Introduction

The peculiarity of thin oil rim reservoirs irrespective of the depletion strategies used as described by Masoudi (2013) is such that at onset of production high water cuts and gas oil ratios are experienced. This is due to the nature of oil rim reservoirs with gas caps and aquifers larger in volume and size than the oil rim. Although Olabode et al. (2019) had developed a numerical method to predict post water and gas coning, this method is not sufficient enough as it did not incorporate oil rim parameters. Thus, optimizing production and reservoir parameters are key to optimizing oil recovery in oil rim reservoirs. Ibunkun (2011) listed factors affecting productivity of oil rim reservoirs. Olabode (2020) highlighted important parameters that affects oil rim productivity through a sensitivity analysis study. In their study, size of gas cap and aquifer, well placement and length, pay thickness and horizontal well placement are factors that affect oil rim productivity. The effectiveness of horizontal wells over vertical wells in normal reservoirs has been extensively studied by Olabode and Egeonu (2017) and extensively studied in oil rim reservoirs by Olabode et al. (2018a), Akpabio et al. (2013), Haug et al. (1991) and Kolbikov (2012). In their estimation of oil recovery via improved methods in oil rim reservoirs, Zakirov and Zakirov (1996) proposed four types of oil rims with two approaches to development. The short fall of the background lies in the fact that few parameters used do not fall under the category of important uncertainties as discussed by Olabode (2020). In their summary of the effect of well placement on thin oil rims with bottom and edge water drive, Kabir et al. (2004) analyzed that well placement relative to fluid contact among other less essential factors is essential to optimizing oil recovery. Optimizing horizontal well placement in oil rim reservoirs is essential to oil recovery as noted by Ogiriki et al. (2018), Carpenter (2015) and Keng et al. (2014). Much of their work focused on a single type of oil rim reservoir, use of few important parameters that affect productivity, focus on horizontal well length and neglect of parameters such as height of oil rim, sizes the gas caps and aquifers. Iyare and Marcelle-De silva (2012) considered the effect of well placement based on gas cap and aquifer strength. The authors only considered the strength of the gas caps based on a static variable of the aquifer strength with respect to the fluid contacts.

To maximally optimize production in oil rim reservoirs, important parameters to oil recovery are essential in building the reservoir models. Considering these parameters would dislodge the idea of placing the wells at the fluids contacts but at varying ratios from the fluid contacts. Thus, considering other important factors, proper well placements are essential for reducing water and gas coning, maximizing oil recovery, predicting and forecasting reservoir productivity (Olabode et al. 2018b) and maximizing oil recovery before commencing secondary and enhanced oil recovery (Olabode et al. 2018c).

Methodology

The grid design is built following the method adopted by Olabode (2020). An experimental method of design (Placket Burman) is used to design 4 oil rim models based on the uncertainties in Table 1. These factors and their values are selected over a wider range of oil rim reservoirs in the Niger-delta region. The well placement option is omitted from the design analysis but done manually to accommodate for proper allocation of the variable. The black oil option of the ECLIPSE software is built with correlations for PVT and solution (as found in figures a, b, c, d and e in “Appendix A”) properties which is used to initialize the models to estimate the initial oil in place (IOIP) and initial gas in place (IGIP) (Table 2). The other fluid properties of concern are included in the experimental design analysis. The result from the design in Table 1 forms 18 oil rim models out of which 4 models are selected for horizontal well placement optimization. The selected reservoir models have varying reservoir and operational properties (Table 3) and are summarized as:

Table 1 Design of experiment variable
Table 2 Initialized fluids in place
Table 3 Model properties
  1. 1.

    Oil rim with large gas caps and aquifers.

  2. 2.

    Oil rims with large gas caps and small aquifer.

  3. 3.

    Oil rims small gas caps and large aquifers and

  4. 4.

    Oil rims with small gas caps and aquifers.

The grid is designed using the full grid plan of the models showing their respective oil saturations are displayed in Figs. 5, 6, 7 and 8 in “Appendix A.”

The grid sections are modeled at 20 by 20 by 41 at a Datum depth of 7000 ft. with porosity values in Table 12 in “Appendix A” (for Model II). The last 6400 cells are denoted with a porosity value of zero. Other reservoir and dynamic properties used in building the models are found in Tables 1 and 3. A conventional method of selecting well placement relative to fluid contact is done by viewing the section of the models with high oil saturation and varying the placements based on the pay thickness of that particular model and multiplying by some factors. The multiplying factors are 0.25 ft., 0.5 ft. and 0.75 ft. The sizes of each cells in the z direction of the models depict the pay thickness of the models as described in Table 13 in “Appendix A” (for Model II). The green section of Table 4 is the dimension of the model representing the oil column. Table 14 in “Appendix A” describes the respective fluid contacts for the models which when subtracted amounts to the thickness of the oil column (i.e., WOC minus GOC).

