1 Introduction

The sustainable and economical use of existing reinforced-concrete (RC) bridges requires reliable assessment of their current condition under service loading. For road bridges, RC deck slabs are the most fatigue vulnerable part due to the pronounced effect of vehicle’s axles [1,2,3,4,5]. RC decks often need assessment to meet both the safety and serviceability requirements of infrastructures particularly with the increase of the magnitude and frequency of axle loads.

The assessment of RC decks refers to the early stage assessment of concrete and steel reinforcement condition, as well as the bond between them. The effect of cyclic loading on RC structural elements was investigated in [1, 6,7,8,9,10]. However, most of these studies were limited to laboratory testing and only few have performed assessment on real structures. Different NDT methods were used to evaluate bridges on site such as radar, impact echo, and infrared thermography [11,12,13]. Such methods allow to detect delamination, moisture, and discontinuities in concrete but are limited for initial microcrack detection.

Early stage assessment is often restricted to visual inspections [14,15,16] that are subjective and not always reliable, or calculations of structural capacity [17], which are very conservative with the unrealistic assumptions and models related to loading and material properties. The assessment of RC decks requires methods that can give both the structural characteristics and response of RC structural elements under traffic and environmental loading.

The acoustic emission (AE) method has been proven to be efficient to assess the condition of concrete and steel. Being drawn from the physical phenomena of elastic wave propagation, it was widely used to investigate internal changes in materials under loading and to detect and classify crack initiation and propagation at an early stage [18,19,20,21].

The term “acoustic emission” refers to transient elastic stress waves generated by the energy released when microstructural changes occur in a material [22]. AE technique is based on recording the surface vibration of these waves. Stress waves propagate from the AE source toward the sensors, and during the propagation, they are influenced by a variety of factors such as propagation velocities, attenuations, discontinuities, and the geometry of the material. Recording stress waves can provide, therefore, information about the mechanical and geometrical properties of the environment in which they propagate. More details about the basis of this technique can be found in [23,24,25].

AE verification of RC structural elements under cyclic loading has been studied by many researchers [26,27,28,29,30,31]. However, most of them were limited to laboratory testing. Pronounced noise, complex loading, environmental conditions, as well as calibration and lack of reference present challenges for translating AE laboratory knowledge to the field.

Few research studies [23, 32,33,34,35,36] have demonstrated the feasibility of AE assessment of RC road bridges, but often for occasional testing under a load test. In fact, the interpretation of the AE measurements is difficult when the loading condition is unknown. Moreover, the huge amount of generated AE data under traffic presents a storage challenge. To the best of the authors’ knowledge, there has been no work performing AE continuous long-term monitoring on RC decks in service and relating the AE response to traffic and environmental changes.

2 Research significance and originality

Fatigue of reinforced concrete belongs to the most studied research topics and AE technique has been widely used for fatigue crack detection and classification [8, 21, 26, 29, 37]. Nevertheless, many essential questions have not been answered so far. For instance, no sufficient explanation has been given about the mechanisms of degradation of RC structural elements under traffic and environmental loading. Another important point that lacks explanation is applying AE technique to investigate at an early stage the evolution of RC cracking activity on site.

To address these challenges, the last advances of the AE technique were used to perform a long-term monitoring campaign on an RC road bridge. The study is focused on initial cracking of concrete due to fatigue under traffic and environmental loading. It is illustrated with a case study in which no other mechanism of degradation has occurred based on engineering expertise. The AE technique was associated with strain gauges and thermocouples to connect AE measurements with vehicle loading and environmental changes. The approach provides both the structural response, i.e., reinforcement strain and temperature of concrete, and structural characteristics i.e. material properties and the condition of structural element connections and supports (Fig. 1).

Fig. 1
figure 1

Diagram of the monitoring approach

The originality of this work includes:

  • development, calibration, and synchronization of the monitoring approach;

  • identification of the annual variation of AE features with temperature;

  • identification of the annual variation of AE features with traffic loading;

  • investigation of initial stage of cracking phenomena in concrete with respect to traffic and thermal changes;

  • assessment of structural characteristics and structural response of an RC deck slab based on acoustic and strain measurements.

3 Monitoring of an RC road bridge

3.1 Structural description

The presented case study relates to a composite steel–concrete viaduct, in service since 1957. It has two road lanes with a width of 10.5 m. The viaduct comprises seven articulated spans of 25.6 m length and an approach span of 15.8 m. Each span is made from two steel girder beams with a height of 1.3 m, fixed in an RC slab of thickness varying from 0.17 m in the mid-span to 0.24 m (Fig. 2). The slab comprises longitudinal and transverse reinforcement rebars in both the tensile and compression zones with diameters of 10 mm, 14 mm, and 18 mm.

