Introduction

Renewables generation plays a key role in the transition towards decarbonization. In fact, this has been widely acknowledged by several governments around the world, which are already committed to promote increased levels of renewables in their energy system, aiming to decarbonize electricity and also electrify other energy vectors. This transition is facilitated by the significant decrease in the investment costs of wind and solar photovoltaics (PV) power plants, making these technologies more and more competitive, representing an attractive alternative to conventional generation technologies such as coal and natural gas-fired units [1]. Following this trend, during 2018 and for the fourth year in a row, new capacity additions in renewables surpass those of all conventional generation technologies combined [2].

A paramount challenge for the large-scale integration of renewables is the need for flexibility to deal with the variability and unpredictability of wind and solar power generation. Among the different flexibility sources, energy storage (ES) is seen as one of the key technologies that will enable the large-scale integration of variable renewable energy. Indeed, besides the classical service of temporal energy arbitrage, ES can provide an array of ancillary services and drive investment deferrals in both generation and transmission, while accommodating increased amounts of renewables [3, 4]. Hence, ES has gained considerable attention from policy-makers and researchers globally. Economic and technical analyses regarding ES impacts and benefits, optimal sizing, market design and regulation, business models, among other themes, have been widely reported in the literature as discussed next.

Regarding the ES value streams, in [5], the authors identify and calculate a significantly higher value of storage when including multiple services that ES is able to provide. In [6], the authors show the importance of a multi-year multi-service approach for the optimal sizing of storage, including primary and secondary reserves. Also, the importance of co-planning transmission and generation expansions jointly with ES capacity shows how larger savings can be reached due to deferral of network and generation infrastructure [7].

Contribution of storage to system capacity adequacy has been reported under several methodologies. For example, in [8], the authors present a dynamic programming-based method to estimate the capacity value of an energy storage system. Their findings indicate that the capacity value of ES could range between 40 and 100% of name-plate discharge capacity, depending on storage duration. New frameworks for capacity credit determination are proposed in [9] in order to account for specific characteristics of ES.

In addition to the previous applications, in [10, 11] the authors studied how ES can provide a hedge against uncertainty in future system developments. ES is a flexible asset with potentially shorter deployment times than reinforcements in the grid; therefore, it can grant planners the ability to delay decisions and react to unfolding uncertainty until reinforcements are fully justified.

On top of the applications discussed, ES can aid in the fulfillment of carbon reduction targets more efficiently due to several reasons. ES operation leads to an improved operational efficiency of conventional plants, by reducing startup/shutdown cycles, ramps, and partial load operation [7]. In the same way, ES can minimize the curtailment of clean renewable energy by storing it for later use [12]. Moreover, mix of ES with renewable energy can replace base load capacity, such as coal-based units, aiding in the secure decommissioning of these plants [3]. Remarkably, in [13], the authors have obtained a larger integration of renewables reducing participation of nuclear energy, reaching the same carbon emissions limit, but at a lower cost.

Many of the questions concerning ES in the literature have been addressed by using mathematical tools and models with different levels of operational detail representation. Therefore, it is expected that the main conclusions are conditional to the modelling scope of these tools. Proper modelling of variability and operational constraints, as well as multiple service provision, are key to valuing operationally flexible solutions correctly. However, computational burden arises quickly as more details are introduced; therefore, representation of operational detail in planning has been very limited. Simplifications are introduced through representative periods—days or weeks per year [7][13]—technology clustering of generating units [14], neglecting short-term operating constraints, or other requirements such as ancillary services or reliability constraints [15]. In this vein, planning authorities, regulatory offices, and policy-makers have faced the need to include a number of simplifications in energy planning studies. For example:

  • In the USA, there are various energy planning models commonly used by relevant agencies and institutions that ignore hourly variability and unit commitment constraints, among them [16]: the Integrated Planning Model (IPM) used by the U.S. Environmental Protection Agency; the National Energy Modeling System (NEMS) used by the U.S. Energy Information Administration; the Regional Energy Deployment System (ReEDS), developed by the National Renewable Energy Laboratory (NREL); and the United States Regional Economy, Greenhouse Gas, and Energy (US-REGEN) model, developed by The Electric Power Research Institute (EPRI).