Table 4 Well placement coordinates for Model II

Thus, for an oil rim with a large gas cap and small aquifer;

$$@ 0.75\,{\text{ft}}.,\;{\text{placement}}\;{\text{will}}\;{\text{be}}\;{\text{at}}\;0.75*72 = 54\,{\text{ft}}.$$
$$@0.5\,{\text{ft}}.\;{\text{placement}}\;{\text{will}}\;{\text{be}}\;{\text{at}}\;0.5*72 = 36\,{\text{ft}}.$$
$$@0.25\,{\text{ft}}.\;{\text{placement}}\;{\text{will}}\;{\text{be}}\;{\text{at}}\;0.25*72 = 18\,{\text{ft}}.$$

The grid design is in Cartesian and block centered option; thus, well locations will be in the x, y and z directions. The k direction represents the two options available for completions (k upper and k lower). Tables 4, 5, 6 and 7 show selected locations of completions for each of the models based on the above explanation. The models are depleted under a simultaneous production at the onset from two horizontal wells (oil and gas) completed at varying distances from the fluid contacts. The oil production rates for the models range between 1200 and 3000 stb/day with a gas oil ratio constraint range in Table 1 item 13.

Table 5 Well placement coordinates for Model III
Table 6 Well placement coordinates for Model IV
Table 7 Well placement coordinates for Model I

Well completions at mid-stream of the pay thickness is introduced in models I and IV.

Results

The production profiles for each well placements under a model would have been the best to depict trend of fluid productivity, but due to large parameters of gas produced, the production profile is split to be viewed on individual well placement basis. Thus, the focus here will be on oil recovery, gas produced and the water cuts.

Model I

The plots in Fig. 1 is that of respective production profiles for model I (large gas cap and aquifer). Figure 1c suggests that for an oil rim with large cap and aquifer, well placement at mid-stream is best for optimum oil recovery at 9.36%. At this oil recovery, gas production is still substantial and produced water cut minimal. Table 8 explains the summary of production from model I. Completing the well at the water oil contact resulted in a low recovery for both oil and gas.

Fig. 1
figure 1

a Oil recovery. b Gas production. c Well water cuts. d Well production rates

Table 8 Summary of Model I production

Model II

Figure 2a–d illustrates the production profiles for an oil rim with a larger gas cap compared to the aquifer. The reservoir is dipping at 1.5° with a pay zone of 65 ft. The oil recovery result shows (Fig. 2a) that completing the well at a position of 0.75 ft of the pay zone with respect to the gas oil contact is optimum for oil recovery. The oil recovery rate reduces as the completion is varied close to the gas oil contact. The water cut and rates also follow a similar trend of increases in water cuts as placement is further away from gas oil contact with a faster decline in production rates.

Fig. 2
figure 2

a Oil recovery. b Gas production. c Well water cuts. d Well production rates

The summary of oil recovery and gas production is displayed in Table 9.

Table 9 Summary of Model II production

Model III

The oil rim model has a larger aquifer compared to the gas cap. The pay thickness is 20 ft. and is dipping at an angle of 1.5°.

Figures 3a–d represents the production profile for this oil rim reservoir. As in the case of model II, placing the wells away from the water oil contact increases the oil recovery (Fig. 3a) and closer to the water oil contact increases water cut as noticed in Fig. 3c. Table 10 illustrates the values of the oil recovery and gas production for Model III.

Fig. 3
figure 3

a Oil recovery profile. b Gas production. c Oil production rate profile. d Water cut profile

Table 10 Summary of Model III production

Model IV

The model with small gas cap and aquifer has a thickness of 20 ft. and also dipping at 1.5°. Due to the nature of the weak drives (gas cap and aquifer), the oil recovery results are low (Table 11, Fig. 4a) when compared with other models. For this case scenario, the order of oil recovery is completion closer to GOC is greater than completion at mid-stream and is greater than completion closer to the WOC. There is an appreciable gas production that has not hindered oil production while the model recorded an average production rate and water cuts (Fig. 4b–d).

Table 11 Summary of model IV production
Fig. 4
figure 4

a Oil recovery profile. b Gas production. c Oil production profile. d Water cut profile

Conclusion and recommendation

For optimum recovery of oil and gas from oil rim reservoirs, placements of horizontal wells must be done based on the sizes or strengths of the reservoir drive mechanisms, in this case basically the gas cap and aquifer. Under a concurrent production of oil and gas, this procedure is essential to prevent the production of gas jeopardizing that of oil and vice versa. Varying the horizontal well placement with respect to the fluid contacts for oil rims under this production scenario helps to determine the optimum well placement to effectively produce gas and oil. The production and subsequent sales of gas ensure project viability and improve the net present value. Optimizing production parameters such as well placement is essential for optimizing oil recovery in ultra-thin oil rim reservoirs before the implementation of secondary and enhanced oil recovery as described by Olabode et al. (2018c). Enhanced oil recovery methods introduced by Olabode et al. (2020a) and Olabode et al. (2020b) for heavy oil reservoirs can also be considered for heavy-medium oil rim reservoirs. These models can be used as a matrix for similar field case studies.

The authors have fully followed the code and ethics in the development of this manuscripts as it relates to sources and usage of data and abiding to publishing principles. Also, there exists no conflict of interests in the development of this research.