Fig. 2
figure 2

Case study, Crêt de l'Anneau viaduct, units in (m)

3.2 Monitoring system

The monitoring system comprises strain gauges, thermocouples, acoustic emission (AE), and ultrasonic testing (UT) system. It is illustrated in Fig. 3. Spans 2 and 4 were instrumented in July 2016 with strain gauges and thermocouples. Span 4 was additionally instrumented in December 2018, using the UT and AE systems. In total, 3 years of strain and temperature measurements, few months of pulsing signals, and one year of AE data were recorded and processed.

Fig. 3
figure 3

Configuration of the monitoring system

The data acquisition unit of strain is a Quantum MX1615, acquiring strain with a high frequency varying between 50 and 100 Hz, from 8 strain gauges with half-bridge configuration and 2 strain gauges with quarter-bridge configuration. The data acquisition unit of temperature is a Quantum MX1609, measuring temperature with a high frequency of 1 Hz, from six thermocouples. An output and input unit comprised of Quantum MX879B was used to acquire recorded data, connect the system with a 4G internet connection, and connect strain and temperature measurement units with the AE acquisition system.

The data acquisition unit of strain was equipped with a monitor to visualize the measurements on-site. Catman program (a data acquisition software) was used to integrate all the units together and to visualize and parametrize data analysis.

The data acquisition system of AE technique is a sensor Highway for in-situ monitoring, comprised of a Processor Atom N2600, with a memory card of 128 Go and 32 acquisition channels of bandwidth range from 1 to 400 kHz, at − 3 dB. The system was acquiring data from 24 resonant sensors PK151, resonating at 150 kHz with an integrated preamplifier of 26 dB gain. The sensors detect transient waves and convert them to an electrical signal. Resonant sensors were used because of their high sensitivity and since the emission is strongly attenuated in concrete. The integrated preamplifiers were used to avoid signal loss. AE is insensitive to structural resonance since it only detects high-frequency events.

The same AE acquisition system was used to record the response of the generated waves by the UT system. This was made technically possible by the use of a card ARB-1410-150 generating arbitrary waveforms, a multiplexer with four channels on the card ARB, 4 sensors PK 15l resonating at 75 and 150 kHz, and an industrial calculator connected to the ARB card and controlled by the AE data acquisition system. The frequency of interaction between the sensors and the card was fixed at 800 kHz to get the last arrivals of the waves while the frequency of pulses was 150 kHz to be suitable for concrete (with the maximum aggregate diameter of 32 mm). The results of the UT system are not further discussed in this paper.

The acquisition system was equipped with a monitor to visualize the data on-site and a 4G connection internet for remote access using a remote connection program. AEwin program (a commercial software for real-time “simultaneous” AE feature and waveform processing) was used to visualize in real time the generated waves and the AE features.

Data were recorded, stored, and collected every 24 h, using the file transfer protocol (FTP). AE data were stored as DTA file, with 400 GB of collected data during the period of monitoring from 14/03/2019 to 14/03/2020. Strain data were stored as Matlab file, with 39 GB of data collected during the last year of monitoring.

3.3 Instrumentation

Sensors were installed in the accessible critical parts that provide easy interpretation of the recoded data to understand the structural behavior. Therefore, strain gauges were installed at the mid-span, and AE sensors were mounted in the mid-span and in three different longitudinal zones in the lane with the highest number of heavy trucks (Fig. 2). All the sensors were mounted on the underside of the RC slab since there is no access from the top side.

Spans 2 and 4 were instrumented each with four strain gauges with half-bridge configuration. Two were installed in the adjacent longitudinal rebars at mid-span and the two others were installed in the two-perpendicular transverse rebars (Fig. 2). The rebars were detected with a rebar locator (profometer), and an area of 50 × 50 mm of the concrete cover was removed to uncover the rebars. Strain gauges were glued on each rebar and sealed with a protective layer to avoid any contact with air.

The top and bottom flanges of one steel box girder of Span 4 were instrumented each with a strain gauge with quarter bridge configuration. The painting was removed, and the surface was cleaned, and then the strain gauge was glued and covered with the protection layer.

Thermocouples were installed in the concrete near strain gauges at the mid-span of Spans 2 and 4, and at the top and bottom flanges of the steel girder of Span 4.

To monitor the smooth functioning of the setup, one thermocouple and one humidity sensor were installed in the box of strain and temperature acquisition units.