  • The TIMES model, internationally used for planning purposes, also ignores detailed operation in terms of hourly resolution and the discrete variables needed to model inflexibility of conventional generation [17, 18].

  • In Chile, the Power Electricity Timetable (PET) model used by the Energy Ministry to run its long-term energy planning exercise (PELP, due to its acronym in Spanish) every 5 years considers only 8 annual time slices with no consideration of unit commitment constraints [19]. The OSE2000 model, used by the National Energy Commission of Chile to identify optimal transmission network reinforcements and plan new storage capacity, features the same simplifications [20].

Recently, there is a body of work arising that has started to analyze the impacts of using a stylized operation representation within long-term energy planning models. These studies have analyzed the importance of temporal resolution [21,22,23] and operational flexibility (i.e., full set of unit commitment constraints or a subset of them) [7, 14, 24, 25], concluding that modeling detail is paramount to correctly assess the value of new technologies in future energy systems. Also, reference [26] studied the importance of these features combined within a stochastic optimization framework, determining the optimal generation mix, including energy storage, in a greenfield fashion and in a single busbar representation of the Chilean power system.

In this paper, we estimate the value of incremental energy storage capacity, particularly pumped hydro storage (PHS), in the Chilean electricity market by using two mathematical models with different levels of simplification. The key distinction between these two models is the treatment of operational details within the planning process. Hence, a long-term planning model with stylized operation, commonly used by planners and regulators, is compared with a more advanced model, where system operation is modeled with high resolution within the planning process, accounting for hourly unit commitment constraints and reserves. Under both modeling frameworks, contributions of incremental PHS capacity to cost savings in operation and investments are assessed in a realistic case study of the Chilean power system, with high levels of wind and solar power generation capacity in 2025. Apart from cost savings, we also determine, by using the two modeling approaches, the benefits of storage in terms of reductions in CO2 emissions and renewables curtailments, as well as the revenue streams for storage plant owners.

This paper is structured as follows. In Section 5, the two modelling approaches are explained in detail, and the case studies are presented. In Section 5, the numerical results are presented and analyzed. Finally, Section 5 presents the main conclusions drawn from this study.

Methodology

Overview

This study estimates the value of incremental energy storage capacity in the Chilean electricity market by using two mathematical models with different levels of simplification. In particular, we assess the impact of a PHS plant of 300 MW and 21.6 GWh (i.e., 72 h of storage durationFootnote 1) located north of the country. We select this location as, in our studies, we analyze future scenarios with large penetration of solar power generation in the northern area. Importantly, this area includes the Atacama desert, where solar irradiance is one of the highest in the world, with maximum values circa 1200 W/m2 (in Global Horizontal Irradiance) [27]. Also, this location has been previously identified by the Chilean regulator, the National Energy Commission, to install energy storage capacity and thus support effective integration of solar power generation [28].

For estimating the value of PHS capacity, we determine optimal future system operation and investments for given scenarios of penetration of renewable generation with and without the 300-MW PHS plant, focusing on how the incremental energy storage capacity impacts system operation, network expansions, the need for peaking plant capacity, CO2 emissions, and renewables curtailments. We undertake this value assessment by using two optimization models, one with more simplifications than the other. Hence, the more simplified model (called the stylized model in this paper) seeks to resemble the levels of simplifications commonly used by regulators to run a cost-benefit analysis. The more advanced, detailed model, on the other hand, captures state-of-the-art features, particularly in terms of including a high resolution of system operation within the planning problem.

