir crest. PIV measurements are complemented by the monitoring of the net flow discharge and free-surface position at several locations in front of, above, and behind the weir. Basic parameters of weir flow tests are summarised in Table 1.

Table 1 Basic hydraulic parameters of laboratory PIV measurements of flow over a weir

3 Results and Discussion

3.1 Weir Flow Structure

To give some insight into the structure of flow over the weir model, a series of time-averaged velocity vector fields is presented in Figs. 5, 6, 7, 8. The mean values of velocity vector components are calculated on the basis of 1200 instantaneous velocity fields recorded at the 10 Hz sampling frequency, thus covering an averaging interval of two minutes. The results in Figs. 5, 6, 7, 8 are complemented by spatial information on the maximum flow velocity along the streamwise direction x together with reference critical velocity estimates (vc). In this case, the critical velocity is determined as a velocity corresponding to the critical flow, where the Froude number is equal to unity (Fr = vc g−0.5 h−0.5 = 1). In the region upstream of the weir, the critical velocity is calculated on the basis of upstream depth (hu). On the other hand, the critical velocities along the weir crest and further downstream are estimated on the basis of the total head of water above the crest (H). It is therefore assumed that the thickness of the main stream tube is approximately constant and equal to H in this region. The streamwise velocity distributions for smaller and larger scale experiments are presented in Fig. 9.

Fig. 5
figure 5

Average velocity fields of flow over the 1:50 weir model; ac tests WF01-WF03

Fig. 6
figure 6

Average velocity fields of flow over the 1:25 weir model; ac tests WF04-WF06

Fig. 7
figure 7

Average velocity fields of flow over the 1:25 weir model; ac tests WF07-WF09

Fig. 8
figure 8

Average velocity fields of flow over the 1:25 weir model; ac tests WF10-WF12

Fig. 9
figure 9

Average distribution of maximum velocity along the streamwise direction of flow over a weir: a 1:50; b–d 1:25; h = 0.3 m; WF01 (a), WF04 (b), WF07 (c), and WF10(d)—green line (triangles); WF02 (a), WF05 (b), WF08 (c), and WF11(d)—blue line (squares); WF03 (a), WF06 (b), WF09 (c), and WF12(d)—red line (circles); respective critical flow velocities are provided for reference (solid lines)

In the case of the smaller model scale (1:50), the flow is characterised by similar spatial patterns as for the larger model scale (Figs. 5a–c, 9a). It may be seen that in the inflow region, the flow regime is subcritical and relatively uniform over depth. When approaching the vertical front of the weir model, water particles accelerate because the vertical upstream weir wall reduces the area perpendicular to the flow. The water flowing over the weir model continues to accelerate. The flow undergoes a transition from the subcritical to the supercritical regime. The maximum velocities grow from 0.5 to 1 m s−1 upstream of the weir crest to 1.5 to 2 m s−1 at the local maximum above the crest (x = 0 m). Behind the crest, the maximum velocity preserves a slightly lower constant value along the downstream side of the weir model. The stream is first attached to the weir model at the crest and then it overfalls freely above its milder slope downstream of the weir crest. A circulation cell develops under the stream just behind the downstream side of the crest. The water underneath the main stream flows in the reverse direction until reaching the downstream vertical front. In the case of the lowest measured discharge, corresponding to vH = 0.78 m s−1 (WF01), the circulation cell extends to cover the steeper slope of the downstream part of the model as well. For larger discharges, corresponding to vH = 1 and 1.8 m s−1 (WF02 and WF03), the cell is confined to a triangular region with lower edges formed by the downstream vertical wall and the milder slope of the model.

Generally, the same flow structure applies to physical tests in the larger scale (1:25) with respect to the transition zones from the subcritical flow regime located upstream to the supercritical regime over the weir crest (Fig. 9b–d). It can be seen in Fig. 9b–d that the maximal velocities grow in the streamwise direction, reaching a local maximum at the weir crest. The extreme values may be as high as 2.2–2.3 m s−1 for the largest discharges corresponding to vH = 1.36, 1.49 and 1.56 m s−1 and an upstream depth of 0.6 m (WF06, WF09, WF12). Further downstream, the maximum velocities either remain constant (WF07, WF10) or continue to grow in the remaining cases. It should be noted that the only case in which the flow remains in the subcritical regime upstream and downstream of the weir model is WF10, where the average velocity at the crest is vH = 0.55 m s−1. It is due to the fact that, in this case, the depths of flowing water are relatively large, and the velocity is relatively small, which results in a submerged flow over the weir model. The maximum velocity of flow is always lower than the critical velocity resulting from the thickness of the water layer above the weir crest, as indicated by green lines in Fig. 9d.