The AE sensors (1–24) were mounted on four grids as it is illustrated in Fig. 4. The first grid is a circular network of six sensors (Channels 5, 6, 7, 17, 21, 22) with a diameter of 0.34 m installed at the mid-span. The second grid is comprised of nine sensors (Channels 8, 9, 10, 11, 12, 18, 19, 20,24) spaced in a grid of 0.24 m and installed at the mid-lane, 1.35 m away from the girder. The third grid is comprised of four sensors (Channels 13, 14, 15, 16) spaced in a grid of 0.20 m, installed near the support, 1.57 m away from the girder. The fourth grid is a circular network of five sensors (Channels 1, 2, 3, 4, 23) with a diameter of 0.28 m installed between the support and the articulation. The UT sensors (M, R, V, J) were distributed among the network of nine AE sensors between the mid-span and the girder (Fig. 4).

Fig. 4
figure 4

Plan view showing the instrumented Span 4 and the deployment of AE sensors, dimensions in (m)

The sensors were mounted using silicone glue to provide a direct and flexible connection between the contact surfaces of concrete and the sensors and were fixed with magnetic holders attached by metal plates screwed in concrete to ensure strong fixation. The surface of the concrete was smoothened and cleaned before the mounting, and the rebars were detected using a profometer to avoid installing the sensors directly underneath the rebars. The electronic noise coming from the interaction between the cables of connection of the AE system and UT system was mitigated by fixing the cables far away from each other.

3.4 Calibration

3.4.1 Strain gauges

A load test was carried out after instrumenting Spans 2 and 4 with strain gauges. A five-axle truck with a maximum load of 400 kN was used to perform four passages per direction with four speeds. Transverse rebars were under tensile stresses during the passage of the truck. In the longitudinal direction, the girder and the rebars showed the expected stress reversal, i.e., both tensile and compressive stresses, due to vehicle passage.

The measured strains were mainly influenced by truck position and by slab slenderness that accentuates local strains under the wheels. The axle configuration of the load-test truck does not have any influence on the response of the transverse reinforcement and the steel girder, which means that, during the monitoring campaign, the effect of vehicles can be directly related to their total load [38].

3.4.2 Acoustic emission

The evolution of AE activity under traffic and environmental conditions was preliminarily measured continuously over two months after instrumenting Span 4 with AE sensors. The recorded signals were analyzed to define the filters for suitable noise precautions for long-term monitoring.

Real-time visualization of AE activity was possible for a threshold above 30 dB. To delete totally the noise of traffic, the waveforms with counts between, 5 and 10,000, and amplitudes between 40 and 1000 dB were recorded. A time filter was defined for peak definition time (PDT), hit definition time (HDT) and hit lockout time (HLT) as shown in Table 1 with channel setups and filters. Under the chosen filters, no AE activity was observed in the absence of traffic.

Table 1 AE setup

Sensor calibration and signal attenuation were performed with the pencil break method according to the standard NF EN 1330-9, 2017 [39], during the installation and 2 months after. Five pencil breaks were completed 0.05 m away from each sensor. The three highest recorded amplitudes must be higher or equal than 80 dB [40], and the measured value must have a variation of less than ± 3 dB from the mean amplitude value of all the sensors. Pencil break tests were conducted for each sensor and the recorded amplitudes were evaluated. When the sensors were not giving a response according to the requirements, the coupling and fixation were repeated.

4 Data processing methods

In this paper, the recorded AE signals during 1 year of continuous monitoring (from 14/03/2019 to 14/03/2020) were evaluated based on parametric analysis, pencil lead break testing, b-value analysis, and crack identification methods.

Three parameter inputs were used to connect strain measurement system with the AE data acquisition system: longitudinal strain at mid span, transverse strain at mid span, and concrete temperature at mid span. This provides the same time base and thus the synchronization for strain-temperature measurements and AE recorded signals.

An inverse analysis was conducted on strain measurements, using load-test data to calculate the position and load distributions of the vehicles crossing the viaduct. Action effects of traffic were identified along with the resulting AE signals, which provides a robust comparison and analysis basis with the high amount of synchronized data.

4.1 Parametric analysis

AE features were extracted from the recorded waves using AEwin program. The extracted features were analyzed and classified using single link clustering (Fig. 5). For each detected hit, AE features were extracted with the corresponding values of the input parameters of strain (parametric 1), and temperature (parametric 2). They are defined as follows [41]:

  • Channel is a single AE sensor and the related equipment components for transmitting conditioning, detecting and measuring the signals that come from it.

  • Rise time is the time from first threshold crossing the highest voltage point in the waveform (µs).

  • Counts to peak (Pcount) is the number of threshold crossings from first to highest voltage point on the waveform.

  • Counts is the number of times the signal crosses the detection threshold.

  • Energy is the time integral of the absolute energy signal voltage.

  • Duration is the time from first to last threshold crossing (µs).

  • Amplitude is the highest voltage in the AE waveform expressed on decibel (dB).

  • Average frequency (AF) is equal to counts divided by duration (kHz).

  • Reverberation Frequency is equal to (counts—counts to peak) divided by (duration—rise time) (kHz).