The advanced model (AM) optimizes system operation along with the expansions of the transmission network and peaking plant capacity. To do so, it minimizes operational and investment costs within a single year (i.e., static model), recognizing, as input parameters, existing network capacity and future generation capacity expansions of renewables and other generation technologies, beside peaking plant capacities that are optimized. The key feature of the AM is the high resolution of system operation, including hourly dispatch, unit commitment constraints (i.e., ramp rate limits, minimum stable generation levels, minimum up- and downtimes, and reserves), and startup and shutdown costs. The stylized model (SM), instead, seeks to optimize the same operational and investment decisions, but with a lower resolution of system operation, ignoring unit commitment constraints, startup and shutdown costs, and clustering consecutive hours in time slices. As mentioned earlier, the SM seeks to resemble common simplifying assumptions applied by regulators and planners in long-term energy planning studies. Hence, we aim to find the size of the numerical errors associated with these simplifying assumptions.

Model Description

The Advanced Model

The advanced model corresponds, fundamentally, to a system planning mathematical program that optimizes both new system investments (in generation and transmission) and the corresponding system operation over a year. Examples of models that can optimize generation and transmission, along with system operation, can be found in [29, 30]. In this paper, we use these planning tools by eliminating the feature of generation expansion, except for peaking plants, and increasing the resolution of the system operation representation. By planning peaking plant capacity only, we aim to estimate the value of energy storage capacity for given future scenarios of generation expansions, while, at the same time, assessing the ability of the energy storage plant to contribute to capacity adequacy by displacing “firm” generation capacity. Hence, the advanced model optimizes generation dispatches, including that of the given PHS plant, along with transmission network expansions and capacity of peaking plants. The general structure of this problem is shown in Table 1.

Table 1 Structure of the advanced long-term planning model with high operational resolution used to assess the value of PHS

One of the key features of the AM is the high resolution of system operation, including full representation of the unit commitment constraints (explained in detail in [31, 32]), and the startup and shutdown costs in an hourly fashion. As explained in [11, 33, 34], one of the main disadvantages of incorporating such details in planning models is that these become intractable, originating the need for advanced algorithms to solve the planning problem. Indeed, the planning problem becomes a very large mixed integer linear program (MILP). In this vein, we use similar approaches as in [33] to solve our problem.

The Stylized Model

The stylized model seeks to optimize the same problem as the AM, but with a set of simplifying assumptions to make the problem tractable. These simplifying assumptions are selected in order to resemble current practices in regulatory offices over the world, including Chile. These simplifications are:

  • Time slices rather than hourly operation: In the stylized model, hourly profiles of nodal demands and renewable generation are clustered so as to reduce computational burden. In our study, we use 16 time slices or “blocks” per month and, consequently, 192 per year to capture different levels of demands and outputs of renewable generation.

  • Absence of unit commitment constraints and associated costs: The stylized model does not consider reserves, ramp rate limits, minimum up- and downtimes, and startup and shutdown costs of conventional units. The main advantage of doing so is that system operation becomes fully linear (i.e., linear program) without the need to incorporate integer or binary variables for system operation as in the advanced model. In terms of algorithms, this problem can be usually solved in its monolithic form by using commercial software. Very large instances of the stylized planning problem can be solved by applying a classical Benders decomposition, with an upper level optimizing investment decisions and a lower level (fully linear and so convex) optimizing operational decisions as explained in [35, 36].

Expectedly, these simplifying assumptions will affect the results. In this vein, we aim to study the size of the numerical errors associated with these simplifications and their implications on long-term energy planning studies with energy storage, particularly for PHS plants.

Case Studies

Input Data

We model the Chilean electricity market in 2025, focusing on the value of a PHS plant of 300 MW and 21.6 GWh (i.e., 72 h of storage duration) located in the north of the country. We use two future scenarios of generation expansion based on the latest projections made by the Chilean Energy Ministry [19]. These two scenarios are shown in Table 2. This table also shows that the current generation mix is dominated by hydro (28%), coal (20%), and LNG (18%). However, this is rapidly changing as new projects based on renewable technologies such as wind and solar power are dramatically increasing. Furthermore, we expect that the combined share of wind and solar generation increases from the current 19.8% to, at least, 32% by 2025, which is higher than the share of any other technology. Note that Table 2 is a summary of the 496 units modeled at a national level.

