A Management Framework to Reduce Delays in Road Construction Projects in Sudan

  • Research Article - Civil Engineering
  • Published:
Arabian Journal for Science and Engineering Aims and scope Submit manuscript

Abstract

Road construction delays are a challenge for developing countries, and specifically for Sudan, where great economic costs result from difficulties in identifying and reducing the factors that cause delay. This paper addresses the key delay factors faced by the road construction industry in Sudan, and it proposes a management framework that has the potential to reduce this delay. The methodology used first critically reviewed relevant published studies, reports, policy documents and management steps used in different countries. Secondly, a structured questionnaire was produced through a two-day interactive workshop with the help of experts and professionals from the road construction industry in Sudan. Thirdly, Relative Importance Index was measured based on the individual responses towards delay factors in road construction projects, and then, the correlation between delay factors and the effects of delay were evaluated. Moreover, the initial findings were analysed and the factors were combined into six groups. The finance competence factors group was found to be the main contributor towards delays in road construction projects in Sudan. Some effective ways were proposed to overcome delays due to financing via use of strategic public and private partnerships for large-scale projects, introduction of bank financing schemes for medium-scale projects, and community-based partnership for small-scale projects. In the fourth stage, a management framework was developed using the ‘stage–gate’ approach and validated with the input from a panel of experts. The paper details the way a proposed management framework will work to design a construction project in an effective manner especially in Sudan.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Ministry of Information: Sudan the land of opportunities. ISBN 233/2011

  2. Africa Infrastructure Country Diagnostic (AICD): Africa’s Infrastructure: A Time for Transformation. http://www.infrastructureafrica.org (2011). Accessed June 2016

  3. National Highway Authority: Pavement Condition Survey Manual. Ministry of Roads and Bridges-Sudan (2005)

  4. Elkhalifa, A.: The magnitude of barriers facing the development of the construction and building materials industries in developing countries, with special reference to Sudan in Africa. Habitat Int. 54(3), 189–198 (2016)

    Article  Google Scholar 

  5. Elsheikh, R.F.A.; Hassan, W.A.S.: Analysis of least cost path by using geographic information systems network and multi criteria techniques. Int. J. Multidiscip. Sci. Eng. 7(5), 1–6 (2016)

    Google Scholar 

  6. Ghaffari, A.: Developing a model for risk and responsibility management share amongst stakeholders consortium in construction projects. Adv. Mater. Res. 684, 639–643 (2013)

    Article  Google Scholar 

  7. Marzouk, M.M.; El-Rasas, T.I.: Analyzing delay causes in Egyptian construction projects. J. Adv. Res. 5(1), 49–55 (2014)

    Article  Google Scholar 

  8. Wambui, D.; Ombui, K.; Kagiri, A.: Factors affecting road construction projects completion in Nairobi City County: case study of Kenya Urban Roads authority (KURA). Int. J. Sci. Res. Publ. 5(11), 525–547 (2015)

    Google Scholar 

  9. Aziz, R.F.; Abdel-Hakam, A.A.: Exploring delay causes of road construction projects in Egypt. Alex. Eng. J. 55(2), 1515–1539 (2016)

    Article  Google Scholar 

  10. Ondari, P.O.; Gekara, J.M.: Factors influencing successful completion of roads projects in Kenya. Int. J. Soc. Sci. Entrepreneurship. 1(6), 26–48 (2013)

    Google Scholar 

  11. Kikwasi, G.J.: Causes and effects of delays and disruptions in construction projects in Tanzania. Aust. J. Constr. Econ. Build. Conf. Ser. 1(2), 52–59 (2012)

    Google Scholar 

  12. Gündüz, M.; Nielsen, Y.; Özdemir, M.: Quantification of delay factors using the Relative Importance Index method for construction projects in Turkey. J. Manag. Eng. 29(2), 133–139 (2012)

    Article  Google Scholar 

  13. Cooper, R.G.: The Seven Principles of the Latest Stage-Gate\({\textregistered }\) Method Add Up to a Streamlined, New-Product Idea-to-Launch Process. Stage-gate Inc, New York (2006)

    Google Scholar 

  14. Thamhain, H.: Managing risks in complex projects. Proj. Manag. J. 44(2), 20–35 (2013)

    Article  Google Scholar 

  15. Cooper, R.G.: Agile-stage-gate hybrids: the next stage for product development blending agile and stage-gate methods can provide flexibility, speed, and improved communication in new-product development. Res. Technol. Manag. 59(1), 21–29 (2016)

    Article  Google Scholar 

  16. Tatikonda, M.V.; Rosenthal, S.R.: Successful execution of product development projects: balancing firmness and flexibility in the innovation process. J. Oper. Manag. 18(4), 401–425 (2000)

    Article  Google Scholar 

  17. McNeil, A.J.; Frey, R.; Embrechts, P.: Quantitative Risk Management: Concepts, Techniques and Tools. Princeton University Press, Princeton (2015)

    MATH  Google Scholar 

  18. Walker, D.H.; Lloyd-Walker, B.M.: Understanding the motivation and context for alliancing in the Australian construction industry. Int. J. Manag. Proj. Bus. 9(1), 74–93 (2016)

  19. Mohamad, MR.: The Factors and Effect of Delay in Government Construction Project (Case Study in Kuantan). Master Thesis, Universiti Malaysia Pahang (2010)

  20. Langat, D.K.: Factors influencing completion of construction projects in public secondary schools in Bomet east sub-county, Bomet county, Kenya. Doctoral Dissertation, University of Nairobi (2015)

  21. Chai, C.S.; Yusof, A.M.: SEM approach: reclassifying housing delay in Malaysian Housing Industry. J. Econ. Bus. Manag. 3(3), 364–369 (2015)

    Article  Google Scholar 

  22. Elawi, G.S.A.; Algahtany, M.; Kashiwagi, D.; Sullivan, K.: Major Factors Causing Construction Delays in Mecca. J. Adv. Perform. Inf. Value 7(1), 1–12 (2015)

    Google Scholar 

  23. Memon, A.H.; Rahman, I.A.; Akram, M.; Ali, N.M.: Significant factors causing time overrun in construction projects of peninsular Malaysia. Mod. Appl. Sci. 8(4), 16 (2014)

    Article  Google Scholar 

  24. Salunkhe, A.A.; Patil, R.S.: Identification of critical construction delay factors. Int. J. Latest Trends Eng. Technol. 3(4), 256–261 (2014)

    Google Scholar 

  25. Information Policy Team, t.N.A.: The project control framework Handbook. Highways Agency publications, Kew, London, Code PR01/13 (2013)

  26. Chia, F.C.; Skitmore, M.; Runeson, G.; Bridge, A.: Economic development and construction productivity in Malaysia. Constr. Manag. Econ. 32(9), 874–887 (2014)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Khalid Khair.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Khair, K., Mohamed, Z., Mohammad, R. et al. A Management Framework to Reduce Delays in Road Construction Projects in Sudan. Arab J Sci Eng 43, 1925–1940 (2018). https://doi.org/10.1007/s13369-017-2806-6

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s13369-017-2806-6

Keywords

Navigation