  • Initiation frequency is equal to counts to peak divided by rise time (kHz).

  • Absolute energy (ABSenergy) is the time integral of the square of the signal voltage at the sensor before any amplification divided by 10kΩ impedance and expressed in attojoules (aJ).

  • Frequency centroid is the center of mass of the power spectrum graph (kHz).

  • Peak frequency is the point where the power spectrum if greatest (kHz).

  • Event is a local material change giving rise to AE.

  • Hit is the process of detecting and measuring an AE signal on a channel.

Fig. 5
figure 5

Single link clustering of AE features

From Fig. 5, it can be observed that average frequency (AF) and reverberation frequency were highly correlated. Therefore, the AF was selected to perform the analysis while the peak frequency, initiation frequency, and frequency centroid will be investigated in future work. Similarly, counts to peak, duration, and absolute energy were selected for data processing, because of the high correlation of rise time—counts to peak, counts—duration and energy—absolute energy.

Parametric analysis was performed using the selected AE features along with the amplitude of the signals and the input parameters, i.e. strain and temperature. The recorded waves during 1 year of monitoring were extracted and analyzed using AEwin program and Matlab. The annual variation of the selected AE features was calculated for the 24 channels.

4.2 Pencil break

Pencil lead break testing is a preferred method for calibrating and evaluating the precision of the AE instrumentation since it presents an accurate mechanical source to identify propagation velocity characteristics and source location accuracy [42]. Pencil lead is pressed against the target surface until lead breaks generating a release of accumulated stress in the form of elastic waves. Lead break localization and wave velocity calculation can be performed to evaluate the tested material. Pencil lead break testing was used to investigate the AE activity during traffic loading and to measure the velocity of stress waves. In general, concrete with a P-wave velocity of more than 3500 or 4500 m/s is evaluated to be good or excellent, while concrete with a velocity less than 3000 or 2000 m/s is considered as poor or very poor [43].

4.3 Cracking process

Cracking of concrete is different from metals; it is preceded by microcracking instead of yielding. It is, therefore, characterized by a fracture zone and not a crack tip, where the stresses are decreasing when deformation is increasing [44]. Figure 6 shows how AE features vary during concrete cracking. The friction at the level of fracture zone and between existing cracks creates slow transverse/shear waves (Fig. 6b), while the creation of a new crack with two separated surfaces and the opening and closing of existing cracks generate a variation in the volume, resulting in fast longitudinal/compression waves (Fig. 6a).

Fig. 6
figure 6

AE features during cracking process of concrete

Concrete under high-cycle fatigue loading goes through crack nucleation, crack propagation and finally apparition of long cracks until failure [45]. The concrete of the 60-year slab is estimated to be in the stage of crack propagation.

4.4 Cracking modes

Wave modes are exited differently with different cracking types. Tensile cracks cause a transient volumetric change inside the material, converting the released energy mainly into P-waves. The resultant AE events are longitudinal waves of large amplitude and frequency, faster than any other wave type, and the resulting rise time is short (Fig. 6a). For shear cracks, the major part of generated waves is S-waves. The maximum amplitude arrives later than the first arrivals giving longer rise time (Fig. 6b).

Crack classification into tensile mode and shear mode was estimated using a correlation of AF variation versus RA value, which is equal to the rise time divided by amplitude expressed in ms/V (Eq. 1):

$${\text{RA}} = \frac{{{\text{Rise}}\;{\text{time}}}}{{{\text{Amplitude}}}}.$$
(1)

The cracking behavior of concrete can be classified into tensile mode when high AF is detected with low RA value [46,47,48,49,50]. It occurs when cracks are nucleated and opened. Shear cracking mode is characterized by high RA value and low AF, and it is detected with the fretting or sliding of existing cracks.

4.5 b-value analysis

The b-value is a statistical method used to evaluate AE amplitude-frequency distribution. The b-value is increasing with the increase of the proportion of AE events with low amplitudes and decreasing when the proportion of AE events with high amplitude is increasing. The emergence of microcracks generates a large number of AE events with low amplitudes, so the b -value is high. While the formation of macrocracks generates a large number of AE events with high amplitudes, the b-value is small. Therefore, changes of b-value are a suitable reference to analyze the cracking process of concrete [51].

The b-value analysis was first established by Gutenberg–Richter in 1949 [52], with their law stipulating that microcracks generate many hits of small amplitude, while macrocracks generate few hits of large amplitude. The Gutenberg–Richter relation is presented in Eq. 1 in terms of AE parameters.

$$\log_{10} N = a - b\left( {\frac{{A_{{{\text{dB}}}} }}{20}} \right),$$
(2)

where N is the number of AE hits with amplitudes greater than Adb, Adb is the amplitude in dB, a is an empirical constant, b is the b-value.