Table 2 Installed capacity connected to the transmission network by technology and its share: current and 2025 scenarios (capacity values in MW).

We use a simplified representation of the Chilean transmission network with 44 nodes. Figure 1 shows the location of the 15 main nodes that represent the national gridFootnote 2, along with the location of potential capacity of solar, wind, and hydro generation. As shown in Fig. 1, there is a significant potential for solar power generation in the north of Chile (nodes 1–3), while the demand center (i.e., Santiago) is located far away in nodes 8–10. This suggests that significant capacity of a new transmission network might be needed and that a PHS plant located in the north (in node 1) can create important benefits in terms of accommodating increased amounts of solar power generation in a congested network.

Fig. 1
figure 1

The Chilean power system and its renewable energy resources [37]. Colors are used to show the renewables potential in areas with PV, wind, concentrated solar power (CSP), and hydro that present a load factor higher than 30, 30, 50, and 50%, respectively

The technical and cost information necessary to model the economic dispatch of the Chilean system are obtained from official and public documentation by the system operator [38] and the energy ministry [19]. This includes technical parameters of power plants (such as minimum and maximum capacities, ramp rate limits, minimum up- and downtimes), cost parameters (fuel costs, startup and shutdown costs), system reserves requirements, sizes of hydro reservoirs, the hydro network necessary to appropriately model the hydro connections related to hydro plants located in the same basin, and the profiles of nodal demands, wind, solar, and hydro inflows. As the dominating generation technology in Chile corresponds to hydro, a great deal of effort is put into appropriately modeling basins. As an example, Fig. 2 shows the hydro connections among various series power plants in the Biobío river basin. Note that the datasets involved here are extremely large as we model every individual power unit. Hence, rather than specifying parameters of individual generators, we chose to show some of the main system parameters in Table 3. In addition, Fig. 3 shows the relevant daily profiles in terms of averages and deviations in a year. For specific data, we address the reader to the abovementioned references.

Fig. 2
figure 2

Connection of hydropower plants throughout the Biobío river basin

Table 3 Main parameters of the Chilean system in 2025
Fig. 3
figure 3

Boxplot of hourly demand, solar PV, and wind generation in a day (yearly deviations)

Importantly, although we assess the impacts of incremental PHS capacity on CO2 emissions, we do not penalize emissions by using a carbon tax, carbon price, or other similar policies. In other words, we use a carbon price equal to 0 $/tCO2 in our assessments. We do so because the existing carbon tax policy applied in Chile, with a tax level equal to 5 $/tCO2, cannot be used to modify real system operation. This will be explained in more detail in the following section.

Finally, the PHS unit studied features a total power capacity of 300 MW, a roundtrip efficiency of 75% and 72 h of energy storage capacity with three independent reversible turbines. Although the power output can be fully controlled when the PHS discharges in a continuous fashion, it only presents three discrete output levels (equal to 100, 200, and 300 MW) when the PHS plant is charged. This limitation is included to capture the fact that current technologies being evaluated by investors in Chile do not present drives with variable speed. Indeed, upgrading the drive to feature variable speed, as studied in [39], can increase the benefits of PHS. This PHS plant is located in the north, particularly in node 1, where the installed capacity of solar power is the highest. Importantly, although Chile presents a high share of hydropower plants (that can potentially compete against PHS for the provision of flexibility and security), they are located in the southern part of the system, opposite to the location of solar resources. Hence, a PHS plant located in the north could present potentially higher benefits since Chile presents a long transmission network prone to bottlenecks.

Studies

We run the AM and SM with and without the PHS plant under two future scenarios in 2025. The main objective is to compare the benefits of the PHS plant estimated by the SM, against those obtained by running the AM, quantifying the size of the numerical errors originated by the simplifying assumptions traditionally used in energy system planning studies. The benefits studied include operational costs savings, investment costs savings (in both transmission network capacity and peaking units), CO2 emissions reductions, and renewables curtailments reductions. We also study and conclude, through the advanced model, on the real value of a PHS plant in Chile.