3.2 Vortex Formation

For lower discharge rates at a larger scale (1:25), the main stream may become detached from the weir crest. The detachment may be partial (Fig. 7a), when the water flow slows down in certain parts of the weir crest, or permanent (Fig. 8a), when the flow adjacent to the crest is directed opposite to the main stream. The presence and type of detachment implies different flow characteristics with respect to eddy formation downstream of the weir. Figures 10, 11, 12 show three typical cases of flow resulting in development of vortex structures starting from a selected time instant t0. Figure 10 presents the propagation of stream detachment from the weir crest. It can be seen that the main stream slows down suddenly at the location x = − 0.02 m. The location of the slowdown is identified as the starting point of the detachment of the stream from the weir crest. The detachment propagates further downstream of the weir crest until the lateral boundary of the weir. Behind the weir, the stream freely overfalls above a limited region of relatively calm water and eventually becomes attached to the steeper downstream slope of the weir model. Figure 11 illustrates the formation of vortex structures above the weir crest under hydrodynamic conditions corresponding to a permanently detached flow of water from the weir crest. This kind of detachment is characteristic of flow that remains in the subcritical regime after passing the front of the weir crest (Figs. 8a and 9d). In this case, the left end of the weir crest is where vortex structures are first formed (x = − 0.04 m). The vortices are then advected downstream, following a path tangent to the lower boundary of the main stream. Finally, in Fig. 12, the formation of vortex structures at the downstream end of the weir crest is presented. The origin of eddies is located at x = 0.08 m, just behind the weir crest. Again, the vortices propagate downstream in a region adjacent to the lower boundary of the main stream. These hydrodynamic processes are relatively abrupt, since the propagation speed of these evanescent turbulent structures ranges from 0.3 to 1 m s−1, and they are formed over a time interval of the order of a hundredth of a second.

Fig. 10
figure 10

Evolution of detachment of the stream from the weir crest (WF07); a t0; b t0 + 0.04 s; c t0 + 0.08 s

Fig. 11
figure 11

Formation of a vortex structure above the weir crest (WF10); a t0; b t0 + 0.14 s; c t0 + 0.28 s

Fig. 12
figure 12

Formation of a vortex structure behind the weir crest (WF11); a t0; b t0 + 0.04 s; c t0 + 0.08 s

4 Conclusions

Laboratory experiments are carried out to study the kinematics of flow over a weir. A model of a weir representing a part of the spillway section of the existing Włocławek dam is installed in a wave–current flume. Two model scales 1:25 and 1:50 are investigated for a number of flow discharges corresponding to hydrological events with return periods of 100 and 1000 years. The particle image velocimetry technique is employed to study the evolution of a flow velocity field in a direct vicinity of the modelled damming structure. The system is capable of providing high fidelity velocity fields at sampling rates of 10 Hz and 50 Hz. The lower acquisition frequency is used for the analysis of flow characteristics corresponding to a stationary flow. The generation and propagation of vortices is analysed on the basis of data acquired at the higher sampling rate.

The flow over the weir model exhibits a common general pattern in nearly all analysed test cases. The flow regime is subcritical and relatively uniform over depth in the inflow region. Further downstream, it accelerates due to a decrease in the area perpendicular to the flow, which is limited by the weir crest and free water surface. The maximum velocities grow from 0.5–1 m s−1 upstream of the weir crest to 1.5–2 m s−1 at the local maximum above the crest. The flow undergoes a transition from the subcritical to the supercritical regime, with the exception of the test case corresponding to the highest upstream depth of over 0.6 m and the lowest discharge corresponding to an average velocity at the crest of 0.55 m s−1, where the flow remains permanently subcritical along the flume. Behind the weir model, a reverse transition from the supercritical to the subcritical regime occurs, resulting in a hydraulic jump.

The geometry of the weir results in the development of a characteristic circulation cell. For lower discharges, the cell is wider, covering the entire weir crest, and is accompanied by the detachment of the main stream from the crest. In the case of the lowest measured discharge, corresponding to an average velocity at the crest of 0.78 m s−1, the cell extends to cover the steeper slope of the downstream part of the model as well. For larger discharges, corresponding to average velocities at the crest of 1 and 1.8 m s−1, the cell is confined to a triangular region behind the weir crest.

The presence of the weir model and sudden changes in the flow regime result in the formation of vortex structures, which propagate along the lower edge of the main stream tube. In a fully subcritical regime, when the average velocity at the crest reaches approx. 0.6 m s−1, origin of eddies is located at the upstream end of the weir crest, as the main stream remains detached from the crest. On the other hand, for a higher average flow velocity at the crest of approx. 1.2 m s−1, vortexes are formed at the downstream end of the crest. These turbulent structures propagate at speeds ranging from 0.3 to 1 m s−1 and are formed in hundredths of a second.