Table 2 summarizes the type of cracking and cracking process based on b-value variation, according to studies performed on rock mechanics [53] and RC girders by [24].

Table 2 Quantitative result analysis [24, 53]

5 Results

5.1 Pencil break results

Pencil lead break testing was performed after setting up the monitoring system to evaluate AE activity under traffic and calculate the velocity of stress waves. AE events are simulated by pencil lead breaks. Simulations were repeated to record both longitudinal and surface waves.

The simulated events were localized using AEwin program, in which the velocity was varied with each simulation to obtain the exact location of the simulated AE event. Moreover, time-domain interpretation of AE events was carried out to calculate stress wave velocity based on first arrivals of longitudinal waves, which were clearly observed. Stress wave velocity is found to be equal to 3400 m/s ± 100 m/s based on event localization and time-domain interpretation. Therefore, the 60-year-old concrete can be considered in a “good condition” [43].

Data of pencil lead break testing was used to identify classes of AE data. The characteristics of generated acoustic signals in solids during the formation of cracks are similar to the generated acoustic signals due to pencil breaks [54]. AE features collected during 3 min of pencil lead break testing under regular traffic was classified into two groups as it is illustrated in Fig. 7. The absolute energy, duration, and Pcount are plotted versus the amplitude for the 4301-recorded hits from the 24 channels.

Fig. 7
figure 7

Results of pencil break test under traffic

The AE activity due to pencil break test is characterized by high amplitudes (> 80 dB), and high absolute energy (> 106 aJ), low durations (< 104 µs), and low counts to peak, while the AE activity due to traffic presents lower absolute energy and amplitudes.

The AE activity due to traffic and the one due to pencil break that is similar to crack-like signals are forming two visible clusters. It can be concluded that no cracking formation is present in the slab during the test.

This result is based on data recorded for 3 min considering only surface simulations and can thus not be conclusive about the condition of the slab. Therefore, a detailed investigation of the annual variations of AE features is performed.

5.2 AE features

AE events were present during the passage of vehicles, and after the passage of heavy trucks and rarely during the absence of traffic. The 24 channels had recorded a total of 47,640,543 hits during the period of monitoring, from 14/03/2019 to 14/03/2020. The acoustic emission activity in concrete is due to the principal source associated with concrete cracking and secondary sources including friction, opening, and closure of existing cracks.

Hits characterized by high energy (> 106 aJ) are mostly related to AE activity due to concrete cracking [55].

A total of 1033 AE hits with absolute energy higher than 106 aJ and amplitudes higher than 75 dB were recorded for channels at the mid-span. It can be argued that the cracking activity in concrete is active, but its evolution in time is very slow, i.e. 1.66 10–4/year which corresponds to the ratio of hits with the high amplitude-energy and the number of the total AE hits. The other AE events are mostly due to crack movement at the level of fracture zone and to friction, opening, and closing of existing cracks.

The annual variation of AE features gives qualitative indications about the condition of concrete. In the following section, AE features were analyzed along with temperature and strain variations, using the input parameters to evaluate the influence of traffic and temperature on crack process and investigate the source of AE activity.

5.3 AE features and temperature

Figure 8 presents the annual variation of the temperature of concrete, with the AE features of Channel 6 and the strain of longitudinal and transverse rebars at the mid-span. To illustrate the annual effect of temperature, the moving average of the maximum values of the AE features was calculated and presented as a thick line. Similarly, the moving average of thermal strain \(\epsilon_{{{\text{T}}/{\text{longitudinal}}}}\) and \(\epsilon_{{{\text{T}}/{\text{transverse}}}}\) was plotted, respectively, for longitudinal and cross sections.

Fig. 8
figure 8

Annual variation of amplitude, absolute energy, AF and Pcount of Channel 6, and longitudinal and transverse thermal strain, and temperature of concrete

The maximum values of amplitude, absolute energy, and Pcount were decreasing with the increase in temperature while the AF was increasing. Similar observations were found for daily cycles.

The increase in temperature generates an increase of longitudinal thermal strain and a decrease of transverse thermal strain due to material expansion and boundary conditions. Thermal variation is, therefore, inducing daily and seasonal microcrack movement and internal microcracking. Microcracks are opening and closing according to their orientation-regarded longitudinal and transverse sections. The opening and closing of microcracks are cyclic following the daily and seasonal temperature variations which demonstrate the stability of the cracking activity in the RC slab.

The energy required to open the microcracks under traffic loading is less during summer if they are opening with temperature increase and their size is assumed to be constant. This explains the decrease of the calculated values of the absolute energy, amplitude, duration, and Pcount with temperature increase.