Finally, we also analyze the benefits associated with a PHS plant from a private perspective, by using the dual variables of the optimization models as energy and reserves market prices. Here, we assess the private benefits (i.e., revenues) under the same two future scenarios and determine the numerical errors of simplifying assumptions.

Numerical Results

General Results

In this section, we quantify the impacts of adding a 300-MW PHS plant on two future scenarios of the Chilean electricity system in 2025, introduced in the previous section. These impacts are measured in terms of operational costs (OPEX) savings, investment costs (CAPEX) savings, CO2 emissions reductions, and renewables curtailments reductions as explained next.

  1. 1.

    OPEX savings are originated by the ability of PHS to perform energy arbitrage (buying energy during low-price hours and selling it during high-price hours), provide reserve services and provide flexibility, supporting a more cost-effective operation of the power system when facing technical constraints, even beyond reserve requirements, such as ramp rate limits, and minimum up- and downtimes. Flexibility also supports reduction of startup and shutdown costs of thermal power plants.

  2. 2.

    CAPEX savings are divided into two categories: generation and transmission. The one associated with generation is due to displacing or differing capacity of peaking plants since PHS can undertake peak shaving actions in a very cost-effective and reliable fashion. Savings in network infrastructure, on the other hand, can also be capitalized if the operation of the PHS plant leads to a reduction in the maximum power transfers and, in turn, in network capacity.

  3. 3.

    CO2 emissions reductions could be observed due to the ability of PHS to be charged at the time when renewable generation is available and discharge in hours when peaking and other thermal units operate. Importantly, PHS supports maximization of renewables output in an hour-by-hour fashion through flexibility contribution, and minimizing wind and solar power curtailments, which, in turn, reduces CO2 emissions.

  4. 4.

    Reductions in renewables curtailments may be observed when PHS capacity is integrated in power systems because storage plants, fundamentally, provide further means to optimize operation. In this vein, being renewables zero marginal cost generation, energy storage may maximize their outputs with the aim of minimizing operational costs.

The abovementioned benefits are quantified and shown in Table 4. These results are displayed for two future scenarios and by using two models: one with a detailed time resolution (AM) and one with a poorer time resolution (SM). The latter also neglects technical constraints (i.e., unit commitment constraints) of conventional generation as well as their startup and shutdown costs.

Table 4 Total OPEX, CAPEX, and CO2 emissions and wind-solar curtailments reductions due to installation of PHS plant in two future scenarios and under two modeling approaches (negative values refer to an increase)

Expectedly, these results demonstrate that benefits of PHS capacity are higher under scenario 2, which presents increased capacity of solar power generation as shown in Table 2. In fact, this is the case for almost all benefits studied (i.e., all benefits calculated with the AM, except for G-CAPEX, are higher under scenario 2). Savings in peaking plant capacity (i.e., G-CAPEX), though, remain the same under both scenarios.

Table 4 also shows that approximations in modeling that are very common in our field can lead to a significant underestimation when assessing the benefits of PHS, irrespective of the volumes of renewable generation capacity installed. In our studies, for example, the stylized model undervalues the benefits of PHS in both scenarios. Furthermore, we observe an important distortion in the emission results of the stylized model. Indeed, this reports an increase in the volumes of CO2 emissions when PHS capacity is integrated. Note this is conflicting with the right set of results, calculated through the more precise model (AM), which demonstrates that CO2 emissions are effectively reduced with the integration of PHS capacity.

Importantly, the above problems due to modeling approximations are of upmost relevance for policy-makers, who are attempting to calculate the right value of PHS capacity in future scenarios. Next, we analyze in more detail the previous results and problems found.

Operational Cost Savings (OPEX)

Table 4 demonstrates that a detailed representation of system operation is paramount for the correct assessment of the benefits of PHS capacity. This is so since provision of services related to energy arbitrage, reserves, and flexibility is better captured in models with higher time resolution and appropriate representation of all constraints and costs associated with conventional generation (i.e., unit commitment constraints such as ramp rate limits, minimum stable outputs, minimum up- and downtimes, and representation of startup and shutdown costs).

In this vein, Fig. 4 shows the system and PHS operation determined under the two models in scenario 1 for a particular workday of year 2025. While hour-by-hour variability of renewables and technical constraints is appropriately considered by the AM approach, the operation of the SM approach seems clearly discretized, undermining the need to operate more expensive power units, whose outputs are minimized as illustrated in Fig. 4b.

Fig. 4
figure 4

Hourly operation determined by the a AM and b SM approaches

Furthermore, Fig. 4 shows three noticeable differences between the results of SM and AM approaches. Firstly, outputs of coal generation are more flexible in the stylized model, being significantly reduced when solar generation produces power. This is so since this model can truly maximize the output of zero marginal cost generation without appropriately considering the technical constraints of both coal power units and other thermal units. Indeed, under the right, more accurate model, coal plants have limitations to deal with variable renewable generation due to slow changes in outputs and constraining minimum stable generation limits. Secondly, LNG and diesel units are needed, especially to deal with peak demands, and this is undermined by the stylized model. Thirdly, the PHS plant is dispatched more actively under the AM so as to provide peak shaving and other energy, security, and flexibility services.

Interestingly, the simplifications in question not only leads to significant errors in the assessment of social costs and benefits, but also in the assessment of private benefits. To illustrate this point, Fig. 5 shows both the operation of PHS plant and the marginal cost (or spot price) in the node where this plant is located under the two modeling approaches (in scenario 1). Clearly, both PHS plant operation and energy prices significantly differ between the two modeling approaches, where SM leads to an important underestimation in revenues as shown in more detail in Table 5.

Fig. 5
figure 5

PHS operation (in MW) and nodal marginal price (in $/MWh) according to a AM and b SM approaches. Negative power outputs refer to the charging operating mode of the storage plant

Table 5 shows the estimated savings in OPEX and the revenues of the PHS plant calculated under the two modeling approaches and in both scenarios. While the OPEX savings are directly obtained from Table 4, revenues are calculated as follows. In the case of energy arbitrage, hourly energy purchases and sells are multiplied by the spot price of energy in the node where the PHS plant is connected, which corresponds to the Lagrange multiplier (or dual/shadow price) of the energy balance constraint at that node. In the case of reserves services, hourly reserves amounts provided by the PHS plant are multiplied by the system prices of reserves, which are equal to the Lagrange multipliers of the constraints securing sufficient amounts of primary, secondary, and tertiary reserves [40]. As private revenues should be proportional to social benefits, the SM approach significantly undermines private revenues in both scenarios as well as social benefits. Remarkably, as shown by the results with the advanced model, energy arbitrage and reserves services are sufficient for the plant owner to capture an important proportion of the social benefits originated by installing the PHS plant.

Table 5 OPEX savings and revenues of energy arbitrage and reserves services (in M$/year)

Investment Cost Savings in Peaking Plants

As presented previously in Table 4, the savings obtained in terms of deferring peaking plant capacity (G-CAPEX) are the second largest reported in this analysis. Such savings are justified due to the role played by PHS capacity in peak shaving, which reduces the need for peaking plants. As in OPEX savings, here modeling simplifications (i.e., a stylized operation of the power system) can also lead to an important underestimation of the benefits in terms of CAPEX in generation capacity. In this context, Table 6 presents the amount of peaking plant capacity displaced in each scenario. In particular, in scenario 1, the capacity credit of PHS is undermined by 57% by the SM approach, reducing the capacity contribution of the PHS plant to less than half of the correct value determined by the AM approach.