The observed trend of thermal variation of AE features was different when the temperature of concrete is less than zero degrees Celsius. This can be due to the thaw–freeze of concrete. The ice formation can be initiated in pores with interstitial solution for low-temperature conditions. The pore solution can freeze and highly porous border zones around aggregate might be separated from the ice front through smaller cement matrix pores leading to high hydrostatic pressure [56]. This pressure can create the opening and closing of existing microcracks, generating more AE events under low temperatures.

5.4 AE features and strain

AE response was evaluated along with strain variation of rebars on the same time scale. AE features were analyzed for randomly selected vehicles with different weights and positions. The method used to calculate the weight and the position of the vehicles is based on strain measurements and can be found in [38].

An example of AE response and strain variation is presented in Fig. 9 when a light vehicle and a heavy truck crossed the road viaduct separately. The light vehicle had a weight of 16.2 kN and it was crossing the viaduct from Travers direction, while the heavy truck had a weight of 330 kN with three axles and it was crossing the viaduct from Neuchâtel direction. The response of Channel 6 was plotted with the variation of the longitudinal strain at mid-span.

Fig. 9
figure 9

Variation of longitudinal strain and AE features of Channel 6 during the passage of a light vehicle and a heavy truck

The hits generated by the heavy truck were characterized by lower values of absolute energy and Pcount and higher values of AF, while no difference was observed for duration and amplitude.

Light-vehicle passage lasts less than 1 s, generating 8 hits in Channel 6. The released energy is concentrated at the beginning of the passage where the maximum compression of longitudinal rebar and the maximum tension of transverse rebar are occurring.

Truck passage lasts 2 s generating 12 hits in Channel 6. The released energy is distributed among the axles and reaches the maximum with the passage of the last one. The stored elastic strain energy is first steadily built up with each axle until it reaches the maximum with the last axle. This observation was valid also for many other passages.

By analyzing many hits due to both light vehicles (weight < 35 kN) and trucks (weight ≥ 35 kN), it was observed that the AE activity due to light vehicles crossing the road-viaduct was not detected by all Channels, while AE due to trucks was detected by all the Channels during loading and for some heavy trucks also during unloading. This can be due to the process of opening and closing of microcracks during and after the passage. The maximum values of absolute energy and amplitude were recorded when the maximum strain is reached in longitudinal and transverse rebars as shown in Fig. 9.

The generated hits that correspond to light vehicles crossing the viaduct were characterized by higher values of absolute energy, Pcount and duration, and lower values of AF compared to heavy trucks. In fact, light vehicles generate a low number of hits where the total energy is concentrated giving high values of absolute energy per hit. Moreover, the speed of light vehicles is generally higher than the one for trucks, which can generate hits containing more than one AE event, which gives higher values of duration.

The crossing of heavy trucks generates lower absolute energy and lower duration per hit. Trucks have lower speeds and many axles that generate many hits one after the other. The absolute energy is defined as the time integral of the square of the signal voltage. The lower values of the energy calculated when trucks were crossing the road-viaduct can, therefore, be due to low values of duration.

This observation was demonstrated by analyzing the high values of absolute energy that corresponds to light vehicles. They were found to be related to events with high durations and normal amplitudes. The variation of absolute energy should be evaluated along with the variation of duration. Moreover, this energy is split into local energies since each axle is generating many events. The distribution of the total energy is giving lower values of energy per hit compared to the ones produced by light vehicles concentrated in one or two hits. This means that the speed of loading and the number of axles are influencing the detected AE energy.

AF values for trucks were higher because the generated AE signals cross the detection threshold many times compared to the AE signals generated by light vehicles. In contrast, both amplitude and Pcount variations present different trends for both light vehicles and trucks.

The presented truck in Fig. 9 was crossing the road viaduct from Neuchâtel direction, while the light vehicle was crossing from Travers direction. The annual mean and maximum of AE features were evaluated according to the direction of crossing. It was found that the Pcount and duration were higher for vehicles in the Neuchâtel direction,while absolute energy, amplitude, and AF were independent on the position of the vehicles. It can be concluded that amplitude, absolute energy, and AF depend more on the weight while duration and Pcount are related to the position and the weight of the vehicles and the position of the AE sensors.

5.5 Correlations and statistics

The number of AE hits detected by every channel is different for the same conditions of loading. The number of hits is a simple method to evaluate the AE activity near the sensors. The presence of many hits can indicate an active cracking process near the channel, while small number of hits indicates a stable condition. In Fig. 10, the generated AE hits for the 24 channels are presented.

Fig. 10
figure 10

Annual AE hits for the 24 channels

The recorded hits in channels 2, 3, 4, 9, 10, 13, 18, and 23 were significantly higher. This observation can be attributed to AE source originating from small relative displacement between the slab and the girder. Furthermore, channels near the slab–girder connection (i.e. Channels 9, 10, 18, 13, 2, 23) were detecting almost similar number of hits, and high values of absolute energy (> 107 aJ), duration, and Pcount. Channels near the support (Channels 2, 3, 4) were detecting similar number of events and higher absolute energy, while channels in the mid-span were detecting lower number of events and lower absolute energy (mostly < 106 aJ).