Table 6 Displaced peaking plant capacity by a 300-MW PHS unit in two scenarios and according to two models (in MW)

This result may present profound implications in capacity recognition by regulators for remuneration purposes. Chile, for instance, features a cost-based economic dispatch, in which energy prices can only recover part of the overall costs of power plants since bids, that are audited, can reflect only variable costs of generation, ignoring opportunity costs [41]. So, there are administrative capacity payments paid to power plant owners so as to recover the total cost of operation and investment. In theory, capacity payments (plus energy market revenues) lead to full cost recovery only if investments are cost-effective and hence there is no excess of generation capacity in the market. Under these market arrangements, nameplate capacities are penalized in order to remunerate only the “firm” or “adequate” capacity of power plants. In this vein, our analysis suggests that the calculation of adequate or firm capacity (the capacity of peaking plant units that can be securely displaced or decommissioned due to the installation of PHS plant) can significantly differ from the right result if the model is too approximated. Clearly, administrative rules to calculate capacity payments should appropriately recognize the contribution of PHS to adequacy so as to align social benefits and economic incentives to investors.

Investment Cost Savings in Transmission Capacity

As shown in Fig. 1, the PHS plant in question that is located north of the country (node 1) is next to the Atacama desert and within a prominent area in Chile for the development of solar power generation. As the load center is located in Santiago (nodes 8–10), in the middle of the electricity system and about 1700 km from Atacama, the model, under both scenarios, needs to build significant transmission infrastructure in order to transfer the solar power produced by new plants from the north to the center. This is shown in Table 7, where investments in new capacity for all transmission corridors modeled are shown for both scenarios, the two modeling approaches, and in the cases with and without the PHS plant.

Table 7 Optimal transmission investment for two scenarios and two modeling approaches

Expectedly, as solar generation needs to be exported from the north at around noon, our AM demonstrates that the installation of the PHS plant can create important benefits in terms of displacing network capacity in the north-center transmission corridor, since the storage plant can be conveniently charged at the time of the maximum production from solar power generation, alleviating network congestions. A less expected result, though, is represented by the small savings in network investment costs south of the country, in the south-center corridor (e.g., L11 − 12). Through various sensitivity analyses, we demonstrate that such savings exist because the PHS plant supplies part of the peak demand in Santiago during the evening, displacing the need to import power from the south during these hours. Interestingly, while maximum transfers in the north-center corridor occur at around noon (due to solar power generation), the time of the maximum transfers in the south-center corridor coincides with Santiago’s maximum demand time in the evening. Hence, the installation of the PHS plant in the north can support transfer minimization in both northern and southern lines as charge and discharge actions occur at convenient times to alleviate network congestions.

Regarding the numerical errors in the stylized model, as mentioned earlier, savings under the AM are larger than those determined by the SM, highlighting the importance of a refined time resolution in these studies. However, this is not the case in every individual corridor. For example, corridor L5 − 6 in scenario 1 presents a reduction of 151 MW according to the AM, contrasting with the 64 MW determined by the SM, which clearly undermines the benefits of PHS. But, corridor L9 − 10 in scenario 1, instead, presents a reduction of only 91 MW according to the AM, contrasting with the 124 MW determined by the SM. In this case, the SM overestimates the benefits of PHS. In our studies, SM tends to underestimate the benefits of PHS plant in terms of the total network investment costs, but, as demonstrated above, this may not be the case for every individual transmission project.

Reductions in CO2 Emissions and Renewables Curtailments

As discussed earlier, under the advanced modeling approach, PHS reduces CO2 emissions in both scenarios as shown in Table 8. How these reductions are justified, though, is not straightforward. Our AM demonstrates that, in scenario 1, the operation of PHS increases coal generation by 150 GWh/year, while, in scenario 2, the integration of the PHS plant decreases production from coal-fired plants by 512 GWh/year. Indeed, coal generation can be increased by energy storage systems as indicated in [42] since these systems provide further means for system operators to reduce costs by facilitating higher outputs of low-cost power plants, including, sometimes, coal power units. Also, in both scenarios, more than 500 GWh/year from LNG plants is displaced by renewables since the operation of the PHS plant reduces wind and solar power spills. In fact, the increased dispatches of solar and wind power plants due to PHS lead to lower CO2 emissions too.