The variation of AE features presents apparent similarities and differences regarding the position of sensors which can be due to the existence of different sources of AE. Therefore, four grids were defined to evaluate AE activity in different locations and address the scatter of AE response.

Grid 1 comprises Channels 5, 6, 7, 17, 21, 22, to evaluate the AE activity in the mid-span. Grid 2 comprises Channels 2, 9, 10, 13, 18, 23 to evaluate the condition of the connection slab-girder. Grid 3 comprises Channels 2, 3, 4 near the support, and Grid 4 comprises Channels 13, 14, 15, 16 near the articulation.

The daily mean of the AE features for the week 06/05/2019–12/05/2019 was calculated for each grid and illustrated in Fig. 11, Table 3 with the number of light vehicles and trucks per day.

Fig. 11
figure 11

Variation of AE features per grid for one week

Table 3 Number of light vehicles (< 3.5t) and heavy trucks (≥ 3.5t)

The daily mean values of amplitude were varying in the range of 43–50 dB for all grids and did not present significant changes. While the difference between grids was more apparent for absolute energy, duration, and Pcount, the highest values were recorded in Grids 2 and 3 and in Grid 1 for the AF.

The daily mean values depend on the number of vehicles and their type. AF was higher during weekends while the rest of AE features were higher during weekdays where the number of heavy trucks was more pronounced. Similar variations were observed for other weeks. Duration and Pcount on Friday show the same tendency with weekend. This can be due to the number of trucks with weights between 3.5 t and 10 t, which are more frequent on Friday. These trucks have different speed and number of axles that are influencing the duration of the detected hits and the number of counts.

These weekday variations are due to the opening and closing of microcracks with the passage of heavy trucks. The difference between channels in mid-span and channels near the articulation, support and connection slab-girder demonstrates the existence of a second source of AE, mostly due to friction between different elements. In the following section, the cracking process will be classified into tensile and shear modes to clarify the source of AE activity for each grid.

5.6 Characterization of cracking

AF and RA values were calculated from the moving average of 100 AE Hits. The ratio of the abscissa scale to the ordinate scale is set to 50 according to the recommendations of RILEM TC 212-ACD [49]. Aggelis [47] has shown that tensile matrix cracking of concrete results in AF higher than approximately 50 kHz, which corresponds to a RA value of 2,500 ms/V. This value of AF is assumed to be valid for the case study to classify cracking modes. Classification of AE events into tensile mode, shear mode, and mixed mode was,, therefore, determined based on values presented in Table 4, Fig. 12.

Table 4 RA and AF values for cracking mode classification
Fig. 12
figure 12

RA value analysis for Grid 1 at mid-span

It is estimated that pure tensile mode is due to the expansion of microcrack region, while mixed mode is due to the opening and closing of existing microcracks. Shear mode is assumed to be due to friction between existing microcracks, friction between the slab and the girder, and friction at the level of the support and articulation. Table 5 presents the obtained percentage of the cracking modes for each grid.

Table 5 Cracking mode classification per grid

At mid-span, 1% AE events were classified as shear mode and 4% as tensile mode, while 95% was classified as mixed mode. This means that the AE activity is generated mostly by the opening and closing of existing microcracks and friction at the level of the fracture process zone, while 4% of the detected AE activity is due to the expansion of microcracks.

Shear mode was higher near the support and the articulation and near the slab-girder connection, while tensile mode was lower. This confirms that 14–20% of the generated AE events for Grids 2–4 are due to the friction between the slab and the girder and at the level of the articulation and the support, while the expansion of microcracks presents less than 3% of the total AE activity.

The opening and closing of existing microcracks are estimated to be the main source of the AE activity along the slab. To investigate with more detail the nature of cracking process, b-value analysis is performed in the following section.

5.7 b-value analysis

The b-value analysis was performed for the AE events recorded during one year of continuous monitoring under traffic and environmental loading. Linear least square method was used to calculate the slope of amplitude–frequency distribution. It is, therefore, necessary to select appropriate number of AE hits. When the selected number is small, the oscillations are too strong, masking the general trend. If the number is too large, any small incidence producing just a small number of events would be undermined in the average of the large events. During laboratory tests, it was found that 50 is an appropriate sample size to perform b-value analysis [57]. However, such recommendations are not available for AE events generated under real traffic and environmental conditions.

To determine the proper number of AE events for b-value calculations, correlation coefficients between the logarithmic frequency log10 N and amplitude Adb were calculated and presented in Fig. 13. It was found that in all channels, the relation between the logarithmic cumulative frequency and amplitude gives proper straight lines when the number of AE events is larger than 1500.

Fig. 13
figure 13

Correlation between the logarithmic frequency log10 N and amplitude Adb

Therefore, b-values were calculated using two sets of amplitude-frequency based on least squares curve-fit: amplitudes due to 1500 successive hits (Fig. 14) and daily amplitudes (Fig. 15). The limits of b-value ranges (1, 1.2, and 1.7) presented in Table 2 are plotted with red dashed lines.

Fig. 14
figure 14

b-value based on 1500 events

Fig. 15
figure 15

Daily b-values for the period of monitoring 14/03/2019 to 14/03/2020

The calculations based on 1500 events show different trends of b-value and higher values for the four grids, implying changes in the range [1, 5]. 66% of the values were in the range [1.2, 1.7] indicating uniform distribution of microcracks (39% for Grid 1, 71% for Grid 2, 75% for Grid 3, and 77% for Grid 4). The source of the AE events related to these values is, therefore, the movement of the two crack surfaces of existing microcracks during traffic and environmental loading or friction at the level of fracture process zone, while the existing macrocracks are stable.

The few values in the range [1, 1.2] were about 2% of the total values. They are due to AE events recorded during low traffic periods, and they cannot refer to any cracking process, while the values higher than 1.7 were about 60% for Grid 1, 27% for Grid 2, 23% for Grid 3,and 21% for Grid 4. The values present stable variation in the range [1.7, 2.5] for the four grids with few values varying between 2 and 5. Values higher than 1.7 indicate the dominance of microcracks or the formation of macrocracks.

This indication is based on laboratory testing of RC girders subject to higher load magnitude, different from service loading. The loading process can change the AE response and make the direct comparison between laboratory tests and in-situ tests difficult. This was reported by [29] who had performed cyclic loading tests on RC girders using a loading protocol that is representative of realistic service-level loading. They found that defining absolute critical b-value can be unmeaning and that parallel observation of structural performance is needed. They have suggested analyzing the lowest b-values.

The lowest b-values were in the range of a uniform distribution of microcracks and they were following temperature variation. Hits that were giving low b-values (< 1) or high b-values (> 3) were generally associated with low traffic periods during nights or weekends. Besides, b-value trends were presenting stable annual variation and no visible active macrocracks were detected in the RC slab. These results show that the RC slab has uniform microcracks and stable macrocracks. b-value analysis was also performed for the defined grids using daily values of amplitude-frequency (Fig. 15).

The general trend of b-value is more visible with the daily variations. The annual b-value was varying in the range [1.5, 2] following thermal variations. Values less than 1.2 were about 16% of the total values for the four grids, while values between 1.2 and 1.7 were about 50% of the calculated values. Therefore, the AE activity in concrete is mainly due to the opening of microcracks during summer and closing during winter. The cyclic annual trend of b-value demonstrates the stability of existing cracks. b-value range implies the existence of uniformly distributed microcracks and stable macrocracks. Values higher than 1.7 were about 22% for Grid 1, 30% for Grid 2, 45% for Grid 3 and 38% for Grid 4. This implies that microcracks are dominant or macrocracks are opening. Those variations are present during summer when existing microcracks and stable macrocracks are opening with the increase in temperature.

6 Conclusions

The paper presents the parametric and statistical analyses carried out on AE data and strain measurements recorded during 1 year of continuous monitoring of an RC bridge deck slab under traffic loading and environmental changes.

Despite the challenges of on-site assessment of bridges, the presented monitoring approach demonstrated that assessment of the structural response and characteristics under operational loading and environmental changes are feasible and can be done within reasonable postprocessing work. Five main conclusions are drawn:

  • The instrumentation, calibration, and synchronization of the used techniques present solid recommendations for the assessment of RC road bridge deck slabs using AE and strain measurements.

  • The presented monitoring data and applied processing methods are appropriate to quantify the influence of environmental and operational conditions on the structural behavior of road bridge elements.

  • The variability of AE features under traffic and environmental changes have been determined using 1 year of continuous monitoring. The findings should be considered when performing short-term monitoring or translating AE laboratory knowledge to the field.

  • The structural characteristics, i.e. the condition of the support, the articulation, and the slab–girder connection are affecting differently the AE activity of the nearest sensors. This result allows to assess in time different components of road bridges.

  • The use of b-value analysis and cracking mode classification on long-term monitoring data provides the source and the evolution in time of the cracking activity of concrete, in case operational loading and thermal variations are known.

The cyclic response of AE sensors and strain gauges demonstrates the robustness of the monitoring approach to assess the operational conditions of road bridges. The deployment of the monitoring data using signal-based technique, frequency analysis, and AE localization will be presented in further work.