Table 8 Reductions in generation by technology and in CO2 emissions at a system level (negative values indicate increases) when including a PHS plant in the two scenarios and two modeling approaches

Remarkably, a model with lower resolution in operational timescales (SM) may lead to significantly large errors in the calculation of CO2 emission reductions due to PHS operation. In fact, while the AM determines a saving of 200,000 tCO2/year in scenario 1, the SM calculates an increase of 393,000 tCO2/year. Table 2 suggests that this large error is mainly due to two reasons. First, benefits of PHS in terms of reducing renewables curtailments can be significantly underestimated by a model that cannot capture extreme conditions that may happen in the hour-by-hour operation of the system like combinations of low demand conditions with high renewables outputs. Capturing extreme conditions is key since, under such conditions, renewables may be curtailed. Second, the impacts of PHS on the operation of coal and LNG plants can also be importantly miscalculated. For example, in scenario 2, while coal power outputs are reduced due to PHS operation according to AM, the SM approach suggests an increase in coal power outputs. This highlights the importance of appropriate modeling to truly capture the increases and decreases in the dispatch of different generation technologies and hence the final trend of CO2 emissions when integrating PHS capacity.

The miscalculation of CO2 emission reductions by the SM can present important policy implications. In Chile, investments in storage plants can be materialized under two approaches: a market-driven and a regulated/mandated one. Under the market-driven approach, investors are supposed to stack revenues from several markets, providing energy and a series of ancillary services and thus recovering their investment costs. Under the regulated approach, instead, investors are supposed to be remunerated through regulated payments and the investments should be proved necessary through a regulated cost-benefit analysis. As the regulated cost-benefit analysis is a study similar to that presented above, there is a significant risk of undermining the value of PHS in the regulated planning process if models used by regulators are similar to our SM. Interestingly, under the market-driven approach, benefits of CO2 emissions reductions associated with storage can also be misplaced. In fact, Chile presents a cost-based electricity market, in which the economic dispatch problem solved by the system operator only captures audited variable costs of power plants. Furthermore, generators are forbidden to include carbon taxes paid by them in their audited variable costs as explained in [43]. Consequently, spot prices do not reflect the extra marginal costs due to CO2 emissions, potentially undermining the incentives for investors to install energy storage.

Conclusions

We estimate the value of incremental energy storage capacity in the Chilean electricity market by using two mathematical models with different levels of simplification. The key distinction between these two models is the treatment of operational details within the planning process. Hence, in the most simplified model (called the stylized model in this paper), we ignore unit commitment constraints and the hourly variability of various datasets by using an array of time slices to represent different system conditions. We undertake our assessments under two future scenarios in 2025, both representing fast growing of renewables such as wind and solar power generation.

We found that simplifications commonly used by regulators within long-term energy planning studies significantly underestimate the value of incremental PHS capacity. Indeed, we found that the value of the PHS plant obtained by using simplifications is less than a third (31%) than that determined by the more advanced model in one of the scenarios. Remarkably, this is not the largest error. In terms of CO2 emissions, for instance, our studies demonstrate that simplifications can drive an increase in CO2 emissions due to an increment in PHS capacity, while the correct solution obtained by the advanced model clearly shows that CO2 emissions decrease. From a private perspective, we also found significant differences in terms of revenues for plant owners. Indeed, in one of the scenarios, the revenues due to energy arbitrage by the stylized model were only a small fraction (6%) of that determined by the advanced model.

These results suggest that the value of PHS capacity significantly depends on the operational resolution used in long-term energy planning studies by policy-makers, regulators, planners, and investors. This is particularly important in light of, for example, setting policy incentives for energy storage technologies or determining mandated energy storage investments, which is one of the approaches adopted in Chile. This also expands to PHS developers, in a market-driven environment, who can significantly undermine the revenues of energy storage if the planning tool used is too stylized.